Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Resonance Pile Driving with Zero Ground VibrationBy Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
Pile Driving Dilemma: Reducing Noise, VibrationsBy Michael D. Justason
"In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de
Jan 1, 2012
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse EmbankmentBy Karen Dawson
This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab
-
Risk Management Techniques to Avoid LitigationBy Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
Shoring Up D.C.'s Historical Foundations: Collection 14By Alan Quiroga
Nestled between Meridian Park and Howard University in the heart of Washington, D.C., the historic block between 14th, V and W streets North- west featured several original struc- tures, many of them
Aug 1, 2023
-
Instrumented Pile Load Tests In The Area Of Pearl Harbor, HawaiiBy John Y. L Chen
This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex
Jan 1, 2002
-
Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity AnalysisBy Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe
The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc
Jan 1, 2017
-
Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal MineBy Stephan Fisch, Franz-Werner Gerressen
"The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining
Jan 1, 2017
-
Novel Methods Of Restraining Embedded Retaining WallsBy Abid Adekunte
Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br
Jan 1, 2010
-
Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay SeawallBy Pierre Gouvin
"This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas
Jan 1, 2017
-
Measured And Modeled Settlements Of Power Plant On Piled Raft FoundationsBy Gianni O. Chieruzzi
A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
-
Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi
"A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
Jan 1, 2017
-
Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental ConsiderationsBy Takashi Enomoto
"The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja
Jan 1, 2015
-
Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case StudiesBy Daniel Ruffing, Charlie Krug
In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Real-Time Anchor Testing and Data ManagementBy Bora Okumusoglu, Devon K. V. Mothersille
"AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front
Jan 1, 2017
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017