Search Documents

  • CIM
    Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite Flotation

    By R. Jackman, D. Koningen, G. Wilcox

    "Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm

    Jan 1, 2012

  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • TMS
    Process Control Studies in Extractive Metallurgy

    By Albaharna O. T., Argyropoulos S. A.

    "This paper describes the development and the implementation of process control in a variety of instruments used in metallurgical laboratories. These instruments are used for different research projec

    Jan 1, 1989

  • CIM
    Diagnosis of the Operation of a Hydraulic Classifier for Iron Ore Concentrate

    By C. Gosselin, G. M. Payenzo, C. Bazin, M. Desnoyers, G. Chevalier

    "ArcelorMittal Mines Canada operates hydraulic classifiers to reduce the silica content of an iron oxide concentrate from 4.5% to less than 1.2% SiO2. Sampling campaigns were conducted to develop a pr

    Jan 1, 2012

  • SME
    Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station

    By Klaus Rieker

    The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil

    Jan 1, 2008

  • AUSIMM
    Industrial Hygiene and Safety at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    The usual metallurgical, engineering and administrative activities associated with the handling and smelting of ores, and the subsequent handling and treatment of the products of smelting, present als

    Jan 1, 1937

  • AUSIMM
    Presidential Address, 1969 The Australian Coal Industry - Present Status and Position in the National Economy

    My selection of the Australian coal industry as the theme of this Presidential Address arose from the fact that it is one of our most important mineral industries. The industry is presently prospering

    Jan 1, 1969

  • SME
    Mechanized Rock Excavation In Mining

    By George H. K. Schenck

    In this decade of the 1.970's it is forecast that eight billion cubic yards of rock will be excavated from 400, 000 miles of new tunnels, drifts and other underground workings in the western worl

    Jan 1, 1974

  • IIMP
    Prueba de heterogeneidad y optimización de protocolos de muestreo para el mineral de Cerro Verde

    By Luis Alberto Medina

    La característica principal de la composición de un cuerpo mineralizado es la heterogeneidad, dado que sus elementos no son iguales. En ese sentido, la prueba de heterogeneidad en el mineral de Cerro

    Sep 13, 2001

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • ISEE
    New Dimensions in Initiation Systems

    By Curtis G. Kremer

    "New explosives initiation systems continue to be developed as new technologies make advancements possible. Due to recent initiator developments, explosives users now have the most reliable, accurate

    Jan 1, 1991

  • DFI
  • DFI
    Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? Preface

    By Zhou Lu-Jian

    The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T

    Jan 1, 1991

  • AUSIMM
    High Speed Development Work at Emperor Mine, Vatukoula, Fiji

    With the exhaustion of orebodies close to the main haulage shaft of the Emperor mine, an increased rate of development, aimed at earlier investigation of values disclosed by exploration drill holes ha

    Jan 1, 1966

  • NIOSH
    RI 4250 Secondary Recovery of Oil of Water-Flooding in Fields of North Texas - Supplement to R.I. 3906 History of Water-flooding of Oil Sands on North Texas

    By Robert K. Guthrie, James W. Amyx, D. B. Taliaferro

    "INTRODUCTION Secondary recovery of oil by water-flooding is practiced more extensively in North Texas than in any other section of the State, and the progress and experience of the operations in that

    Feb 1, 1948

  • ISEE
    Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion Drilling

    By Gary Cavanough, Stuart Addinell, Hector Parra

    Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an

    Jan 1, 2013

  • CIM
    On-Line Flotation Simulator at Pyhäsalmi Mine

    By K. Zenger, J. Kaartinen, J. Huuskonen, S. Torttila, S. Lähteenmäki, J. Pietilä

    "Pyhäsalmi Mine in Finland has a long history of continuous process development. The concentrator processes Cu-Zn-sulphide ore with high recoveries. An on-line flotation simulator has been developed t

    Jan 1, 2015

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • DFI
    New Possibilities for Quality Assurance of Diaphragm Wall Joints

    By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider

    "Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc

    Jan 1, 2014