Search Documents

  • CIM
    An investigation on minimizing reagent consumption in ammonium thiosulphate gold leaching

    By Chen Xia, G. Deschenes, Wan-Tai Yen

    "Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum

    Jan 1, 2002

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • SME
    Arizona?s Mining History Featured At Precious Metals Symposium

    All aspects of precious metals processing were featured at a symposium held Oct. 3-6, 2007, at Loews Ventana Canyon Resort in Tucson, AZ. Although billed as "Precious Metals Processing: Advances in

    Jan 1, 2008

  • SAIMM
    Assessing risk in grade-tonnage curves in a complex copper deposit, northern Brazil, based on an efficient joint

    By M. B. Fonseca

    Risk quantification in grade-tonnage curves is critical for capital investment in mining projects and can be obtained through geostatistical simulations of orebodies. A practical difficulty may arise

    Jan 1, 2003

  • ISEE
    Ore Waste and Dilution Studies of Surface Mineral Blasting with 3D Distinct Element Heave Models

    By Stewart A. Silling, Dale S. Preece

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Modeling the movement of full scale blasting is no

    Jan 1, 2016

  • SME
    New Tunneling Innovations Revolve Around More Efficient Disc Cutters

    By Desiree Willis

    Disc cutters have determined excavation rates of rock tunneling projects for more than 50 years. First developed in 1956 by James S. Robbins, disc cutters (then 279 mm or 11 in. in diameter) were use

    Jan 1, 2007

  • SME
    Applying Human Factors Engineering To Mining Systems

    By Craig Hartley

    ? A helper stands beside a continuous miner as the operator is at the controls. The operator means to push the stop button but hits the drum rotation start button by mistake. The drum begins to turn a

    Jan 1, 1983

  • AUSIMM
    Resource Estimation Practice, Macraes Gold Project

    By M Stewart

    In January 1994, Macraes Mining Company started a new phase of exploration to find additional resources along strike and down dip of identified resources for a mill that was being expanded from 2.1 Mt

    Jan 1, 1997

  • NIOSH
    OFR-23(1)-77 Comparison Of Uniform Four-Foot Length, Fully-Grouted Resin Roofbolts And Alternating Four-And Six-Foot Length, Fully-Grouted Resin Roofbolts ? 1.0 Summary And Conclusions

    By Joe Maher

    Adequate mine roof support to insure the safety of men and equipment is essential to successful mining. It is also expensive, amounting to more than one-fifth of the total mining cost at the White Pin

    Jan 1, 1975

  • NIOSH
    OFR-156(1)-77 Technical And Cost Evaluation Of Candidate Large Scale Open Pit Oil Shale Mining Methods In Colorado ? Volume I

    By R. C. Adams

    This report describes the feasibility of mining the oil shale deposits of the Piceance Creek basin in Colorado by an integrated open pit system. The study is based upon a comprehensive analysis of per

    Jan 1, 1976

  • DFI
    High Stress Pile Testing At Soldier Field

    By Michael H. Wysockey

    The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu

    Jan 1, 2002

  • IIMP
    Metodología general para la ejecución de piques verticales en terrenos altamente deformados

    By Enrique Castells

    La extracción del mineral es el método más habitual para la explotación minera y se realiza a través de rampas, galerías, y túneles que permitan el acceso hasta la zona de minado. Sin embargo, cuando

    Sep 13, 2001

  • DFI
    Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method

    By Masaki Kitazume

    "Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua

    Jan 1, 2014

  • DFI
    The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis

    By Kenneth Gavin

    The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded

    Jan 1, 1996

  • AUSIMM
    The Products of Boiling Hydrothermal Fluids in the Golden Cross Epithermal Deposit

    By M P. Simpson, J L. Mauk

    The Golden Cross, low-sulfidation, epithermal deposit shows a number of features that are directly or indirectly related to boiling hydrothermal fluids. Occurrences of lattice calcite and their quartz

    Jan 1, 2000

  • AUSIMM
    Presidential Address, 1955

    The first mention of gold in Western Australia was in 1848 when some specimens of copper ore, which are believed to have come from the Murchison district, were sent to Adelaide for assay. Gold was pre

    Jan 1, 1956

  • AUSIMM
    Taharoa Minesite Plant Relocation

    By P Rowe

    New Zealand Steel's Taharoa titano-magnetite mine, south of Auckland, set two national load records when it transported around 2000 t of mining equipment three kilometres overland on time, under

    Jan 1, 2001

  • AUSIMM
    Mount Morgan Ore Concentration

    By Wilson O. A

    TABLE OF CONTENTS1. Introductiona. Process Changes since 1939.b. Current Practice.2. Ore Characteristicsa. Copper Minerals.b. Gold Occurrence.3. Treatment of High Grade Acid Orea. The Ore Treatment Pl

    Jan 1, 1952

  • AUSIMM
    The Geology of the Golden Cross Mine, Waihi, New Zealand

    By P C. Couper, P C. Keall, S J. Mathews, A Francis

    An epithermal gold-silver deposit is presently being developed at the Golden Cross Mine in the Waitekauri Valley, 8 km northwest of Waihi, New Zealand. Highest grade mineralisation underground is main

    Jan 1, 1991

  • AUSIMM
    Geochemical Prospecting of the Bureau of Mineral Resources

    Geochemical projects in progress or recently completed in the Bureau of Mineral Resources, Geology, and Geophysics (BMR) cover a wide range of topics and include research projects, regional studies, a

    Jan 1, 1970