Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    The Sullivan Concentrator Instrumentation and Analytical Control

    By W. K. Gowans

    The Sullivan Concentrator treats a complex sulphide ore consisting mainly of galena, marmatite and pyrrhotite. The ore carried minor values in silver, antimony, bismuth, indium and tin. The products o

    Jan 1, 1975

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • CIM
    Modelling of Blast-Induced Stress Wave Propagation and Fracturing In Hard Rock Material

    By Ali Mortazavi

    In underground mining applications, successful blasting results in less damage, which may lower support costs, lower dilution and produce a uniform fragmentation. The explosive detonation process crea

    May 1, 2002

  • CIM
    Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern Saskatchewan

    By K. Duckworth

    "Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat

    Jan 1, 1988

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • CIM
    The Oxygen Demand of Flotation Pulps

    By F. Rosenblum, P. Spira

    "Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho

    Jan 1, 1974

  • CIM
    Cultivator shank manufacture and evaluation

    By R. W. Pugh, D. G. Bellow

    "This paper will describe how cultivator shanks are made in one company and how the manufacturing was studied with a view to increasing product consistency and reducing manufacturing cost. The product

    Jan 1, 1982

  • CIM
    The Alsands Project

    By C. R. Edwards, J. R. Smith

    "INTRODUCTIONThe purpose of this paper is to give an overview of the ALSANDS PROJECT, with emphasis on the approach taken in the design of the Primary Extraction and Froth Treatment Plants.The Alsands

    Jan 1, 1982

  • CIM
    An Alkaline Glycine-Based Process for Copper Recovery and Iron Rejection from Chalcopyrite

    By B. Tanda

    A process has been developed at Curtin University whereby glycine is used in an alkaline environment to leach gold, silver and copper from their ores, concentrates, process intermediates and wastes. C

    Jan 1, 2016

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • CIM
    Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)

    By W. J. Dick, K. G. Kress

    A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f

    Jan 1, 2005

  • CIM
    Fire in No. II South, No. 26 Colliery, Glace Bay

    By W. Leblanc, J. Phalen

    This paper tells the story of a serious mine fire on a mechanized longwall face in a submarine coal mine at Glace Bay, Nova Scotia. The story gives, in chronological order, a technical account of the

    Jan 1, 1976

  • CIM
    Tunnelling in Horizontally Laminated Ground

    By Matthew A. Perras

    With growing populations, infrastructure projects are utilizing underground space to expand transportation networks, water supply and sewer disposal systems and hydropower facilities. These new projec

    May 1, 2009

  • CIM
    Sea Water Flotation

    By L. D. Haig

    "The Texada Mill is a unique iron operation producing High Grade sinter iron concentrate and a by-product copper, gold, silver concentrate. The plant is complex and extremely flexible to handle the ma

    Jan 1, 1974

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987