Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Machine learning for predicting chemical system behaviour of CaO-MgO-SiO2-Al2O3 steelmaking slags case study

    By B Laidens, D Souza, W Bielefeldt

    The CaO-MgO-SiO2-Al2O3 system, characterised by its intricate phases and thermodynamic properties, plays a pivotal role in steel secondary refining processes, encompassing desulfurisation, non-metalli

    Jun 19, 2024

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Starter dyke optimisation with Muk3D and GoldSim

    By C A. Cooper, G A. Suter

    The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai

    Jul 23, 2018

  • AUSIMM
    Can biocements stabilise tailings storage facilities?

    By G Simpson, S Dressler, A E. Levett

    Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings

    Aug 2, 2023

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023

  • AUSIMM
    Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical Capability

    By G McCullough, B Mutsaers, J Jessop

    "*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become

    Sep 29, 2013

  • AUSIMM
    Evaluation of the environmental benefits of using a conveyor belt mining system in an open pit mine

    By G P. S Resende, D E. G Oliveira, E A. S Baeta, T F. Bravin

    There is currently in the mining industry, as well as in other industries, a movement seeking to increase investments in decarbonisation processes to help combat global warming. Among some initiatives

    Sep 18, 2023

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    Flotation machine gas characterisation – variation between different types of flotation machines

    By D Felipe, G J. Harbort

    In the past 40 years substantial changes have occurred in flotation machines. This has included increases in mechanical cell size to 630 m3 , significant changes to flotation column aeration design

    Aug 24, 2022

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Secondary means of egress via emergency gig

    By R Austerberry, S Green

    The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A

    Mar 15, 2021

  • AUSIMM
    Knelson Continuous Variable Discharge Concentrator: Analysis of Operating Variables

    By I Grewal, B Klein

    The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass

    Jan 1, 2001

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022