Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Role of Minor Nickel Additions on the Microstructure and Mechanical Properties of Al-Si-Mg-Cu Alloys

    By A. R. Farkoosh

    Al-Si based alloys have been recently used by automotive industry for highly stressed engine applications. Due to severe working conditions of the engine parts, existing alloys hardly endure high pres

    Jan 1, 2011

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Strength and Mechanism of Portland Cement Prepared from Stone Coal Vanadium Slag

    By P. Zhang, K. Liu, L. Ou

    "The strength and mechanism of Portland cement prepared from stone coal vanadium slag were studied in this paper. Initially, the slag was used as silicon raw materials to prepare clinker. By blending

    Jan 1, 2016

  • CIM
    Heating Plant, Old and New, at Preston Mines, Limited

    By R. A. Sullivan

    I T IS one of the unwritten policies at Preston Mines that we examine closely any method or tool that will help us in our constant battle against rising costs. It is our personal conviction that most

    Jan 1, 1962

  • CIM
    Current Technical Reports Under NI 43-101

    By Greg Gosson

    These materials are provided for general information purposes only and do not constitute legal advice. Readers are advised to seek specific legal advice from their own counsel in relation to any decis

    May 1, 2009

  • CIM
    Dynamic recrystallization in coarse-grained AZ31 alloy at elevated temperatures

    By L. Jiang

    This report investigated the dynamic recrystallization (DRX) phenomenon in magnesium alloy AZ31 billets to understand the deformation mechanisms and microstructure evolution during extrusion and other

    Jan 1, 2004

  • CIM
    Improving Ventilation at Hoyle Pond Mine with Monitoring and Control System

    By Barry Hope, Javier Rico

    "Goldcorp’s Hoyle Pond mine has recently completed several projects which have impacted the overall ventilation system. The project includes extending the Fresh Air Raise (FAR) to depth, development o

    Jan 1, 2019

  • CIM
    Laboratory Flotation Separation of Inco "Bulk" Matte

    By A. Mukherjee, C. Kelly, B. Markovich, G. E. Agar, G. E. Robertson, F. Khan, B. Shea

    "Laboratory batch flotation tests were performed on a sample of bulk slow cooled converter matte (Cu:Ni = I) to optimize the time in each of the separation stages. Numerical simulations were carried o

    Jan 1, 1996

  • CIM
    Development of a Chemical Model for the Solubility of Calcium Sulphate in Zinc Processing Solutions

    By V. G. Papangelakis, J. E. Dutrizac, G. Azimi

    A new model capable of predicting the solubility of calcium sulphate solid phases in zinc sulphate processing solutions from 25 to 95°C was developed. The model uses the Mixed Solvent Electrolyte (MSE

    Jan 1, 2008

  • CIM
    Morphology Dependent Behavior of Artificial Geomaterials Joints Modeling

    By M. Al Mukhtar, D. Hoxha, X. Brunetaud, D. P. Do, C. Auvray, L. Michel

    "Mechanical behavior of rock joints is often the key factor governing the response of complex structures constructed in fractured rock masses such as underground openings or of objects assembling vari

    Jan 1, 2015

  • CIM
    Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and Analysis

    By A. Saki, P. Gebski, W. Ying

    Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f

    Jan 1, 2011

  • CIM
    Convergence behaviour — packing relations of full extraction gate roadways at OAL lignite mine

    By C. Karpuz, Y. S. Istanbulluoglu

    This paper describes the results of convergence measurements conducted about five years for the re-use gate roadways at OAL lignite mine in Turkey. Double lignite seams separated with a marn layer, ar

    Jan 1, 1997

  • CIM
    Structural Control of Orebodies in Nova Scotia Gold Districts

    By H. L. Cameron

    Introduction Since the beginning of gold mining in Nova Scotia in the year 1860, the biggest problem o the mine operators has been to find and follow the ore zones in the narrow quartz veins. It wa

    Jan 1, 1947

  • CIM
    Values and impurities in base metal concentrates

    By M. J. Fairweather

    "The nature of minor element values and impurities are important both in the assessment of new properties and in the continuing improvement of operating plants. Impurity elements are frequently presen

    Jan 1, 1997

  • CIM
    A different role in designing new mining projects

    By J. K. Gowans

    The Research and Design group of the Project Development Division (PDD) of Placer Dome Inc. includes metallurgical, electrical, civil and mechanical engineers. They provide metallurgical research and

    Jan 1, 1998

  • CIM
    A simplified equation for estimating the total vapour pressure of cryolitic melts

    By Edgar Dernedde

    Cryolitic melts at a temperature of about 960 °C are used in reduction cells to dissolve alumina and to produce primary aluminium. At these temperatures cryolitic melts with an acidic composition have

    Jan 1, 2004

  • CIM
    Design and Application of New Series of Large Shaft Sinking Headframe

    By Z. Q. Liu, J. M. Du

    "On the basis of analyzing current design and applications, the structure form, working loads and design principles of shaft sinking headframe are summarized in this paper. To overcome the insufficien

    Jan 1, 2019

  • CIM
    Joining Geomechanical and Geophysical Monitoring at Coal and Ore Mines

    By V. V. Zubkov

    The systems of geophysical monitoring have been already put into operation at coal mines and ore mines. Since at present it is rather difficult to conduct mine experiments; it is necessary to start a

    Aug 1, 2013

  • CIM
    Two Dimensional Numerical Simulation of Fault Reactivation and Induced Seismicity

    By R. R. Song, Q. Li, H. Xing, X. C. Wei

    Geomechanical modelling of fault stability is an important part of CO2 capture and storage (CCS) research program to ensure its viability and long-term safety. Storage of CO2 in deep subsurface reserv

    Jan 1, 2015

  • CIM
    Coupled Hydromechanical Modeling of Rock Mass Response to Hydraulic Fracturing: Outcomes Related to the Enhancement of Fracture Permeability

    By M. Bustin, A. Hosseinian, G. Preisig

    Hydraulic fracturing and hydraulic shearing techniques are essential for the development of unconventional oil & gas and geothermal resources. Such techniques will also play a key role in the developm

    Jan 1, 2015