Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Stirred Milling Technology - A New Concept in Fine GrindingBy A Paz, H Lehto, M +stholm, I Roitto
Nowadays, the demand for a finer grind in minerals processing has set new challenges within the industry, particularly for grinding technology. Apart from a finer grind, energy efficiency is also a ke
Jul 15, 2013
-
Skirt Suction Foundation - Application To Strait Crossings -By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.By Alexander J. Verstraeten
The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev
Jan 1, 1987
-
An analysis of the practical and economic implications of systematic underground drilling in deep South African gold minesBy D. G. Krige
Using chip sample data and spatial structure parameters from a large mined-out section of a South African gold mine the advantages to be gained from a regular underground borehole drilling programme h
Jan 1, 2003
-
In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?By L. Vollert
In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme
Jan 1, 2019
-
Real-Time Data Reconciliation for Process ControlBy Éric Poulin, Simon Gariépy, Mario Paredes Malca
"While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread
Jan 1, 2006
-
Sampling and Assaying of Coarse Gold at La Herradura – Minera Penmont S. de R.L. de C.V., Mexico (50ed6113-280f-4c5e-b31d-b2173f6016d8)By Pablo González, Rodolfo Espinosa, Jose-Luis Noyola, Sergio Cossio
"Minera Penmont, at La Herradura, is a joint venture between Industrias Peñoles, S.A. de C.V., and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura
Jan 1, 2003
-
Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.By Seal. Thom
Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest
Jan 1, 2008
-
Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, ItalyBy Roberto Folchi
This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel
Jan 1, 1994
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Instrumented Driven Steel Tube Piles At Canary Wharf, LondonBy A. R. Gaba
Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are
Jan 1, 1989
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field WorkBy Darrell L. Beddard
Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai
Jan 1, 1996
-
RI 8277 Dehydrating Magnesium Chloride by Double-Salt DecompositionBy Joan T. May
Federal Bureau of Mines studies showed that some organic amine hydrochlorides can be used as dehydrating agents for producing anhydrous magnesium chloride from hydrates and brines. Laboratory-scale te
Jan 1, 1978
-
Recycling Power Plant Fly Ash And Its New Application For Construction Materials - Preprint 09-037By N. S. Kim
Economically favored Cr and Cu leaching out process from spent power plant fly ash (PPFA) had been investigated. PPFA, bearing of C, S, V, Ni, Cu and Cr, has been widely used as an assistant fuel in c
Jan 1, 2009
-
Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control SoftwareThe NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se
Jan 4, 2006
-
Quake, Quarry, or QuackBy Dominic Orf, Gregory Poole
On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was
-
How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive ProgramsBy A. Tylczak, C. Norman, C. Shook, S. Loif
"There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m
Jan 1, 2015
-
Enabling Mining Safety & Automation By Electronically Scanning Microwave Radar Systems On Surface Mining MachinesUsing a series-model of an automotive short range radar sensor (SRR) and a recently completed experimental radar system, field tests have been performed in a surface mine. It was examined, to what ext
Jan 1, 2007
-
Underground OrganizationIN the underground department of a mine, we may fairly say that "good management is based upon three elementals: first, sound engineering; second, proper coordination and efficiency of every huma
Jan 1, 1912
-
Pre-sink shaft safety analysis using wireline geophysicsBy N. Andersen
During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic
Jan 1, 2015