Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Case History of the Crusher Level Development at HendersonBy W D. Rech, K W. Keskimaki
As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was
Jan 1, 2000
-
Modern By-Product Coke Oven PracticeAlthough forty-seven years have passed since the by-product coke oven made its successful commercial appearance, it is only during the past fifteen or twenty years that this system of coal carbonisati
Jan 1, 1928
-
The Integration of Geometallurgy with Plant DesignBy G Harbort
Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat
Aug 8, 2011
-
Enigmatic Kinematics Resolved in the Taurus Shear Zone,Golden Pig Gold Mine, Southern Cross, Western Australia ù Resource ImplicationsBy S Robson, T G. Blenkinsop, S C. Dominy
Golden Pig mine is in the central part of the Southern Cross greenstone belt within the Archaean Yilgarn craton. The mine has produced approximately 2.5 Mt of ore at 5.7 g/t Au to yield approximately
Jan 1, 2003
-
Geology of the Leigh Creek CoalfieldBy Townsend IJ
The Upper Triassic Leigh Creek Coal Measures which include a number of seams of sub-bituminous black coal are preserved in four small intramontane basins. The largest is Telford Basin, 1,000 m in
Jan 1, 1975
-
How the Use of Market-Based Risk Metrics can Undervalue Good Mining Projects and Overvalue Poor OnesBy T Y. Dube
In this paper current net present value (NPV) based mine valuation techniques that take into account market and private risk are discussed and analysed. Potential pitfalls that arise from the applicat
May 24, 2012
-
Relationship of Joint Orientation with Hole Spacing Parameter in Multihole BlastingBy Badal R
Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma
Jan 1, 1990
-
Measurement and Assessment of Bulk Explosive ProductsBy G Cavanough, A Olsson, J Rock, A C. Torrance
There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys
Aug 24, 2015
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
Using Independent System Simulation to Mitigate Risk in the Dalrymple Bay Coal ChainBy B Olsson, B Reynolds, R Norman
An unprecedented growth in demand for coal exports has placed pressure on multi-user coal chains to guarantee that their capacity expansion projects will meet the required demand. These projects, howe
May 24, 2012
-
Support of Longwall Workings in Thick Seam ExtractionBy Smith PE
The main components of face design are the power loader, face conveyor and powered support system and the interaction of these components determines the effectiveness of strata control. A major in
Jan 1, 1986
-
Rocks are not EnoughTimes are changing for the mining industry. Civil society is demanding that miners pay more attention to the ways they impact on, and engage with, communities around their mines. Miners, in turn, are
Jan 1, 2005
-
An Investigation into Spoil Stability at MouraBy Dunbavan M, Mallett C. W
The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin
Jan 1, 1981
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013
-
Production of Fertilisers and Smelter-Grade Alumina by Alkali Leaching of Christmas Island 'B' and 'C' Phosphate OresCrandallite and millisite in Christmas Island 'B' and 'C' phosphate ores are rapidly decomposed by sodium hydroxide solutions at about 80QC. As these phosphates generally contain
Jan 1, 1971
-
Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South WalesBy Nixon J. C, Reynolds C
Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod
Jan 1, 1952
-
Bankshooting Techniques at Moura Open Cut Coal Mine, QueenslandBy Hoppe AJ
Drilling and shooting techniques at Moura open-cut have evolved over a period of 16 years and are the result of hard earned experience combined with established practices and consul- tation with pro
Jan 1, 1978
-
Material Flow in Acceleration Zone and Throughput of High Pressure Roller MillsBy Schonert K
The throughput of a HP-roller mill is determined by the acceleration of the feed material within acceleration zone and introduction into the compression zone. Both processes depend on the internal
Jan 1, 1993
-
Coal in the Context of Sustainable Development ù Implications for the Minerals IndustryThe concept of æsustainabilityÆ can largely be defined as development that will not compromise the ælivabilityÆ of the planet for future generations. It has multiple dimensions, such as the triple bot
Jan 1, 2004
-
Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USABy J Furtney, W Fu, D Nutakor, A Brose
Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in
Jun 22, 2022