Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Preventive Maintenance Inspection in Coal Mines

    By P. E. Cavanagh

    FOR THE PAST seven years Mr. W. Simpson, Chief Mechanical Inspector for the Nova Scotia Department of Mines, has carried out exhaustive field trials of non-destructive inspection equipment in the coal

    Jan 1, 1956

  • CIM
    Commuting To Work At The Mattabi Mine

    By J. C. White

    "During the early development of the Mattabi Mine in 1970, discussions with the Ontario Government revealed their policy of prohibiting, as much as possible, the development of new, isolated, single-i

    Jan 1, 1976

  • CIM
    Leaping Forward in SAG and AG Mill Simulation using a Mechanistic Model Framework

    By R. M. de Carvalho

    Empirical and phenomenological models of SAG and AG mills have dominated the scene for the last few decades, being used nearly every time a mill is scale-up or an attempt is made to improve its perfor

    Jan 1, 2012

  • CIM
    Modification of Electrodes with Gold Nanoparticles

    By Fabio Terzi

    In this investigation some preliminary results are reported about the electrochemical oxidation of CO using goldbased encapsulated nanoparticles grafted on conducting substrate. The investigation has

    Oct 1, 2003

  • CIM
    Factors influencing the effectiveness of Split Set friction stabilizer bolts

    By M. W. Grabinsky, P. B. Tomory, J. Carvalho, J. H. Curran

    Many underground mining operations use Split Set friction stabilizer bolts for rock support. Currently, however, little has been done to quantify the effects of various rock mechanics and operational

    Jan 1, 1998

  • CIM
    Three Dimensional Simulation of Hydraulic Fracturing on Fault Using Lattice Element Method

    By X. Xu, J. K. -W. Wong, J. -Y. Delenne, K. Soga

    Hydraulic fracturing (HF) is a mulit-scale and multi-physics process which makes numerical modelling challenging. Conventional numerical models focus on multi-physics nature of HF but the multiscale n

    Jan 1, 2015

  • CIM
    Laboratory Tests on the Parameters Affecting Iron Precipitation from Non-Decopperized Nickel Anolyte

    By M. B. Greyver

    The results of laboratory tests on iron precipitation from non-decopperized nickel anolyte are discussed. The parameters (pH, oxygen consumption and stirring speed) for iron precipitation from the ano

    Jan 1, 2006

  • CIM
    Mechanical Properties of Ultra Fine Precipitation Hardened Hot Rolled High Strength Steel

    By Yoshimasa Funakawa, Kazuhiro Seto, Akio Kobayashi

    A new hot rolled high strength steel consisting of ferrite matrix and nanometer¬sized precipitates was developed. The ultra fine precipitates were identified as TiMoC2, and the strengthening by the pr

    Jan 1, 2004

  • CIM
    Use of a Rotating Biological Contactor for the Removal of Nitrogenous Compounds from Gold Mill Effluent

    By A. Kapoor, L. Morin, S. Mortazavi, P. Béedard, Gould. W. D., A. Kuiper

    The degradation of thiocyanate in a simulated gold mill effluent was studied using a laboratory scale rotating biological contactor (RBC). Complete SCN- removal was obtained at temperatures of 8 and 1

    Jan 1, 2005

  • CIM
    Optimization of the building ventilation of a bath treatment plant of an aluminium smelter using CFD modelling

    By E. Dernedde

    Industrial plants located in the province of Quebec, Canada, are subjected to large variations of the ambient air temperature, Building ventilation systems of these plants must have some flexibility i

    Jan 1, 2005

  • CIM
    Trends in Surface Drilling and Blasting

    By A. Bauer

    This paper describes the trends in recent years in explosives formulated to produce larger blast-hole spacings and over-all lower drilling and blasting costs in hard formations. A consideration of cur

    Jan 1, 1968

  • CIM
    The Benson Lake Mine - Operating Practice

    By J. D. Wilkins

    "Ore outcrops were first discovered in the area in 1911. Following various periods of exploration by private interests and Cominco Limited, the Coast Copper Company, Limited property was brought into

    Jan 1, 1971

  • CIM
    The Eldorado Operation at Great Bear Lake

    By The Staff

    Development of the Eldorado Mine THE pitchblende-silver deposits of Great Bear lake, Northwest Territories, were discovered by Gilbert LaBine in 1930. The property owned by Eldorado Gold Mines, Limi

    Jan 1, 1938

  • CIM
    Cape Breton Development Corporation - Victoria Junction coal preparation plant

    By J. G. Martin, J. C. Campbell

    THE VICTORIA JUNCTION 31,4-million-ton coal preparation complex went into operation in October 1976."' It is designed to produce a metallurgical coking coal by lowering the sulphur and ash content of

    Jan 1, 1985

  • CIM
    Characterisation of Sulphide Oxidation in a Passive Acid Rock Drainage (ARD) Treatment System

    By R. P. van Hille, N. Mooruth

    Remediation of acid rock drainage (ARD) was performed within a linear flow channel reactor (LFCR) via a floating sulphur biofilm (FSB). A full sulphur species material balance was conducted in order t

    Jan 1, 2011

  • CIM
    Lubrication and Lubrication Methods

    By F. L. Thompson

    MAN has been using lubricants of one type or another for at least four thousand years, and probably for a much longer period. We have learned from the inner wall of the tomb of Tehuti-Hetep, on which

    Jan 1, 1940

  • CIM
    Integration of Uncertain Real-Time Logistics Data for Reactive Scheduling Using Fuzzy Set Theory

    By K. Szczesny

    This paper considers the integration of uncertain real-time logistics data for reactive construction scheduling. In order to manage a construction project efficiently, an accurate schedule representin

    Aug 1, 2013

  • CIM
    Teck’s Kivcettm Lead Tapping Experience

    By G. J. McTeer, D. L. Verhelst, D. J. Rioux

    Teck Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. Since 1997, KIVCETTM flash smelting technology has been utilized for the treatment of zinc plant residues

    Jan 1, 2015

  • CIM
    Risk Discounting: The Fundamental Difference between the Real Option and Discounted Cash Flow Project Valuation Methods

    By Michael Samis

    The real option valuation method is often presented as an alternative to the conventional discounted cash flow (DCF) approach because it is able to recognize additional project value due to the presen

    May 1, 2003

  • CIM
    The Square-Set Method of Stoping at Butte

    By J. B. Mawdsley

    From the view point of the mining engineer, the square-set method of stoping as practised at Butte, Montana, is one ?of the outstanding features of well conducted mining operations in that camp. The f

    Jan 1, 1925