Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The effect of vane shear rotation speed on the estimation of tailings undrained strength

    By B Wentzinger, Y Keulemans

    This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va

    Jul 1, 2021

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006

  • AUSIMM
    PC-BC: A Block Cave Design and Draw Control System

    This paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the

    Jan 1, 2000

  • AUSIMM
    A Description of the Treatment of the Copper Impurity in the Lead Ores Smelted at the Sulphide Corporation's Works, Cockle Creek

    THE question of dealing with the small quantities of copper found in a great many of the purchased ores became a factor of importance when the Sulphide Corporation decided to refine its own lead bulli

    Jan 1, 1920

  • AUSIMM
    Rare Earth Elements (REE) in Banded Iron Formations û Link Between Geochemistry and Mineralogy

    By N J. Beukes, J Gutzmer, C Reinke, M Bau

    In this study the light sparse phase search (SPL_Lt) mode on the Mineral Liberation Analyser (MLA) was successfully used to identify and quantify the abundance of rare earth element (REE) phosphates i

    Jan 1, 2008

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years on

    By J Missen, P Currie, J Bohan, D Clark

    AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates

    Jun 22, 2016

  • AUSIMM
    A short review – hydrogen reduction of copper-containing resources

    By M I. Pownceby, M A. Rhamdhani, D M. Fellicia, S Palanisamy, R Z. Mukhlis

    The trend of global copper production has prospectively increased over time. Based on typical mined ore grades, 1 t of copper ore generates approximately 6–10 kg of copper, which requires much energy,

    Jun 19, 2024

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    Challenges and limitations in development of large thermodynamic databases for multiple molten phases using the Modified Quasichemical Formalism

    By E Jak, M Shevchenko, E Nekhoroshev, D Shishin

    In the field of pyrometallurgy, the presence of multiple molten phases with distinct chemical compositions, such as slags, mattes, speiss liquids, metals and molten salts, is a well-known phenomenon.

    Aug 21, 2024

  • AUSIMM
    Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mud

    By L Bergin, D J. Williams, S Islam, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Mount Carlton comminution circuit design, start-up and optimisation

    By B Putland, I Lovatt, D Schwann, A Cervillin

    The Mount Carlton project in Queensland's North East sits on a high-sulphidation epithermal style deposit rich in gold, copper and silver. Mt Carlton is an open pit mining operation with ore proce

    Aug 29, 2018

  • AUSIMM
    Morphological Characterisation of Spongillites from South-Eastern Brazil

    By A F. D C Varajpo, R C. Weba, C Volkmer-Ribeiro, C A. C Varajpo, N S. Gomes

    This study relates to the spongillite deposits from the region of Jopo Pinheiro, in the north-west of the State of Minas Gerais, south-eastern Brazil. The deposits occur in shallow ponds (with a maxim

    Jan 1, 2008

  • AUSIMM
    The Geology of the Browns Creek Gold-Copper Skarn Deposit, Blayney, NSW

    By Wilkins C

    The Browns Creek deposit is located 8 kin west of Blayney and 220 km west of Sydney (Figure 1), at lat 33¦32'S, long 149¦10'E on the Bathurst (SI 55-8) 1:250 000 scale map sheet. The total

    Jan 1, 1997

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Making Hard Rock In Situ Recovery a Reality

    By P Breuer, D J. Robinson, A McFarlane, L L. Kuhar

    Increasing global demand for commodity metals and capital and the greater operating costs of mining and metal production present significant challenges for the metals mining industry. Current conventi

    Nov 4, 2015

  • AUSIMM
    A Case Study In Ore Reserve Procedures At Mount Lyell

    By Rowe J

    The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est

    Jan 1, 1979

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007