Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Whither the Mining Engineer Degree?

    By J. B. Evans

    "THE OPPORTUNITY to participate in a CIM seminarconcerning the direction of mining engineer trainingis perhaps fortuitous as it comes at a time when theengineering schools which have invited inspectio

    Jan 1, 1972

  • CIM
    Effective Integration of Environmental Leadership and Environmental Management Systems within Cameco?s Mining Division

    By K. Nagy

    To support the implementation of its integrated SHEQ Policy, Cameco has undertaken an environmental leadership initiative with the goal of moving beyond regulatory compliance and significantly reducin

    Aug 1, 2010

  • CIM
    CRIRSCO-Russia Protocol 2008 (Multi-Jurisdiction) - Protocol of Intentions between Russia and CRIRSCO

    "In 2008, the Committee for Mineral Reserves and International Reporting Standards (CRIRSCO) and the Russian State Commission on Mineral Reserves (GKZ) entered into an agreement leading towards harmon

    Jan 1, 2003

  • CIM
    Uranium Developments: Aquatic Risk Assessment and Management

    By P. M. Chapman

    Risks to aquatic receiving environments from uranium mining and milling fall into three categories: physical (habitat change), chemical (e.g., uranium, selenium, total dissolved solids [TDS], metals i

    Aug 1, 2010

  • CIM
    Geomechanical Assessment for Drifts and Chambers Development in the Athabasca Basin

    By Theophile Yameogo

    Much has been said about the methodology of geomechanical design in underground excavations. However, the geological, hydrogeological and geotechnical complexities encountered at t

    Aug 1, 2010

  • CIM
    Cover Systems for the Uranium Industry: Are We Doing it Right?

    By Ward G. Wilson

    Best practice in the design and construction of soil cover systems for mine waste management has advanced extensively over the past two decades. While significant progress has been achieved, we still

    Aug 1, 2010

  • CIM
    Overcoming the Geotechnical Challenges of Drift Development at the Unconformity in the Athabasca Basin

    By Theophile Yameogo

    The rock mechanics literature has documented the challenges, failures and successes of tunneling through weak rocks. Cases usually deal with low RMR rock masses or high stresses in a fractured zone. W

    Aug 1, 2010

  • CIM
    Bioleacidng of Fine Low Grade Copper Ores

    By M. Oliazadeh

    The bioleaching of fine low grade copper sulfide ore is described. A sample of ground (> 1 mm) copper ore from Sarcheshmeh, Iran, was subjected to a series of agglomeration procedures and subsequently

    Jan 1, 2007

  • CIM
    Determination of the Constitutive Behaviour of AA6022-T4 Aluminium Alloy Spot Welds at Large Strains

    By J. Kang

    There is increasing demand to utilize aluminium alloy sheets and their spot welds by the automotive industry. While traditional uniaxial tensile tests only determine mechanical properties to small str

    Jan 1, 2011

  • CIM
    The Development of Uranium Mining in Australia: a Look from the Past to the Future

    By John Battista

    Uranium mining in Australia has a chequered history. This paper reviews the development of the Australian uranium mining industry from the 1930?s to the present day. It outlines the geology of the var

    Aug 1, 2010

  • CIM
    Uranium Ionic Exchange Performance at KATCO

    By Sergio Bustos

    A significant expansion project is under way at KATCO?s Torkuduk In Situ Leaching (ISL) operation to increase uranium production up to about 4000 tU/year. Higher flows and lower uranium concentration

    Aug 1, 2010

  • CIM
    Uranium Ore Deposits: Geology and Processing Implications

    By C. L. Belyk

    There are fifteen accepted types of uranium ore deposits and at least forty subtypes readily identified around the world. Each deposit type has a unique geological model which may also have unique pro

    Aug 1, 2010

  • CIM
    Design and Permitting of a New Uranium Mill Facility in the United States

    By Kimberly Morrison

    Strategically located within the Uravan Mineral Belt District of western Colorado, the Piñon Ridge Project is the first new uranium mill being proposed for construction in the United States in over 25

    Aug 1, 2010

  • CIM
    Bacterial Leacidng of a Copper Sulphide Ore Containing Activated Pyrite

    By Z. Manafi

    Bioleaching of a copper sulfide ore containing "activated pyrite", using a mixed culture of mesophilic bacteria, was studied. This type of copper ore had been found unsuitable for flotation because it

    Jan 1, 2007

  • CIM
    Hydrocopper® for Treating Variable Copper Concentrates

    By L. Haavanlammi

    The Outokumpu HydroCopper® process is a chloride based atmospheric leaching process alternative that can treat a variety of different concentrates. Chalcopyrite and other copper sulfides can effective

    Jan 1, 2007

  • CIM
    Uranium Refining Without Solvent Extraction

    By A. Bhowmik

    Uranium Refining is the process in which undesirable neutron absorbing elements such as Boron (B), Gadolinium (Gd), Cadmium (Cd), Europium (Eu), Samarium (Sm) and other heavy metals (Fe, Ni, Co, Ca, M

    Aug 1, 2010

  • CIM
    Production of nano-Structured 5083 Aluminum Alloy by ARB Process and Evaluation Microstructure and Mechanical Properties

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    Autogenous Pyrolysis Process - An Enabling Technology for Production of Renewable Carbon for the Steel Industry

    By J. Donnelly, A. V. Deev

    Substitution of coal and coke by renewable carbon (charcoal) is a low-risk and low-capital path to 50% or more reduction in net CO2 emissions by the steel industry. However, the high cost of charcoal

    Jan 1, 2015

  • CIM
    Evolution of Texture During Accumulative Roll Bonding (ARB) of Nanostructured 5083 Aluminum Alloy

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    Dry drilling in underground production

    By E. M. De Souza

    "A scientific testing program, sponsored by the Mining Industry Research Organization of Canada (MIROC), was undertaken on the surface and underground facilities of Inca's Crean Hill Mine to inve

    Jan 1, 1992