Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Process Improvements at Placer Dome Campbell MineBy K. Norris
"The Campbell mill has undergone numerous changes over the past 43 years. However the rate of change has increased significantly in the last 4 years. A new grinding circuit, carbon-in- pulp circuit, p
Jan 1, 1992
-
The Niobec MillBy Michel Robert
"In 1974, Copperfields Mining Corporation and Soquem formed a new company, Niobec Inc, to bring the niobium deposit of the St-Honore carbonatite into production.St-Honore is located in the Saguenay ar
Jan 1, 1978
-
Managing Tailings Facilities for Continual ImprovementBy Elizabeth Gardiner
Tailings and water management facilities are integral components of mine and mill operations. They must be managed for the long term to ensure that safe and environmentally responsible stewardship is
May 1, 2003
-
Experimental investigation of the oxidation and consolidation of sulphide aggregates and the application to underground muck-piles Lockerby Mine, Sudbury, OntarioBy S. Nikolic, O. O. Kehinde-Philllps, O. T. Djamgouz, D. H. Rousell
"A bulk mining method is employed at the Lockerby mine resulting in the formation of large muck-piles. If these muckpiles remain in the stopes for some time they may agglomerate to the extent that the
Jan 1, 1984
-
Only People PolluteBy E. R. Mitchell
When we grow up in an urban environment and choose to become a part of a way of life, it is sometimes difficult to appreciate the cost of this decision in terms of pollution. Explained in this article
Jan 1, 1971
-
Suivi non-destructif de l?évolution de la résistance mécanique des remblais cimentés en pâte: application de la résistivité et de la micro-sismique en laboratoireBy Serge Ouellet
Résumé Six modèles métriques de remblai cimenté en pâte (RCP) ont été suivis durant 120 jours par l?utilisation de deux méthodes géophysiques non-destructives : la résistivité et la micro-sismique.
Feb 1, 2008
-
Improving Machinery Reliability Through Condition Based MaintenanceBy Alan D. Akerman
This paper describes the significant advantages and improvements in operational availability, reduced breakdowns, and overall cost reductions that can be achieved through the application of a Reliabil
May 1, 2002
-
Crystallex’s Las Cristinas gold projectBy J. R. Goode
"The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la
Jan 1, 2005
-
Ultra Fine Milling - Biooxidation Processing of Refractory Gold ConcentratesBy R. W. Lawrence, J. B. Austin, P. B. Marchant, J. T. Chapman
"Biohydrometallurgy is the use of microbiological reactions to assist in the extraction of metals. Bioleaching offers an innovative alternative for the treatment of refractory gold-bearing sulphides (
Jan 1, 1990
-
An Overview of Corporate Social Responsibility in the Canadian Mining IndustryBy Dara L. Hrytzak-Lieffers
Canada has long since been a place that has led the world in mining development, in a safe, clean, and sustainable manner. This has led to the integration of corporate social responsibility (CSR) phil
May 1, 2011
-
Water Supply Sourcing Options for Oil Sands MinesBy Leslie F. Sawatsky
Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin
May 1, 2004
-
Hydrogeological Aspects of Three Open Pits within Noranda OperationsBy L. C. St. Arnaud
"Open pit mines can produce large disturbances within regional hydrogeologic systems. The degree of disturbance and the consequences on the local environment depend on the size of the pit and on the p
Jan 1, 1990
-
Process Mineralogy of Sudbury Platinum Group Minerals as Determined by Mineral Liberation AnalyzerBy Manqiu Xu, Andrew Lee, Frederick D. Ford, Cara Wercholaz
"Platinum-group minerals (PGM) typically occur in such low concentrations that quantitative mineralogical evaluation is difficult or impossible. The FEI MLA system used by Vale Base Metals Technology
Jan 1, 2011
-
Use of the Enviro-Clear Thickener at Quirke MillBy H. Ewaschuk
"INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt
Jan 1, 1977
-
A New Design Approach of Roadside Cut Rock Slope Based on Ecological Environment ProtectionBy Lian-Jin Tao
With fast development of China modernization, road construction obtains great achievement. However, in the construction process of highway, especially the high-grade highway in mountainous area, there
May 1, 2009
-
Leaching Practice at Denison Mines an Historical ReviewBy E. LaRocque
"Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine
Jan 1, 1979
-
EKATI Safety Guarantee A Conversation for an Extraordinary PossibilityBy Richard Morland
Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm
May 1, 2010
-
Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, TurkeyBy C. O. Aksoy
There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary
Jan 1, 2005
-
CERM3 and its contribution to providing sustainable research for the mining industryBy M. Veiga, L. Lavkulich, R. Pakalnis, M. Ghomshei, S. Baldwin, J. A. Meech
"On July 26, 2000, the Canada Foundation for Innovation announced an award of $1.3 M dollars for The Centre for Environmental Research in Minerals, Metals and Materials, CERM3, at The University of Br
Jan 1, 2003
-
Namew Lake Mill ProjectBy K. Hoover, G. Labarre, S. Rantanen
"As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan
Jan 1, 1990