Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New Fans

    Full aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an

    Jan 1, 1967

  • AUSIMM
    Plate Based Numerical Model for Mine Workings Design in Polish Copper Mine Conditions

    By W Pytel

    A special model of vertically loaded pillar behaviour is introduced to the general, multi-plate based, floor-pillar-roof system interaction analogue. This permitted analysing room-and-pillar mine syst

    Jan 1, 2003

  • AUSIMM
    Quality Control at Mt. Newman

    Mt. Whaleback, the property of the Mt. Newman Joint Venturers, contains more than one thousand million long tons of high grade hema- tite averaging 64% Fe, ranging from 70%, the grade of absolutely

    Jan 1, 1973

  • AUSIMM
    Modification to Flotation Cells at the Zinc Corporation Limited

    The paper gives details of the reasons why attention was directed towards the modification of flotation cells. The cell volume and impeller speeds were reduced, and it is estimated that the power cons

    Jan 1, 1956

  • AUSIMM
    Aboriginal Land Rights and the Mining Industry in the Northern Territory

    The impact of moves to introduce Abori- ginal land rights was felt in the Northern Territory as early as 1972 when the Federal Government froze the processing of all appli- cations for mining intere

    Jan 1, 1984

  • AUSIMM
    The Development of Occupational Health and Safety Policy and Practices

    Comprehensive occupational health and safety legislation in Australia is comparatively recent. It follows the examples set in U.S.A. and U.K. a decade or more ago. In Western Australia the Occupat

    Jan 1, 1986

  • AUSIMM
    Extensions to MelbourneÆs Telecom Cable Tunnel Network

    By Gunn S. G, Wilson E. G

    Studies by Telecom showed that the existing cable tunnel system in the Melbourne C.B.D. required expansion in order to meet the future telecommunications needs of the City. Due to physical locations

    Jan 1, 1981

  • AUSIMM
    The Chemistry of Cyanidation 1. Protective Alkali

    During the course of an investigation into the fundamental chemistry of the cyanide process, it became evident that the usual method of determining protective alkalinity was not completely satisfactor

    Jan 1, 1948

  • AUSIMM
    Kinetics of Flotation of Copper Tailing from Benambra Mines, Victoria

    By Boontanjai C, Boyapati ER

    Reagents used for batch flotation tests were Aeroxanthate-343 & 350, Dow Z-6, & reagent-4037 (from Benambra) as copper collectors; Na2SiO3 & Na2S2O3as gangue depressants; lime & HCl as pH regulators;

    Jan 1, 1990

  • AUSIMM
    Mine Dewatering

    Mine Dewatering for reoccupation of a flooded mine requires rehabilitation and recommissioning of shaft and sane level functions to provide safe efficient access, services and logistics, as well as

    Jan 1, 1988

  • AUSIMM
    Combination of Porosity Tools Aids Formation Evaluation

    By Misk A

    Several logging methods are presently available to the oil industry for the evaluation of formation porosity: the Sonic and Neutron logs are already widely used, the Gamma-Ganmia log is being progress

    Jan 1, 1962

  • AUSIMM
    A New Approach to Planning New Coal-Fired Power Stations in Developing Countries

    By Walsh V

    The Australian economy has been adversely affected by the hesitation in developing countries to commit to the construction of .new coal-fired power stations. World coal trade which was expected to

    Jan 1, 1987

  • AUSIMM
    Chemical Compositions of Manganese Nodules - In Situ Microenergy Dispersive X-Ray Fluorescence (m-EDXRF) and Bulk Data

    By F Melcher, M Wiedicke, A Wittenberg

    Ferromanganese nodules form a specific category of widespread marine mineral deposits. The tremendous increase in metal prices during the last decade raised new economic interest in their exploration.

    Jan 1, 2008

  • AUSIMM
    Field-Scale Assessment of Bioremediation Strategies for Two Pit Lakes Using Limnocorrals

    By R Pie, J Crusius, P Whittle, J J. McNee

    The Main Zone and Waterline pit lakes at the Equity Silver Mine near Houston, BC (Canada) are the sites of an ongoing three-year government- and industry-funded research program. In order to assess th

    Jan 1, 2003

  • AUSIMM
    The Pilbara Iron Ore Industry ùThe State of Play and Challenges Ahead

    I would like to start by thanking The AusIMM and CSIRO for organising this excellent conference and inviting me to give a keynote address. Today I will focus on some broad observations of our industry

    Jan 1, 2002

  • AUSIMM
    Style of Veins in Penjom Gold Mine, Malaysia – Implications for Gold Mineralisation and Structural Episodes

    By Z Endut, T F. Ng, G H. Teh, J H Abdul Aziz

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Gold mineralisation at the Penjom gold deposit in the Central Belt of Peninsular Malaysia i

    Mar 18, 2015

  • AUSIMM
    CIL Gold Leaching and Adsorption with a Deficiency in Free Cyanide

    By Derham DW, Newcombe LA

    The operations of the Mount Morgan gold tailings retreatment plant were significantly improved in 1984 by the desliming of the CIP plant feed, which reduced cyanide consumption and increased percen

    Jan 1, 1993

  • AUSIMM
    Noon-Recovery Coke Ovens

    HISTORY OF PROCESS DEVELOPMENT The manufacture of coke from coal commenced at the beginning of the 17th century by heaping coal into circular mounds in the open, covering with earth, clay or ash and

    Jan 1, 1975

  • AUSIMM
    Designing the Optimal Flotation Circuit - The Prominent Hill Case

    By P J. Colbert, P D. Munro

    OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl

    Jan 1, 2009

  • AUSIMM
    Numerical Simulation of the Drainage in a Mining Stope Filled with Hydraulic Backfill

    By S Servant

    In the mine of this study, cemented hydraulic backfill is placed under the form of a slurry at a percentage of solid by weight varying from 50 to 65 per cent. This slurry settles and cures in the stop

    Jan 1, 1998