Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Practical Conditional Simulation for Geologists and Mining EngineersBy Coombes J, Richards W. L
The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi
Jan 1, 1998
-
Dolomite in the Steel IndustryBy Mann T
The use of dolomite as a refractory began in England about 1870 when the basic Bessemer process for the removal of phosphorus from steel was developed by Thomas and Gilchrist.Knowledge of dolomite as
Jan 1, 1951
-
Optical Blast Fragmentation AssessmentBy Lyman G. J, Ka
The use of images to determine blast fragmentation is the only feasible technique when one does not want to disturb the production cycle. However, three major problems exist with the use of images.
Jan 1, 1990
-
Use of Bacterial Oxidation of Refractory Ores and Concentrates to Improve Precious and Base Metal RecoveryBy Spencer P. A
Bacterial oxidation, previously known as bacterial leaching or bio-leaching, has been applied at laboratory and pilot plant scale to many refractory ores and concentrates around the world. The most
Jan 1, 1991
-
Boundary Classification for Automated Geological ModellingBy P Hatherly, A Melkumyan, D Wyman
Chemical species distributions in rock sequences can be modelled using Gaussian processes (GPs) to predict the weight percentage between known data points. This method can be improved by dividing the
Sep 26, 2011
-
The Control of Hydro Power Distribution System in Deep MinesBy Wymer DG
The concept of hydro power in deep mines is based on the exploitation of the hydrostatic head that can be gained as refrigerated cooling water descends in shaft pipe columns from the surface, to provi
Jan 1, 1985
-
Pilot Scale Carbonization of Wallarah Coal using the Parry ProcessA pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development
Jan 1, 1963
-
Prediction of Size Distributions from Compressing Crusher MachinesDuring the last few years the quality requirements on roads and railroads have become more accentuated due to the desire to minimise maintenance costs. This has, in turn, led to increasing requireme
Jan 1, 1995
-
Computer Simulation to Aid Open Cut Plant SelectionThe paper describes a computer model developed within the State Electricity Commis- sion of Victoria for use in open cut planning. The purpose of the model is to simulate all the typical occurrence
Jan 1, 1982
-
The Broken Hill Lode û Its Geological StructurePerhaps no aspect of the investigation of an ore-deposit is of greater importance to the mining geologist and engineer than a consideration of its geological structure. A thorough understanding of the
Jan 1, 1932
-
Retreatment/Flotation Rationalisation at RenisonRevised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap
Jan 1, 1991
-
Structural Geology of the Muja Open Cut and its Impact on Highwall StabilityDiscontinuities often have a very detrimental effect on the stability of mine highwall faces. The west wall of the Muja open cut is remarkable for the number and variety of discontinuity sets which oc
Jan 1, 1993
-
Current Approaches for the Process Mineralogy of Platinum-Group Element Ores and TailingsBy V N. Rudashevsky, N S. Rudashevsky
Characterisation of platinum-group element (PGE) deposits and their process products has many challenges for the process or applied mineralogist. It is now well established that the PGE distribution f
Jan 1, 2008
-
Applied Designs of Rubber Mill Liners for Different Conditions and Maximum EfficiencyThere is a difference in design aspects between steel linings and rubber linings for grinding mills. The basic design rules for rub- ber are described as well as the liner designs for different appli
Jan 1, 1978
-
The Impact and Control of Organic Compounds in the Extraction of Alumina from BauxiteAustralia is the Western world's largest producer of alumina, supplying one third of total needs. Western Australia's South-West has the greatest concentration of alumina production in th
Jan 1, 1991
-
Paper No. 198. Mount Morgan Practice in Recording And Estimating Ore Tonnages And Values.By Thomas G. A
THE irregularity of the Mount Morgan (Queensland) ore body presents problems other than those only of mining. For irregularity of outline is coupled with irregularity of grade, and the ore varies so r
Jan 1, 1911
-
Overview of a New Mine Development at Gordonstone - An Interdisciplinary ApproachBy Quemard D, Troncoso J
The Gordonstone Project with a capital cost in excess of $500 million will become the largest underground coal mine in Australia. The project development decision was taken on 31 July, 1990 and at
Jan 1, 1991
-
Developments in Coal Mine Tailings Disposal and RehabilitationThe conventional approach to the disposal of fine coal mine tailings, which involves piping the tailings as an aqueous slurry to a storage where they remain in the form of a permanent wet deposit,
Jan 1, 1991
-
Notes on the Geology of Mount Morgan, QueenslandBy Campbell Brown G F
THE Mount Morgan mine has, from the time of its historical discovery, been the subject of investigation and speculation by geologists and mining engineers. The first examination was made by Dr. R. L.
Jan 1, 1911
-
Good Data-A Requirement For A Good ReserveQuite often the reserve assessor becomes enamored with the numbers gen- erated and forgets the basis for his assessment. The quality of the assess- ment can only be as good as the quality of the in
Jan 1, 1979