Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Diggability of plains overburden with bucketwheel excavators

    By A. M. Krzanowski, T. S. Golosinski

    "This paper presents results of a study undertaken to determinethe feasibility of mining plains overburdens with bucket wheel excavators. Based on extensive geotechnical testing of overburdens under s

    Jan 1, 1987

  • CIM
    Arctic Resource Development Challenges for Environmental Approvals

    By Nick Poushinsky

    OVERVIEW OF PRESENTATION ?Stantec?s Northern Presence ?Challenges for Northern Development ?Environmental Approval Challenges ?History/Expectations ?Baseline Data ?Consultation ?Regulatory Pr

    May 1, 2009

  • CIM
    Startup of New Facilities to Planned Performance Levels

    By A. Rajan

    "Drawing upon the experiences of a gold extraction plant startup in the Southern Pacific, this paper will describe the importance of the commissioning phases to the project outcomes to achieve early t

    Jan 1, 2000

  • CIM
    Computer Control Strategy

    By R. J. McLeod

    "CONTROL STRATEGYThe Lake Dufault Division of Falconbridge Copper Limited has been concentrating a complex copper zinc ore since late 1964. An ARL X-ray on stream analyzer was installed in 1966 for pr

    Jan 1, 1973

  • CIM
    Hydraulic versus cable in 1988

    By Brian Reid

    "This paper studies the progress made by hydraulic shovel manufacturers over the last few years, particularly in the areas of productivity increase and operating cost reductions.Five years ago, it was

    Jan 1, 1988

  • CIM
    Triboelectric Belt Separator for Beneficiation of Fine Minerals (9aecc8ca-7bc0-41bc-8b15-775052b522c2)

    By James D. Bittner

    Separation Technologies, LLC (ST) has developed a processing system based on triboelectric charging and electrostatic separation that provides the mineral processing industry a means to beneficiate fi

    Nov 1, 2011

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    The Strength and Flow Performance of Glassfill Technology

    By Euler De Souza

    Backfilling in Canadian mines has been practised for close to 100 years and evidence anticipates the application of mine fill technology at an increasing rate during the foreseeable future. The evolut

    Apr 1, 2005

  • CIM
    Closing the loop—Using actual concentrator performance to determine the true value of ore sources

    "The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co

    Jan 1, 2005

  • CIM
    Use of an on-Line Analysis System in the Flin Flon Concentrator

    By H. A. Dakin

    "An introduction to the metallurgical requirements of the Flin Flon concentrator reveals the magnitude of ore blending which is required in its operation of three flotation circuits. The resulting var

    Jan 1, 1974

  • CIM
    Identification of Active Sites and Influence of Real Structure of Gold Catalysts in the Selective Hydrogenation of Acrolein to Allyl alcohol

    By Peter Claus

    In the last years, supported gold catalysts with particle sizes smaller than 10 nm have attracted a lot of attention. While gold bulk metal is rather inert in chemical reactions and, thus, is of low i

    Oct 1, 2003

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • CIM
    Improvements in Gravity and Overall Gold Recovery at NVI Mining Ltd. Myra Falls Operation

    By Linda Duncan, Trevor Yeomans, Chris Potorieko, Michael Fullam

    "NVI Mining’s Myra Falls Operation is a 4,000 mtpd copper/zinc flotation circuit with by product gold of ~28,000 ounces per year. Gold recovery has historically averaged 40-55%, however, a portion of

    Jan 1, 2006

  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002

  • CIM
    Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, Ontario

    By A. C. Wilson

    In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu

    May 1, 2003

  • CIM
    Improving mining and minerals plant performance: operations and maintenance working together using new information technology

    Operations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc

    Jan 1, 2009

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008