    Computational Design of Ultra High-Strength, Corrosion Resistant, Secondary Hardened Landing Gear Steel

    By C. Kuehmann, B. Tufts

    QuesTek Innovations has applied its Materials by Design® methodology to computationally design a new ultra high-strength corrosion resistant steel. Ferriurn® S53 eliminates the need for toxic cadmium

    Jan 1, 2006

  • CIM
    Wear of High Speed Steels as Materials for Bearings in Aero-Gas Turbines

    By R. Ghomashchi

    Wear, fatigue and corrosion are the most widely encountered modes of failure in materials used in engineering applications, including aero-gas turbines. Although wear is distinctly classified as adhes

    Jan 1, 2005

  • CIM
    Measurement of CTOD Using Area of Load/Plastic CMOD For SE(T) Samples

    By G. Shen, W. R. Tyson

    In most fracture toughness test standards, such as ASTM E 1290 and BS 7448, crack-tip opening displacement (CTOD) is measured by using three-point bend (SE(B)) or compact (C(T)) samples with deep crac

    Jan 1, 2005

  • CIM
    Processing and Utilization of Mine Wastewater Sludge for Underground Disposal with Paste Backfill

    By Laxman (Lucky) Amaratunga, Hisham Madi

    Final disposal of mine wastewater neutralization sludge continues to be one of more pressing problems in the mining industry. The disposal of mining and metallurgical waste products into underground r

    Jan 1, 2004

  • CIM
    Hydraulic Air Compressors ? A Forgotten Solution for Mine Air Power And Mine Ventilation?

    By D. L. Millar

    The hydraulic air compressor (HAC) is driven only by water, held up by a dam, to create relatively low head (typically 10-20 metres), such that the developed hydropower is used to cause flow in openin

    Aug 1, 2013

  • CIM
    Development and Evaluation of a New Bubble Generating Device Based on Impinging Jetting for Column Flotation

    By P. Ramirez

    "To achieve an optimal metallurgical performance in the flotation process the bubble diameter should be between 0.5 and 2.5 mm. To control bubble size, frothers are added, reducing bubble size and con

    Jan 1, 2016

  • CIM
    A Total System Concept for the Reclamation and Hydraulic Transportation of Dense Solids

    By R. Binning

    "Economic high density mineral reclamation and subsequent transportation of solids through a pipeline presents many formidable engineering problems.Mineral reclamation system design by theoretical for

    Jan 1, 1985

  • CIM
    Bent Beam Coupon Testing for the Investigation of Stress Corrosion Cracking in Rockbolts

    "Coupon testing has been used to investigate stress corrosion cracking (SCC) of rockbolts in a laboratory based experimental program. This program has focused on the use of ASTM G39 three- and four-po

    Jan 1, 2015

  • CIM
    Relation of fluid inclusion geochemistry to wallrock alteration and Iithogeochemical zonation at the Hollinger-Mclntyre gold deposit, Timmins, Ontario, Canada

    By Ted J. Smith, Stephen E. Kesler

    "Zonation patterns are welt developed in the mafic metavolcanic rocks that host epigenetic quartz-carbonate-gold vein mineralization at the Hollinger-McIntyre deposit. Carbonate alteration assemblages

    Jan 1, 1985

  • CIM
    Process mineralogy of select refractory Carlin-type gold ores

    By D. M. Hausen

    "Refractoriness in Carlin-type gold ores results mostly from fine locking of gold in pyrite, locking in various gangue phases, notably quartz, and a ""preg robbing"" condition attributed to organic ca

    Jan 1, 1985

  • CIM
    Electrical Safety in the Mining Sector

    By Nelson Lawrence

    An Electrical Risk Management/Inspection Program has been designed specifically for the mining sector in order to provide electrical code expertise and systemic gaps in electrical systems. Goals inclu

    May 1, 2006

  • CIM
    Coal Mining & Reclamation at SPC Operations

    By M. H. Allan

    SASKATCHEWAN POWER CORPORATION is a Provincial Crown Corporation responsible for the production transmission and distribution of electric power and natural gas in the Province of Saskatchewan. Through

    Jan 1, 1978

  • CIM
    Review of Methods for Removing Pollutants from Flue Gases in "Clean Coal Technologies"

    By M. R. Shadnam

    This contribution provides an assessment of research and development efforts to optimize SOx, NOx and mercury capture in flue gas. Coa, characteristics and combustion conditions in a power plant have

    Jan 1, 2010

  • CIM
    Towards the Invisible Mine -Integrated Underground Mining and Processing for Reduced Surface Impacts

    By Andrew Bamber

    Outline ?Background to Mine-Mill Research at UBC ?Mine Mill Integration ?In situ mining methods ?Underground Pre-concentration ?System Design and Supporting Technologies ?Case Studies: ?INCO

    May 1, 2006

  • CIM
    Sintering activity of nano-powders used in the binding systems for refractory castables

    By D. Harris, G. Ye, G. Oprea, J. Rigby, T. Troczynski

    Sintering and ceramic bonding in refractory castables take place mainly in the binding system during the first heat-up and in service. Consequently the strength and the corrosion resistance of the hot

    Jan 1, 2004

  • CIM
    Fluid Motion Characteristics With Gas Injection For Copper Electrorefining At High Current Density

    By Y. Hanada

    Electrorefining at higher current density is desirable due to the increase in productivity attained without expanding the plant size. However, increasing the current density in common commercial pract

    Jan 1, 2007

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining (336da3c3-b002-41ab-b591-f666f29da050)

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    A Possible Role for Pyrite in the Reductive Pyro De-Arsenification of Enargite

    By Yanping Xiao, Ton van Sandwijk, Gus Van Weert, Larry McHugh, Thomas Zabev

    "All attempts to remove significant amounts of arsenic from enargite via neutral or reductive pyro routes have required operating temperatures between 600 and 700 º C, too high to propose an equipment

    Jan 1, 2014

  • CIM
    The selection and application of gear pumps and motors for fire-resistant fluids

    By T. P. Kostek

    "Historically, gear pumps and motors have been popular in the mining industry because of their competitive cost, simple yet rugged construction, ease of rebuild, and relative long life and insensitivi

    Jan 1, 1980

  • CIM
    Highlights of Bill 129: an act to revise the Ontario Mining Act (from a commentary of Osler, Hoskin & Harcourt)

    By Scott L. Ewart, William M. Bryden, Donald E. Wakefield

    "Osler, Hoskin & Harcourt develops commentaries from time to time on topics of legal interest. These may deal with new legislation, changes or developments in government policy or recent judicial deci