Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Quantification of Drill Hole Deviation – Century Mine Case StudyBy C D. Pocock
Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to
Nov 8, 2011
-
Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24By S Dorrington, J Olsen, N Kinkaid
Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often
Nov 4, 2015
-
CITIC concentrate performance in pelletising and sinteringBy L Y. Yang, Z Wang
This work presents the fundamental properties of CITIC magnetite concentrate and its performance in pelletising and sintering. CITIC concentrate has been widely used in pelletising to produce pellets
Nov 8, 2021
-
Combining physical experimentation and mathematical modelling techniques in the simulation of induration and direct reduction processesBy Wright JK, Turner RE, Batterham RJ, Morrison AL
Simulation can play an important role in the design, optimization and control of complete industrial processes, the most appropriate method depending on the particular application. Most commonly,
Jan 1, 1986
-
The Future of the Global Mining SectorBy T Goldsmith
The mining industry is cyclical, but those are more than normal business cycles. In the early 2000s the industry saw the start of China as a game changer for the mining industry which lead to catch ph
Aug 18, 2014
-
Developments in the measurement of stress in rockBy I Gray
Other than being reasonably certain of the average vertical stress being lithostatic, there can be little certainty about stress in the ground. The stresses and strains in rock are a function of gravi
Nov 29, 2022
-
A Case for Change - Defining Mine Sealing and Understanding Flammable Mixtures During SealingBy A Mackay
As a result of the explosion in the 512 panel at the Moura No 2 mine in 1994 the role of the ventilation officer (VO) to submit sealing plans (on behalf of the operator/underground mine manager) has b
Jul 1, 2013
-
KEYNOTE: Back to the Future – Still on the Dark SideBy P D. Munro
"This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and
Oct 10, 2016
-
A Great Project Team - Bringing Together Location and CultureBy A M. Ebbels, D Pratt
The current commodities super-cycle has seen an explosion in the number of mining projects demanding human resources throughout the world. The demand for key personnel currently far outweighs the inte
May 24, 2012
-
What category cyclone is devastating your plant?By T G. Vizcarra, B Wong
Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y
Aug 29, 2018
-
Inadequate Water Management Planning Resulting in Long-term Closure LiabilitiesBy H J. J Boshoff
Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM
Jul 16, 2014
-
Mine Road Design and Management in Autonomous Hauling Operations – A Research RoadmapBy R J. Thompson
In truck-based hauling systems, the mine haul road network is a critical and vital component of the production process. As such, underperformance of a haul road will impact immediately on mine product
Nov 22, 2011
-
A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USABy R H. Knight
Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or
Aug 18, 2014
-
Project Management for All Seasons ù Financial Risk Mitigation in a Challenging WorldBy O C. Aitken
Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark
Jan 1, 2004
-
Full Cycle Tailings Management at Fosterville Gold MineBy L P. Gray
"From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro
Oct 10, 2016
-
Mid Sampling and Reserve Estimation Practice in the Base Metal OrebodiesThe Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr
Jan 1, 1987
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs ViewpointBy J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart
Jan 1, 2003
-
Visualisation of calculated thermodynamic properties by integration of FactSage™ with SEM-EDS element mapsBy S Mitra, D O’Dea, N Barrett, T Honeyands, E Copland
This work describes a novel mapping technique that allows the direct overlay of calculated local phase equilibria on micrographs of the physical system. The technique demonstrated integrates FactSage™
Jun 19, 2024
-
Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena TunnelBy A M. Mueller
St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l
Sep 17, 2014
-
Engaging Society about a Potential Mining Future – Concerns and ExpectationsBy N Boughen
This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range
Nov 22, 2011