Search Documents

  • NIOSH
    RI 9582 - In Situ Stress At The Lucky Friday Mine - (In Four Parts): 4. Characterization of Mine In Situ Stress Field

    By J. K. Whyatt

    Researchers at the U.S. Bureau of Mines collected and analyzed overcore measurements and other indicators of in situ stress characteristics at the Lucky Friday Mine, Mullan, ID. An analysis of these d

    Jan 1, 2010

  • AIME
    The End of the Century (8b444765-b921-401b-b94c-3816957c5e9d)

    By Thomas T., Read

    THE decades immediately before and after the end of the nineteenth century (1890-1910) were a period of increased activity in mineral industry education. One reason for ,this, undoubtedly, was the rap

    Jan 1, 1941

  • AUSIMM
    Metallugical Plant ù Have We Run Out of Developments?

    I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam

    Jan 1, 2002

  • NIOSH
    Metal Operator Mining Facts - 2005 - Mining Operations

    In 2005, a total of 263 metal mining operations reported employment to the Mine Safety and Health Administration (MSHA). Metal mines were the smallest mining commodity sector, comprising 1.8% of all

    Jan 1, 2008

  • CIM
    Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)

    By Walter Herd

    For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i

    Jan 1, 1929

  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005

  • NIOSH
    OFR-122(5)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Vol V - Appen B - General Specs - Sect 5 - Mechanical - Material Handling And Assoc Equip

    1.0 SCOPE AND REGULATIONS 1.1 This specification covers the minimum requirements for material handling and associated equipment including design and materials. 1.2 This specification requires

    Jan 1, 1979

  • NIOSH
    OFR-29-73 Shaft Drilling - State Of The Art - Part 1 - Executive Summary ? History Of Shaft Drilling

    By James H. Cobbs

    The utilization of large diameter drilled holes for mine shafts seems to have had its beginning in Europe about 1850 (28) where the mining industries of Germany and The Netherlands first used drilled

    Jan 1, 1973

  • NIOSH
    MLA 46-85 - Mineral Resources Of The Gooding City Of Rocks Study Areas, Gooding County, Idaho ? Summary

    By Phillip R. Moyle

    A mineral survey of 19,350 acres of the Gooding City of Rocks Wilderness Study Areas (WSAs) in the north-central Snake River Plain was conducted by the U.S. Bureau of Mines in 1984. No formal mining d

    Jan 1, 1985

  • AIME
    Mining, Milling, And Processing Of Perlite

    By Fred D. Gustafson

    With the postwar emergency for new housing and for new industrial buildings, much research has been done on lightweight aggregates for use in concrete and plaster. The trend toward lighter weight aggr

    Jan 1, 1949

  • CIM
    Process control and instrumentation in mineral processing plants

    By A. L. Mular

    "IntroductionThe mining industry has made slow but steady progress toward the automation of mineral processing plants over the last 35 years. The stimulus to automate is associated with important econ

    Jan 1, 1989

  • TMS
    PEM Fuel Cell Bipolar Plate - Material Selection, Design and Integration

    By Atul Kurnar

    In the present research a two-cell polymer electrolyte membrane fuel cell stack (PEMFCS) with SS-316 bipolar plates has been tested. Different flow field designs were studied and a modified multi-para

    Jan 1, 2002

  • ABM
    Carboval Como Um Vetor Para Intensificar O Conceito Da Economia Circular No Indústria Siderúrgica

    By Fernanda da Silva Machado

    Em um mundo de recursos naturais decrescentes, com a intensificação das indústrias automatizadas de todos os tipos (I4) e contínuo aumento da população, é necessário desenvolver melhores caminhos para

    Oct 30, 2017

  • NIOSH
    OFR-120-84 Development Of Foreign Economic Indices - Phase I For Philippines

    By Alice M. Chieruzzi

    This Country Documentation Report presents the development of economic indices for the Philippines for the period from 1970 through 1981. The work was done through the Bureau of Mines, Minerals Availa

    Jan 1, 1983

  • SME
    The Planning, Design and Construction of the Tuas Cable Tunnel and Future Power Transmission Cable Tunnels in Singapore

    By G. D. Mainwaring, Weng L. W, Lam Y. K.

    The first power transmission cable tunnel in Singapore was the 2.6km long undersea tunnel between Pulau Seraya and mainland Singapore, constructed in the1980s. Ten years later, similar concepts were u

    Jan 1, 2001

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • NIOSH
    RI 4838 Bituminous-Coal Deposits In The Vicinity Of Eska, Matanuska Valley Coal Field, Alaska

    By Theodore R. Jolley

    The estimated recoverable reserves in the area in the vicinity of Eska 2 mine are, 699,300 tons in the Chapin and Emery bas of the Maitland group. Those recoverable reserves are in the area between th

    Jan 1, 1952

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • SAIMM
    The use of seawater in copper hydrometallurgical processing in Chile: A review

    By V. Quezada, Á. Astudillo, L. Valásquez, M. Garcia

    Seawater has become a viable alternative for different uses in copper hydrometallurgy. In this paper we review the main physical and chemical characteristics of seawater and how these influence copper

    Jul 5, 2023

  • CIM
    Management of Environmental Emissions at Boliden Harjavalta Oy’s Smelter

    By H. -L. Heikkilä, E. Peuraniemi

    "Boliden Harjavalta Oy has a long tradition in the Finnish metal industry starting from the 1930's. The Smelter consists of copper and nickel flash smelting lines. Off-gases are captured in the acid p

    Jan 1, 2012