Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New tools for ground control in freeze shaft sinking

    By J Franz, S Bock, N Hentrich

    Artificial ground freezing is the unrivalled method for groundwater control during mine shaft sinking. Moreover, ground freezing may also provide temporary ground support. The fast development of fibr

    Nov 30, 2018

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Conducting comprehensive evaluations of preconcentration options

    By P Holtham, K Duffy, B, W Valery, E Tabosa, rade

    Pre-concentration has potential to significantly improve Mineral Resource efficiency by removing gangue early in the process, before energy intensive and expensive comminution and fine processing. How

    Nov 10, 2020

  • AUSIMM
    Practicalities of the use of fayalite slags for recovery of metals from urban wastes

    By E Jak, J Chen, B Hogg, S Nikolic, S Nicol

    The quantity of post-consumer ‘waste’ materials generated each year is rapidly increasing. These materials can contain significant quantities of critical metals and present an environmental challenge

    Jun 19, 2024

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    Comparison of Experiment and Simulation of Blast Loading on the Steel Beam

    By A Hosseinzadeh Barforoosh, A Abedi, M Taji

    The effect of blast loads on beams is one of the main issues in the analysis of steel structure. In this study, experimental tests on steel beam under blast loading, and also numerical simulation by t

    Aug 24, 2015

  • AUSIMM
    Wallaby - The Horizontally Challenged Opportunity

    Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme

    Jan 1, 2008

  • AUSIMM
    Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion

    By H Bateman, I Cawrse, G Carnes, S Cawrse

    In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro

    Jan 1, 2009

  • AUSIMM
    Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave

    By P Nichols, C te Kloot, A Harrison

    Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/

    Nov 21, 2018

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    A Simplified Creep Analysis for Low Strength Seams in Rock Pillars

    By M Habte

    This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a

    Mar 8, 2011

  • AUSIMM
    Recovery of Iron Ore Fines and Ultrafines from Tailings by Using Wet High-intensity Magnetic Separation – JONES WHIMS

    By M Gerards, M Steinberg, T Graham

    The quality and quantity of Australia’s secondary deposits, which include tailings streams and tailings dams, are higher than most countries’ primary deposits. In addition, these secondary deposits ha

    Jul 13, 2015

  • AUSIMM
    Legacy tailings dam closure with a bituminous geomembrane cover

    By M Medina, J Alexander, R J. Longey

    Capricorn Copper Pty Ltd (CCPL) are operating the Capricorn Copper Mine located at Gunpowder, Queensland. As current holder of the environmental authority for the site, CCPL have obligations to rehabi

    Jul 1, 2021

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Cost-Efficient Implementation of a Greenhouse Gas Reduction Roadmap in the Mining and Metallurgy Industry

    By M Russ, J Gediga

    This paper shows an economic feasible approach to implement greenhouse gas (GHG) reduction measures into the mining and metallurgy industry (MMI). The goal to improve energy consumption is directly li

    Jan 1, 2009

  • AUSIMM
    Investing in new process improvement technology: reducing the risk of implementation – a way forward

    By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig

    Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change

    Aug 29, 2018

  • AUSIMM
    Managing Community Relationships and Corporate Reputation - A Stakeholder Perspective

    By S McEachern, J Lowe

    An important issue currently facing the mining industry in Australia is the management and cost to the industry and other stakeholders of entry into and exit from towns and their communities. These co

    Jan 1, 2006

  • AUSIMM
    Recovery-by-size Kinetic Analysis to Determine Where Metallurgical Improvements Occur When Converting to High-chrome Grinding Media

    By C J. Greet, S Jacques

    In most instances, the application of high-chrome grinding media results in an increase in the recovery of the valuable mineral(s). The authors have published data from a number of plant-based case st

    Sep 1, 2014

  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Mine Planning for Coal Project Development

    By Westcott PC

    The development of a coal project must pass through a number of phases, taking it from a preliminary evaluation through to detailed mine planning. For each phase the cost of data acquisition and a

    Jan 1, 1983