  • AUSIMM
    "Developing Robust Hydrometallurgical Processes to Recover Metals from Deposits with Large Geometallurgical Variation"

    By B C Tanda, E A. Oraby, J J. Eksteen

    "Base metal and precious metal deposits are well known for their significant geometallurgical variation throughout the volume of the proven resource. At the metallurgical level, the plant normally pro

    Jun 15, 2016

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    Interaction Mechanism of a New Chelating Collector and Copper Sulphide Minerals

    By Falbo A, Quarestima S, Cozza C, Barbaro M

    A new synthetic reagent of the mercaptobenzoxazole class, 5- methyl-2-mercaptobenzoxazole, has been studied. This reagent exhibits powerful selective collecting action towards copper sulphides presen

    Jan 1, 1993

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Improvement in Iron Ore Agglomeration Through Design Modification in Coke Crushing Plants

    By B K. Da, S A. Balaji, G P. Roy, T K. Dutta

    The raw material handling complex at the Durgapur steel plant provides iron ore, crushed coke and flux to two sinter plants. Either some facilities were not envisaged or not properly designed before t

    Jan 1, 2005

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    Instability analysis in three-way and four-way coal mine intersections

    By B Abbasi

    It is well known that most roof falls in coal mines typically occur at and around intersections. Room-and-pillar and longwall coal mining systems typically develop 3-way and 4-way intersections. This

    Nov 30, 2018

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Minimum Industry Gold Room Security

    Gold rooms represent a high security area and preventing theft is a challenging task. Where gravity concentrates or high value unit intermediate products are present, particular and specific security

    Aug 1, 2010

  • AUSIMM
    Orepass Loss Mitigation Approach in Malmberget Mine

    By A Salama, J Greberg, B Skawina

    In today’s underground mass mining, the orepass is an important part of the infrastructure as it connects two or more mine levels and is used for conveying or storing large amounts of material. One of

    May 9, 2016

  • AUSIMM
    Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface Mines

    By J Joy, A Bye, G V. Kizil

    This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s

    Sep 18, 2012

  • AUSIMM
    Goafstream Sampling and the Barometer

    By M Brady

    "It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h

    Jun 1, 2012

  • AUSIMM
    Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case Study

    An enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over

    Aug 1, 2010

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis

    Jan 1, 2009

  • AUSIMM
    Spatial distribution of major, minor and trace elements in iron ores, using micro-XRF technology

    By N J. Potter, N W. Brand, J M. F Clout

    The increasing demand for iron ore with low concentrations of trace elements, puts increasing pressure on iron ore producers for high-quality material. Understanding the mineralogy, petrography, chemi

    Nov 8, 2021

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    IsaMills™ at Kalgoorlie Consolidated Gold Mines – from the M3000 to the M10 000 and Replacement of the Roasters at Gidji Processing Plant

    By G S. Anderson, N W. McDonald

    "The IsaMill™ was originally developed to address liberation issues at Mount Isa Mines (now Glencore) operations, McArthur River and Mount Isa in the early 1990s. Following on from the industria

    Oct 10, 2016

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014