Search Documents

  • AUSIMM
    Drum Scrubber Design and Selection

    A model has been developed for drum scrubbing which allows selection of geometry and power input. Specific aspects considered are: Calculation of total static and operating volumes. Total residence ti

    Jan 1, 2004

  • NIOSH
    OFR-63-77 Feasibility Study Of A Differential Current Ground Fault Or Leakage Current Sensor For Direct Current Offtrack Machines - 1.0 Introduction

    By Robert R. Perron

    The U.S. Bureau of Mines is engaged in many diverse programs fur improving mine safety. One area of interest to the Bureau is new and improved means for minimizing the hazards of accidental gas igniti

    Jan 1, 1976

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • DFI
    The Seven Steps To Foundation Retrofit

    By Javier Rodriguez

    Adaptive re-use of existing structures in urban environments has become very common due to lack of available space in our cities and requirements for increased structural capacity. Often, it involves

    Jan 1, 2006

  • NIOSH
    IC 8237 Bureau Of Mines Research And Technologic Work On Coal, 1963 ? Introduction (36a83d87-c8b4-46b2-ae0d-6c9d71d3add5)

    Coal research and technologic work by the Bureau of Mines covers a broad program of investigation aimed at conservation and utilization of this important natural resource. Conservation is served by a

    Jan 1, 1964

  • NIOSH
    IC 8237 Bureau Of Mines Research And Technologic Work On Coal, 1963 ? Introduction

    Coal research and technologic work by the Bureau of Mines covers a broad program of investigation aimed at conservation and utilization of this important natural resource. Conservation is served by a

    Jan 1, 1964

  • SAIMM
    Modeling rock mass bulking around underground excavations

    By J. Gómez-Hernández, P. K. Kaiser

    Abstract The process of stress-induced fracturing around underground excavations in brittle rock is associated with dilation or volume increase of the failed, fractured rock. Different attempts to

    Jan 1, 2003

  • NIOSH
    Implications Of Recent NIOSH Tracer Gas Studies On Bleeder And Gob Gas Ventilation Design

    By W. P. Diamond, S. L. Cario, F. Garcia, J. D. Byars, T. P. Mucho

    The National Institute for Occupational Safety and Health (NIOSH) has been conducting research at a Pittsburgh Coalbed longwall mine to evaluate and optimize bleeder ventilation and gob gas venthole l

  • AUSIMM
    Insights From Simulation of a CIL/CIP Circuit

    A model was developed of a CIL/CIP circuit for recovery of gold and silver. The model uses a simple two rate representation of the leaching kinetics. Parameters for the leaching kinetics may be simply

    Jan 1, 2004

  • ISEE
    Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case Study

    By Stuart Brashear, Robert Brush, Ben Cook

    In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W W? Boxley received a series of complaints from the owners of a 130 year-old historic farmhouse that ha

    Jan 1, 1996

  • CIM
    Caractérisation des environnements miniers menant à la corrosion des systèmes de soutènement

    By Jean-François Dorion

    La corrosivité des environnements miniers souterrains est un phénomène peu étudié au Canada. En plus de détériorer les systèmes de soutènement, la corrosion s?attaque aussi à divers installations et é

    Feb 1, 2008

  • SAIMM
    Hydraulic mining of an in situ heavy mineral ore reserve

    By M. Berger

    The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at

    Jan 1, 2003

  • SAIMM
    Shaft Sinking Scheduling/Planning - Introduction

    By P. N. Lategan

    Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m

    Jan 1, 2009

  • NIOSH
    RI 7958 Strengthening Molybdenum by Powder Metallurgical Internal Oxidation of ZrMo2

    By W. L. Brien, O&apos

    Molybdenum alloys with good strength properties at elevated temperatures were produced by the powder metallurgical internal oxidation method previously applied to tungsten and known as oxyreaction str

    Jan 1, 1974

  • ISEE
    Vibration Monitoring Using In-house Developed Devices – A Taylor’s Approach

    By Francisco Sena Leite, Pedro Brito, Auã Kiahla, Raquel Carvalhinha, Tomi Kouvonen, Vinicius Miranda

    Shockwaves that generate vibration in the surrounding environment of a blast, are one of the most important factors to control drill & blasting works near delicate buildings as well as in sensitive st

  • SME
    Maximizing Efficiencies In Thickeners - Automatic Flocculant Dosing Control For Mining Thickeners And Clarifiers

    By J. Evans

    Including: Tailings thickeners, CCD?s, paste thickeners, HI-rate thickeners, lamella thickeners, high compression thickeners, clarifiers etc. Flocculant dosing control for mining thickeners and clarif

    Jan 1, 2011

  • CIM
    Galfan-coated automotive steel improves fabrication and performance

    By Richard F. Lynch, Frank E. Goodwin

    "The development of Galfan, a new generation 95% zinc-5% aluminum-mischmetal alloy coating for steel, offers opportunities for greater fabrication flexibility and upgraded corrosion performance in aut

    Jan 1, 1987

  • SME
    Plastics From Shredder Residue: Pilot Plant Experiences And Data

    By S. Christiansen, G. R. Winslow, R. W. Kobler

    Todays End of Life vehicles are shredded and their metal components recovered and recycled by standard methods. The remaining non-metallic fraction is shredder residue, and contains vast amounts of hi

    Jan 1, 2001

  • AIME
    Introduction Air Classification Symposium

    By Arthur L. Hall

    The purpose of this symposium is to challenge industry to better air classification, and as a first step toward fulfillment, to spotlight three fairly recent, aerodynamically designed, highly efficien

    Jan 10, 1957

  • SME
    Stability Analysis For Steep-Slope Mines Reclaimed Using The Forestry Reclamantion Approach

    The Forestry Reclamation Approach (FRA) specifies that the upper 1.22 m of material on the reclaimed surface should be left as uncompacted as possible to facilitate tree root growth. One of the main c

    Feb 27, 2013