Preventive Maintenance Inspection in Coal MinesBy P. E. Cavanagh
FOR THE PAST seven years Mr. W. Simpson, Chief Mechanical Inspector for the Nova Scotia Department of Mines, has carried out exhaustive field trials of non-destructive inspection equipment in the coal
Jan 1, 1956
-
Commuting To Work At The Mattabi MineBy J. C. White
"During the early development of the Mattabi Mine in 1970, discussions with the Ontario Government revealed their policy of prohibiting, as much as possible, the development of new, isolated, single-i
Jan 1, 1976
-
Leaping Forward in SAG and AG Mill Simulation using a Mechanistic Model FrameworkBy R. M. de Carvalho
Empirical and phenomenological models of SAG and AG mills have dominated the scene for the last few decades, being used nearly every time a mill is scale-up or an attempt is made to improve its perfor
Jan 1, 2012
-
Modification of Electrodes with Gold NanoparticlesBy Fabio Terzi
In this investigation some preliminary results are reported about the electrochemical oxidation of CO using goldbased encapsulated nanoparticles grafted on conducting substrate. The investigation has
Oct 1, 2003
-
Factors influencing the effectiveness of Split Set friction stabilizer boltsBy M. W. Grabinsky, P. B. Tomory, J. Carvalho, J. H. Curran
Many underground mining operations use Split Set friction stabilizer bolts for rock support. Currently, however, little has been done to quantify the effects of various rock mechanics and operational
Jan 1, 1998
-
Three Dimensional Simulation of Hydraulic Fracturing on Fault Using Lattice Element MethodBy X. Xu, J. K. -W. Wong, J. -Y. Delenne, K. Soga
Hydraulic fracturing (HF) is a mulit-scale and multi-physics process which makes numerical modelling challenging. Conventional numerical models focus on multi-physics nature of HF but the multiscale n
Jan 1, 2015
-
Laboratory Tests on the Parameters Affecting Iron Precipitation from Non-Decopperized Nickel AnolyteBy M. B. Greyver
The results of laboratory tests on iron precipitation from non-decopperized nickel anolyte are discussed. The parameters (pH, oxygen consumption and stirring speed) for iron precipitation from the ano
Jan 1, 2006
-
Mechanical Properties of Ultra Fine Precipitation Hardened Hot Rolled High Strength SteelBy Yoshimasa Funakawa, Kazuhiro Seto, Akio Kobayashi
A new hot rolled high strength steel consisting of ferrite matrix and nanometer¬sized precipitates was developed. The ultra fine precipitates were identified as TiMoC2, and the strengthening by the pr
Jan 1, 2004
-
Use of a Rotating Biological Contactor for the Removal of Nitrogenous Compounds from Gold Mill EffluentBy A. Kapoor, L. Morin, S. Mortazavi, P. Béedard, Gould. W. D., A. Kuiper
The degradation of thiocyanate in a simulated gold mill effluent was studied using a laboratory scale rotating biological contactor (RBC). Complete SCN- removal was obtained at temperatures of 8 and 1
Jan 1, 2005
-
Optimization of the building ventilation of a bath treatment plant of an aluminium smelter using CFD modellingBy E. Dernedde
Industrial plants located in the province of Quebec, Canada, are subjected to large variations of the ambient air temperature, Building ventilation systems of these plants must have some flexibility i
Jan 1, 2005
-
Trends in Surface Drilling and BlastingBy A. Bauer
This paper describes the trends in recent years in explosives formulated to produce larger blast-hole spacings and over-all lower drilling and blasting costs in hard formations. A consideration of cur
Jan 1, 1968
-
The Benson Lake Mine - Operating PracticeBy J. D. Wilkins
"Ore outcrops were first discovered in the area in 1911. Following various periods of exploration by private interests and Cominco Limited, the Coast Copper Company, Limited property was brought into
Jan 1, 1971
-
The Eldorado Operation at Great Bear LakeBy The Staff
Development of the Eldorado Mine THE pitchblende-silver deposits of Great Bear lake, Northwest Territories, were discovered by Gilbert LaBine in 1930. The property owned by Eldorado Gold Mines, Limi
Jan 1, 1938
-
Cape Breton Development Corporation - Victoria Junction coal preparation plantBy J. G. Martin, J. C. Campbell
THE VICTORIA JUNCTION 31,4-million-ton coal preparation complex went into operation in October 1976."' It is designed to produce a metallurgical coking coal by lowering the sulphur and ash content of
Jan 1, 1985
-
Characterisation of Sulphide Oxidation in a Passive Acid Rock Drainage (ARD) Treatment SystemBy R. P. van Hille, N. Mooruth
Remediation of acid rock drainage (ARD) was performed within a linear flow channel reactor (LFCR) via a floating sulphur biofilm (FSB). A full sulphur species material balance was conducted in order t
Jan 1, 2011
-
Lubrication and Lubrication MethodsBy F. L. Thompson
MAN has been using lubricants of one type or another for at least four thousand years, and probably for a much longer period. We have learned from the inner wall of the tomb of Tehuti-Hetep, on which
Jan 1, 1940
-
Integration of Uncertain Real-Time Logistics Data for Reactive Scheduling Using Fuzzy Set TheoryBy K. Szczesny
This paper considers the integration of uncertain real-time logistics data for reactive construction scheduling. In order to manage a construction project efficiently, an accurate schedule representin
Aug 1, 2013
-
Teck’s Kivcettm Lead Tapping ExperienceBy G. J. McTeer, D. L. Verhelst, D. J. Rioux
Teck Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. Since 1997, KIVCETTM flash smelting technology has been utilized for the treatment of zinc plant residues
Jan 1, 2015
-
Risk Discounting: The Fundamental Difference between the Real Option and Discounted Cash Flow Project Valuation MethodsBy Michael Samis
The real option valuation method is often presented as an alternative to the conventional discounted cash flow (DCF) approach because it is able to recognize additional project value due to the presen
May 1, 2003
-
The Square-Set Method of Stoping at ButteBy J. B. Mawdsley
From the view point of the mining engineer, the square-set method of stoping as practised at Butte, Montana, is one ?of the outstanding features of well conducted mining operations in that camp. The f
Jan 1, 1925