Search Documents

  • SME
    The Effect Of Velocity On The Dispersion Of Pollutants In A Hypothetical Arctic Open-Pit Mine

    By A. Choudhury

    Deep open-pit mines are becoming increasingly common in the highly mineralized arctic and sub-arctic regions. Air inversion is a frequent occurrence in these regions, and is exacerbated by the natural

    Jan 1, 2012

  • ISEE
    “Computerized Drill for Quarrying Automates the Drilling Process”

    By Maurice Hunter

    The paper outlines recent design developments in the computerization of surface crawler drills for the quarry industry. It references the technology firstly developed for the underground mining and co

    Jan 1, 2003

  • CIM
    Roasting Renaissance- Fluid Bed Roasting For Enhanced Gold Recovery from Double Refractory Ores

    By A. R. Barnes, N. Stubina

    Increasingly, gold producers are forced to treat ever more refractory ores. While ores containing pyrite, arsenopyrite and carbonaceous material have been subjected to complete pressure oxidation (PDX

    Jan 1, 2011

  • NIOSH
    OFR-133A(1)-77 Longwall-Caving Mining Method For Thick Coal - Design And Feasibility Study - Final Report, Volume I

    By M. G. Wallis

    This report presents the results of a study to develop a detailed mining method design based on longwall mining with sublevel caving. The method is applicable to low-dipping coal seams 20 or more feet

    Jan 1, 1977

  • AIME
    Other Important World Producers Of Nickel - Outokumpu Oy-Finland's Major Contributor

    On the preceding pages, operations of the four major producers of nickel today have been described. There are, however, other operations in the world that, while not as large, are still of importance

    Jan 10, 1968

  • SME
    Using Metafora To Evaluate The Transport System In A Swedish Open Pit Mine.

    By Bo Forsman

    METAFORA is a simulation model for determination and evaluation of strategies for operating loader/truck systems in mining. A specific version of METAFORA was used to evaluate the haulage system at So

    Jan 1, 1992

  • SME
    Take Time For Pit Phase Design

    By A. Eccles

    Phase designs are the foundation upon which all open pit mine sequence optimizations and budgets should be built. Unfortunately, at times, mine engineers skip the step of developing realistic pit phas

    Feb 27, 2013

  • CIM
    Industry-scale knowledge management\u2014RISKGATE and Australian coal operations

    By D. Sprott, P. A. Kirsch, J. Harris, D. Cliff

    This paper details the work of RISKGATE, the largest Australian Coal Association Research Program (ACARP) occupational health and safety initiative to date. The program is an interactive online risk m

    Jan 1, 2014

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • AUSIMM
    Geological Mapping into the 21st Century: QMAP and GIS

    By I M. Turnbull

    QMAP (the Quarter Million Mapping Programme, 1:250 000 scale) is a geological mapping programme which will build a digital geological database of the whole country and publish maps and books to docume

    Jan 1, 1997

  • AIME
    Nickel and Its Alloys

    By A. J. WADHAMS

    THE relative importance of things is a fascinating subject for thought. As we look about us we realize the Creator of all things has provided the metals for our use, each in the quantity needed-iron i

    Jan 1, 1929

  • SME
    The Plewes Method: a Word of Caution - Mining, Metallurgy & Exploration (2021)

    By LUIS ALBERTO TORRES-CRUZ

    The assessment of liquefaction vulnerability is crucial to understanding the potential consequences of a tailings dam failure. The “Plewes method” is a relatively well-known and simple screening metho

    Jan 28, 2021

  • AIME
    Professional Services

    JAMES A. BARR Consulting Engineer Mt. Pleasant. Tennessee Washington. D.C. BEHRE DOLBEAR G COMPANY Consulting Mining Engineers and Geologists 11 Broadway New York 4, N. Y. BLANDFORD

    Jan 1, 1952

  • AIME
    Professional Services (f9edb78a-6cc0-43df-bc9c-168db5aa1bf4)

    [JAMES A. BARR Consulting Engineer Mt. Pleasant, Tennessee Washington, D.C. BEHRE DOLBEAR & COMPANY Consulting Mining Engineers and Geologists 11 Broadway New York 4, N. Y. BLANDFORD C. BU

    Jan 1, 1952

  • AIME
    Professional Services (fb918c98-f38a-4580-bdc6-144a8f4c0cb4)

    JAMES A. BARR Consulting Engineer Mt. Pleasant; Tennessee Washington, D.C. BEHRE DOLBEAR G COMPANY Consulting Mining Engineers and Geologists 11 Broadway New York 4. N. Y. BLANDFOR

    Jan 1, 1952

  • SME
    Laboratory Assessment Of Rock Fragmentation Process By Continuous Miners – Preprint 97-172

    By V. B. Achanti, A. W. Khair

    Laboratory studies were carried out at West Virginia University to investigate the rock fragmentation mechanism by continuous miners using an automated rotary cutting simulator. The primary factors in

    Feb 24, 1997

  • AUSIMM
    Coagulation-Neutralisation Technology to Treat Wastewater from Lead-Zinc Concentrator

    Coagulation-Neutralisation Technology to Treat Wastewater from Lead-Zinc Concentrator

    Sep 13, 2010

  • IIMP
    La prueba cerrada de flotación

    By Hernán Parra

    Las pruebas cerradas de flotación (ICFT) son necesarias para el diseño de plantas a niveles de prefactibilidad y factibilidad, ya sea en proyectos greenfield o brownfield. Estas pruebas se realizan d

    Aug 30, 2017

  • IIMP
    Perforación, disparo y seguridad de minas a cielo abierto

    By Jorge Díaz A

    El presente texto revisa los métodos utilizados en las minas de tajo de abierto como son la perforación, disparo y seguridad y así mejorar los standars y el rendimiento futuro en la industria minera.

    Aug 20, 1965

  • SAIMM
    Net Present Value Maximization Model For Optimum Cut-Off Grade Policy Of Open Pit Mining Operations ? Synopsis

    The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and refining capacity constraints. The traditional approaches

    Jan 1, 2011