Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Technical Note - Thick seam mining with artificial roof laying supportBy J. B. Gwiazda
Introduction Thick seams constitute a considerable portion of Polish coal reserves. In producing mines and those under construction, the reserves where the height is more than 4.5 m (15 ft) total a
Jan 3, 1987
-
Doing It All: Cut, Crush, And Load With One Machine Wirtgen Surface MinerBy D. van der Veen
Mining companies and contractors are looking at Wirtgen Surface Miners to provide flexibility at their operations. Wirtgen Surface Miners have been used in the surface mining industry for over fifteen
Jan 1, 2002
-
Thinking Outside The Box- New Ways To Close Old Tailing BasinsBy B. Anderson, P. Churak, S. Dewar, A. Johnson, P. Eger
Although vegetation can be successfully established on fine taconite tailings, innovative approaches are needed to reclaim the coarse tailings used for dam construction. Through a series of cooperati
Jan 1, 2002
-
New Tunneling Innovations Revolve Around More Efficient Disc CuttersBy Desiree Willis
Disc cutters have determined excavation rates of rock tunneling projects for more than 50 years. First developed in 1956 by James S. Robbins, disc cutters (then 279 mm or 11 in. in diameter) were use
Jan 1, 2007
-
Construction of a Mixed Face Reach Through Granitic Rocks and ConglomerateBy John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler
The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol
Jan 1, 2007
-
Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri LankaBy Jamal Rostami, Ataollah Rahbar
"Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a
Jan 1, 2016
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Evaluation Of Mechanical Excavation Systems For Oil Shale MiningBy Robert H. Robinson, Levent Ozdemir, Russell J. Miller
The paper summarizes an investigation into the applicability of mechanical excavation to oil shale mining; identifies available machine types that are best suited to various aspects of the mining oper
Jan 1, 1983
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
The Role of Gas Hydrate in a Global Gas MarketBy M. D. Max, A. H. Johnson
INTRODUCTION Gas hydrates have considerable potential to be a major energy resource owing to their apparent abundance in Arctic regions and along continental margins throughout the world (Kvenvolden,
Jan 1, 2006
-
Big Hole Drilling -- The State Of The ArtBy M. D. Lackey
The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being
Jan 1, 1983
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
The Study Of Geotechnical Parameters For Paste Technologies: A General ReviewBy A. Bascetin
Waste materials caused by mining activities are an important environmental problem. Paste technology is a good alternative for waste management because it has many benefits in the aspects of environme
Jan 1, 2012
-
Knelson-Deswik Mill: Evaluation Of Operating Variables ? IntroductionBy D. Rahal
All ores have an economic optimum particle size (Wills and Napier-Munn, 2006). This optimum value is often a compromise between the need to achieve adequate liberation for the efficient separation and
Jan 1, 2011
-
Steel-Fiber-Reinforced Shotcrete For Tunnel Linings: The State Of The ArtBy Don Rose
INTRODUCTION A number of tunnels supported and permanently lined by steel-fiber-reinforced shotcrete (SFRS) have been built in North America in the 1980s. The material is more economical than, and
Jan 1, 1985
-
A Review Of Carcinogenicity Studies Of Asbestos And Non-Asbestos Tremolite And Other AmphibolesBy John Addison
Experimental animal studies comparing asbestos and non-asbestos varieties of tremolite indicate tremolite asbestos is markedly more carcinogenic. By direct analogy, the differences in carcinogenicity
Jan 1, 2007
-
The effect of reductive roasting on the electrostatic separation of rutile and zirconBy D. Bessinger, J. Nell
The electrical conductivity of rutile was optimised as a function of time, temperature and gas composition. These optimised conditions were used to treat rutile/zircon feed prep concentrate samples fr
Jan 1, 2005
-
Field Data Collection: Techniques And ApplicationsBy M. Maier
Geographic Information Systems (GIS) has evolved into a powerful tool for analyzing spatial and attribute data in many industries including mining. Modern field data collection techniques add another
Jan 1, 2001
-
Construction Of A TBM Launch Box In A Complex Urban EnvironmentBy Vincent Tirolo
The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F