Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Spirals and Reichert cone circuits

    By Thomas J. Ferree

    "IntroductionThe objective of this chapter is to provide important criteria relating to the operation and maintenance of spiral concentrators and Reichert cones, so that optimum performance can be ach

    Jan 1, 1989

  • CIM
    Hydro-Fracturing Versus Hydro-Shearing: A Critical Assessment of two Distinct Reservoir Stimulation Mechanisms

    By V. S. Gischig, G. Preisig

    Hydraulic stimulation of deep reservoirs is an essential procedure for developing engineered/enhanced geothermal systems (EGS), but also in other Geo-energy contexts. The goal is enhancing permeabilit

    Jan 1, 2015

  • CIM
    Influence of Compositional, Textural, Electrical and Electrochemical Properties of Natural Pyrite in Cu-Zn Sulfide Ores on its Flotation Properties

    By E. L. Chanturiya

    The research and characterisation for compositional, physicochemical, structural, electrical and flotation properties of various pyrite samples for a copper-zinc sulfide ore was carried out. Various m

    Jan 1, 2016

  • CIM
    The Lexington-Lone Star copper-gold porphyry: An Early Jurassic cratonic linear system, southern British Columbia

    By B. N. Church, R. H. Seraphim, J. T. Shearer

    "The Lexington-Lone Star CU-Au deposits straddle the Canada U. S.A. border, south of Greenwood, British Columbia. This 3 km long linear porphyry system occurs in a northeast dipping belt of sheared qu

    Jan 1, 1995

  • CIM
    Developing a Consistent Approach to Mine Reclamation - Cape Breton Development Corp. (CBDC) Mine Site Closure Program

    By Belinda Campbell

    Tools for Consistency 1. GIS Web Site 2. National Project Management System 3. Site Grouping Approach (721 PIDs) 4. Mine Reclamation Standing Offer Agreements ?Contracting tool 5. Remedial Object

    May 1, 2011

  • CIM
    A Review of Industrial Mineral Developments in Manitoba

    By E. Lee Cameron

    Summary Records of the past show that the first mineral production in what is now the Province of Manitoba consisted of salt, obtained about the year 1800 by the evaporation of brine. Also at an ea

    Jan 1, 1949

  • CIM
    Incorporating Radiant Heat Exchange into Finite Element Models of Hydrometallurgical Process Equipment

    By David McMullen

    Radiation plays a critical role in the thermal behaviour of hydrometallurgical process equipment. This effect is particularly important when designing refractory lined equipment used in pressure leac

    Jan 1, 2014

  • CIM
    Nondestructive Assessment of Aerospace Components by Means of Pulsed Thermography

    By A. Bendada, P. Servais, X. P. Maldague, C. Ibarra-Castanedo, C. Mohr

    Infrared (IR) thermography is a nondestructive, non-contact and non-intrusive technique that allows the fast inspection of large and complex structures with limited accessibility. Pulsed thermography

    Jan 1, 2006

  • CIM
    Inco's SO2 - Air Cyanide Removal Process

    By R. Vergunst, E. A. Devuyst, G. Robbins

    "INTRODUCTIONThe Inca process for continuous cyanide removal from industrial wastewaters was patented in 1984 by G.J. Borbely, et.al. (1). The process requires SO2, air, lime and a copper catalyst. Bo

    Jan 1, 1989

  • CIM
    Hadean Uranium Activity 3rd International Conference on Uranium (Uranium 2010), 40th Annual Hydrometallurgy Meeting

    By Therese Schneck

    The presence of xenon isotopes from in-situ spontaneous fission of short-lived Pu244 has been confirmed in Hadean detrital zircons from Western Australia. Hadean and meteoritic zircons can retain seco

    Aug 1, 2010

  • CIM
    The Interface of TiB2 and Al3Ti in Molten Aluminum

    By Haibin Ma, Jie Song, Qingyou Han, Xiaoming Wang, Wei Vian

    In the grain refinement of aluminum, Al3Ti and TiB2 particles are introduced to reduce the casting grain size down to 200 micrometer level, which makes cold working possible. The particles are brought

    Jan 1, 2015

  • CIM
    On The Use of Copper Concentrates Blended With Complex Gold Concentrate for Gold Recovery Using the SKS Smelting Process

    By Yan Jie

    A series of production technologies are described for gold recovery from complex gold concentrate blended with copper concentrate treated in the SKS smelting process comprising: 1) Feed preparation an

    Jan 1, 2019

  • CIM
    The Report of the Alberta Coal Commission, 1925: A Critical Analysis and Some Constructive Suggestions

    By J. A. H. Church

    The report is too voluminous to be considered in detail within the scope of a single paper, so I will confine my consideration of it to the broader aspects, leaving other members to deal with points o

    Jan 1, 1926

  • CIM
    The Importance of Accurate Rock Property and Virgin Rock Temperature Data in Ventilation and Cooling Planning Requirements

    By A. J. Russell

    "This paper investigates why it is critical for a mine to accurately determine thermal rock properties and virgin rock temperatures. Theoretical simulations of deep mining production zones have demons

    Jan 1, 2019

  • CIM
    Surfactant Protected Gold Particles: New Challenge for Gold-On-Carbon Catalysts

    By Laura Prati

    Gold-on-carbon catalysts resulted very active and selective in liquid phase oxidation [1, 2, 3] and during past studies we established that activity is ruled by two factors: particle dimension and gol

    Oct 1, 2003

  • CIM
    Rare Earth Elements in Malaysia: Overview of Processing, Sustainability and Environmental Impact

    By Nessetech Consulting, L. A. Cisternas, E. D. Galvez, S. H. Kuan, L. H. Saw

    "In Malaysia, there were two rare earths processing plants namely Asian Rare Earth (ARE) and the Malaysian Rare Earth Corporation Plant (MAREC) in Perak, which were operated until 1992 and were subseq

    Jan 1, 2016

  • CIM
    Effects of Minor Alloying Elements on Microstructure and Creep Properties of 8XXX Aluminum Conductor Alloys

    By Francis Breton, Lei Pan, Kun Liu

    "Effects of Fe, Cu and Mg minor alloying elements on creep properties of 8xxx aluminum conductor alloys were investigated by conducting compressive creep tests at 100 ºC under a constant load of 69 MP

    Jan 1, 2016

  • CIM
    Conditioning of Fractured Rock Masses for the Excavation with EPB Shields

    By A. Chieregato, C. G. Oñate Salazar, D. Martinelli, D. Peila, M. Barbero

    This paper is aimed to confirm the possibility to excavate fractured rock masses by using EPB shields, even in presence of relevant water tables. This verification is based on laboratory test experien

    Jan 1, 2015

  • CIM
    The Victor Project ? Ontario?s First Diamond Mine

    Agenda ? Where?s Victor ? What work was done to get approval to spend $982m ? a brief history ? Some project facts ? The triple bottom-line accomplishments to date ? Construction A Brief History

    May 1, 2006

  • CIM
    Test Production of Low Sulphur Rock Tailings at Inco's Clarabelle Mill

    By Glen Robertson, Jeff McLaughlin

    "The Clarabelle Mill rock tailings have the potential to generate sulphuric acid through chemical and biological oxidation of sulphide minerals. Current rock tailings assay between 0.80 -1.40 %S, with

    Jan 1, 1994