Japanese Activities in Exploring and Evaluating Seafloor Massive SulfidesMore than ten seafloor massive sulfides (SMSs), which tend to be enriched in Au and Ag with varying amounts of Zn, Pb and Ba, have been reported in Japanese Exclusive Economic Zone (EEZ) including the
Jan 1, 2008
-
Special Problems of Management General Report (ee1c3839-95c3-44a2-8c39-4d3652a67bb4)The three papers reviewed here consider different problems of mine management. Comparison of two of the papers demonstrates a marked contrast between the old and the new, in terms of mine management
Jan 1, 1988
-
Requirements for On-Site Testing of Axial Flow FansThe problems associated with achieving adequate accuracy for on-site axial flow fan performance measurements are discussed. The ability to test accurately rests heavily on equipment and installation d
Jan 1, 1973
-
A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysisBy S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen
Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result
Jul 1, 2021
-
A New Methodology for Managing Effective External Stakeholder RelationshipsBy S Zaffron, O Loffredi
A critical concern of any mining company today is its relationship with the different stakeholder groups impacted by the operational activity û communities, unions, vendors, local partners and competi
Jan 1, 2006
-
Use of OPTIMINE Simulation Tool for Mobile Fleet SelectionBy V Kainulainen
Sandvik Tamrock Corp has developed an underground rock flow simulation tool OPTIMINEÖ which is a direct simulation tool for matching suitable technology in rock material flow for underground mine layo
Jan 1, 2000
-
A New Laboratory Flotation Rig for Ore Floatability DeterminationBy E V. Man, O N. Savassi, J-P Franzidis
In flotation, the property that is exploited to effect the separation of a mineral from an ore is referred to as its floatability. Assessment and quantification of ore floatability is of fundamental i
Jan 1, 2000
-
Microtunnelling the Ocean Outfall Pipeline, Christchurch, New ZealandBy R Fleming, G Jones
An ocean outfall is currently under construction in Christchurch, New Zealand to transfer treated wastewater from the existing treatment ponds at the city wastewater treatment plant to diffusers locat
Jan 1, 2008
-
Heterogeneity assessment for grade engineering in complex ore bodiesBy C Sennersten, A Hellicar, C Lindley
Traditional methods of resource modelling and mine planning rely upon geostatistical methods applied to exploration drill core data to derive a three dimensional model of the distribution of metal gra
Nov 21, 2018
-
Evaluation of Genetic Models for Australian Sulphide Nickel DepositsExploration for economic nickel sulphide mineralisation has often been directed by rationalisations based on poorly understood genetic models. Among those that have enjoyed popularity over the pas
Jan 1, 1972
-
Plant Design for Remote Locations in Papua New GuineaBy Majorkiewicz A
Engineering of gold treatment facilities complete with infrastruc- ture in a remote location such as Papua NewòGuinea present unique problems to the design team. Site location, topography, ground co
Jan 1, 1991
-
The Compatibility of Major Economic Criteria for Project EvaluationThe most frequently applied project evaluation criteria are the Net Present Value, the Internal Rate of Return, and the Pay Back Period. Unfortunately, the Internal Rate of Return and the Pay Back Per
Jan 1, 1991
-
Personnel Selection and Problems of Recruitment in a Remote AreaMany problems occur in recruiting staff to remote mining operations, relating to both domestic and works environments. These are stated, together with steps which have been taken to overcome them.
Jan 1, 1980
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Smoke Duct or No Smoke Duct for Road TunnelsBy R Lau
In recently completed road tunnel projects in Queensland, such as the Airport Link and the Clem7 tunnels, there is a smoke duct running along the roof of the carriageways to extract smoke in case of f
Sep 17, 2014
-
Risk Analysis: The Importance of Reserve EstimationBy Champigny N, Grimley P. H
To a bank that granted his request for a loan, the late American humorist Robert Benchley responded, `I don't trust a bank that would lend money to such a poor risk'. This quotation is unl
Jan 1, 1994
-
Flotometric Analysis and Predictive Calculations for Industrial Flotation FlowsheetsBy Kavetsky A
A new model of flotation is presented which allows predictive calculations of total solids flows and metal grades and recoveries to be made for industrial flowsheets. A method of making these calculat
Jan 1, 1992
-
Laterite Ores - Nickel and Cobalt Resources for the FutureAlthough laterite ores already provide a significant proportion of the world's nickel and cobalt production it is anticipated that they will surpass sulphide ores as a source of nickel in the n
Jan 1, 1996
-
Creating a Geotechnical Baseline Report for Project Hobson, AucklandProject Hobson involves the replacement of an existing 90-year-old above-ground sewer that crosses Hobson Bay in Auckland, New Zealand, and which is nearing the end of its economic life, with a 3 km l
Jan 1, 2008
-
Systems Analysis Tools for Promoting Effective Energy/Minerals PartnershipsBy M Stewart, J Petrie, L Basson
This paper explores tools which have the potential to promote and assess the formation of partnerships between the minerals and energy industries to enhance the economic, environmentally responsible a
Jan 1, 2004