Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Solid Foundation of a Career

    The following paper outlines the types of employment immediately available to graduates following their university degree, a discussion on mine manager requirements, mentions career advancement and ti

    Jan 1, 2006

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Mine Road Design and Management in Autonomous Hauling Operations – A Research Roadmap

    By R J. Thompson

    In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product

    Nov 22, 2011

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • AUSIMM
    Rapid Logging of Different Magnetic Phases in Banded Ironstones Using a Travelling Three-component Vector Magnetometer

    By C A. Foss, K Leslie, C Arnold

    Magnetic susceptibility measurements provide rapid, non-destructive testing of drill core, but cannot directly map magnetite and/or hematite content. Combined magnetic susceptibility and magnetisation

    Jul 13, 2015

  • AUSIMM
    KEYNOTE: Using Metallurgical Data to Drive Continuous Improvement

    By R Dunne

    "Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi

    Oct 10, 2016

  • AUSIMM
    Coal Seam Gas in New Zealand - Perspective from New Zealand's Most Active CSG Explorers

    By S Hayton

    While coal seam gas is considered to be an unconventional gas, the proliferation of areas under exploration and development mean that it is rapidly becoming main stream. The potential of New Zealand&a

    Jan 1, 2003

  • AUSIMM
    Orebodies of the Coeur d'Alene District, Idaho: Stratigraphic Controls and Alteration Halos

    By A D. Strand

    The Coeur dÆAlene mining district in northern Idaho, USA is the second largest producer of silver in the world. The Proterozoic Revett Formation hosts most of the mesothermal Ag-Pb-Zn vein ore in the

    Jan 1, 2002

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • AUSIMM
    Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South Africa

    By M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau

    Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec

    Nov 5, 2014

  • AUSIMM
    Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre Reinforcement

    By R Winterberg

    Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special

    Mar 8, 2011

  • AUSIMM
    Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit Mine

    By N Johansson, D Johansson, A Beyglou, H Schunnesson

    As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto

    Aug 24, 2015

  • AUSIMM
    Long-term Monitoring and Targeted Assessments to Improve Management of Mine Wastes – the Batu Hijau Project

    By S L. Simpson, J Waworuntu, B M. Angel

    "The Batu Hijau copper/gold mine, operated by PT Newmont Nusa Tenggara, is located in the south-western part of Sumbawa Island, Indonesia, and is situated ~10 km from the south coast at an altitude of

    Jun 28, 2016

  • AUSIMM
    Vaporization During the Combustion of a Complex Copper Concentrate

    A laminar-flow furnace technique was used to study the combustion of 37-53 µm size fraction of Woodlawn copper concentrate containing 7.4 per cent zinc, 5.0 per cent lead and 22.5 per cent copper

    Jan 1, 1985

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Adsorption and Desorption Technique in Predicting Outburst of Gas and Coal (Coal Mines Symposium September. 1980)

    The paper describes the studies conducted to date on the short term adsorption/desorption of gases in coal from the point of view of developing techniques to predict imminent outbursting condition

    Jan 1, 1980

  • AUSIMM
    The Mining Geology and Grade Control Practices of the Batman Deposit, Mt Todd Project

    Mt Todd lies towards the south end of the Pine Creek Geosyncline, sandwiched between the Cullen Batholith and the Edith Falls Basin, in an area of regionally metamorphosed sandstones, siltstones and

    Jan 1, 1994