Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
COMPARISON OF IMESAFR DEBRIS DENSITY RESULTS TO ISO-1 and ISO-2 TEST DataBy Amos Bryant, Jesse Davis
This paper compares the predictions of the latest Institute of Makers of Explosives Safety Analysis for Risk (IMESAFR) model versus physical test data recovered from ISO-1 and ISO-2 tests in Woomera,
Jan 1, 2010
-
OFR-10(2)-79 Noise Control Modification Manual - Jeffrey 100-L Auger MinerBy Tom Retka
This three volume final report summarizes the activities and conclusions of this contract. The objective of the contract was to develop noise control modifications on a retrofit basis, for auger miner
Jan 1, 1978
-
Thermal Fragmentation as a Possible, Viable, Alternative Mining Method in Narrow Vein Mining? Mining, Metallurgy and ExplorationBy Larissa Koroznikova, Steve Durkin, Patrick Bouwmeester, Michael Tuck
In currently used mining methods, blasting techniques often causes dilution of valuable ore and results in costly processing requirements. In the context of narrow vein mining of thin and highly conce
-
A Review of the Geology of Gold in Nova ScotiaBy Milton C. Graves, Marcos Zentilli
"Gold has been reported from most geological environments in Nova Scotia; however, virtually all production (circa 2,000, 000 troy ounces; circa 60 tonnes) has come from that part of the province to t
Jan 1, 1982
-
Lake Mead intake No. 3: TBM tunneling at high pressureBy Erika Moonin, Jim Nickerson, Claudio Cimiotti, Roberto Bono
"In response to the severe drought on the Colorado River basin and in order to preserve existing water capacity to the Las Vegas Valley, the Southern Nevada Water Authority contracted a new deep-water
Jan 1, 2015
-
OFR-146(7)-77 Comparative Coal Transportation Costs: An Economic And Engineering Analysis Of Truck, Belt, Rail, Barge And Coal Slurry And Pneumatic Pipelines ? Volume 7 Pneumatic Transport ? 7.1 IntroductionBy Michael Rieber
A new mode of coal transportation based on the principles of pneumatic conveying has been recently, proposed by Soo, et al. [5]. Pneumatic transport is not a novel concept and commercial experience wi
Jan 1, 1977
-
The Critical Surface Tension Of Wetting Of Sulfide MineralsBy B. Yarar
The critical surface tension of wetting (?c) of Cu2S, FeS2, PbS, and MoS2 were determined by plotting flotation recovery versus YLV which was arranged by methanol, and Extra-polating to % R = 0. ?c v
Jan 1, 1983
-
Risk Mitigation For Openpit Mining in Areas With Old Underground Workings`By J. Duran
Mining at Newmont Mining?s Phoenix?s Mine is currently done by surface operation in the Fortitude and Bonanza pits at a combined rate of approximately 100 kt/d (110,000 stpd). A portion of the o
-
A New Optimum Pit Limit Design AlgorithmBy Yixian Zhao
Although many ultimate pit limit design algorithms have been developed for the past one- quarter century, only the well known Lerchs-Grossmann's (LG) algorithm is capable of producing a truly opt
Jan 1, 1992
-
TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
Underground Facilities for the Superconducting Super ColliderBy John E. Shively, Tracy K. Lundin, Francis Fong
The Superconducting Super Collider (SSC) features two 20 TeV counter rotating proton beams which will be housed in 87 km (54 miles) of tunnel. Four additional lower energy particle accelerators will b
Jan 1, 1993
-
OFR-23(2)-76 A Technical And Economic Study Of Candidate Underground Mining Systems For Deep, Thick Oil Shale Deposits - Final Report, Phase IIBy W. N. Hoskins
This report covers the final results of a two-phase contract study conducted between July 1974 and October 1976. A comprehensive summary of the initial phase of the study is included. Phase I of t
Jan 1, 1976
-
A sustainable approach to derelict and ownerless mines in South AfricaBy S. Mudau, P. Mohasoa, M. J. Cole
Derelict and ownerless (D&O) mines in South Africa have been an ongoing concern for over a decade. While some progress has been made to rehabilitate D&O asbestos sites, significant work remains, exace
Apr 25, 2025
-
Metallurgical Efficiency in the Recovery of Alluvial GoldThe character of alluvial gold deposits presents severe difficulties, and sometimes limitations, on the extent to which metallurgical efficiency can be measured. Very little monitoring of metallurgica
Jan 1, 1984
-
Aplicación de relleno hidraúlico con mezcla de cemento en las minas de Cerro de Pasco y MorocochaBy A. León
El objetivo del presente trabajo es describir el sistema de relleno hidraúlico en los tajeos de vetas angostas de la mina de Morococha a través del método "Arch Back". Actualmente el sistema de rellen
Nov 20, 1972
-
High Quality Performance of Segmental Lined TunnelsTunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi
Jan 1, 1999
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Optimising the Management of CIP/CIL CircuitsBy K. Barbetti
"The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe
Jan 1, 2017
-
Strong Acid Leaching and Filtration of Lead/Silver ResidueBy Adams R. W
A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February
Jan 1, 1989
-
Scams and other impediments to credible mineral appraisalBy Landy Stinnett
"When performing a valuation of a mineral property, a developing mine or perhaps an ongoing operation, the appraiser is typically provided with a range of information prepared by the property owner. T
Sep 1, 2016