Search Documents

  • CIM
    Development of Pasquia Hills Oil Shale Deposits

    By Baki Özüm

    Early evaluations of Pasquia Hills kerogen shale deposits by Geological Survey of Canada, Saskatchewan Geological Survey, Manitoba Energy and Mines and Sun Oil Company, using modified Fischer Assay, R

    May 1, 2002

  • ABM
    Simulação Da Degradação Mecânica De Pelotas De Minério De Ferro Em Forno De Redução Direta

    By Fernando O. Boechat

    Com a redução da oferta de minério granulado de boa qualidade no mercado mundial e as restrições ambientais à sinterização, as pelotas de minério de ferro passaram a ocupar um papel importante como ma

    Aug 1, 2018

  • AIME
    Index (Transactions and other A.I.M.E. Publications for 1930)

    [Separates of all the Technical Publications published in 1930 are available at Institute headquarters. All the papers are on file in public, university and technical libraries, and when so indicated

    Jan 1, 1930

  • SME
    Development of a Sustainability Evaluation System

    By C. Pieper, J. B. Pateiro Fernandez, S. Möllerherm

    "Since the United Nations conference on "environment and development" in Rio de Janeiro in 1992, the term "sustainable development" or short "sustainability" is used more and more in social-political

    Jan 1, 2005

  • TMS
    Modeling on Fluid Flow and Inclusion Motion in a Continuous Casting FC-Mold

    By Xinhua Wang, Qiangqiang Wang, Yubin Li, Shusen Li, Lifeng Zhang

    "Numerical simulation on the fluid flow in a Flow-Control Mold (FC-Mold) were performed. The motion of inclusions were calculated. With FC-Mold, the flow pattern and surface velocity become more symme

    Jan 1, 2013

  • NIOSH
    IC 6722 Timber Withdrawing And Devices Used For This Purpose In Some Coal Mines - Meaning And Purpose Of Timber Withdrawal

    By J. W. Paul

    Withdrawing timber in coal mines is done for the purpose of inducing the roof to cave in the mined-out areas and thereby relieve stresses in the immediate roof material over the working places adjacen

    Jan 1, 1933

  • AIME
  • SME
    Using Risk Analysis To Support Decision Making On The Central Subway Project

    What decision making tools and methods are available to a project owner when there is no clear differentiator between construction alternatives? A team led by a joint venture of Parsons Brinckerhoff a

  • NIOSH
    IC 8366 Hot Carbonate Purification Computer Program

    By Paul Wellman

    A computer program is presented that may be used to calculate the bare equipment cost of the major processing units for any hot potassium carbonate gas purification system. The program is designed suc

    Jan 1, 1968

  • CIM
    Networking Tertiary Education and Industry

    By J. F. Archibald

    This paper reviews the formation of the Canadian Mining Education Council (CMEC) and its terms of reference. CMEC considers that Canada?s mining schools represent a distinct competitive advantage to t

    May 1, 2002

  • CIM
    Standardization of Data Formats as Basis for Future Efficient Mine Production

    By Christoph Mueller

    Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro

    May 1, 2002

  • SME
    Investigation Into Conveyor Fires And Experience With Protective Devices At Inco Limited

    By Jozef S. Stachulak

    INTRODUCTION Conveyor belt fires represent a serious hazard in underground mines. This fact is well understood in most mining countries. The statistical data for Ontario mines (1) indicates that

    Jan 1, 1991

  • SME
    ISO 9000 Gains Ground in the Industrial Minerals Industry

    By Tim O’Neil

    ISO 9000 is a system of quality standards that originated in Europe in the 1980s and has since been widely adopted by manufacturing companies throughout the world. The ISO 9000 standards have received

    Jan 1, 1995

  • NIOSH
    RI 6759 Use Of A Continuous Borer In Mining Pitching Anthracite Beds

    By W. H. Tavenner

    The Bureau of Mines gathered test data on the use of a continuous borer in mining an anthracite bed, which was 30 feet thick on a pitch of 15° to 45°. Gangways were driven with the continuous borer,

    Jan 1, 1966

  • SME
    Industrial Minerals 2004 – Sillimanite Minerals

    By D. B. Spears

    The sillimanite group includes the aluminosilicate minerals sillimanite, kyanite and and alusite, all of which have the same chemical composition (Al2SiO5). This discussion also includes the closely

    Jan 1, 2005

  • SAIMM
    State of labour protection at coal mines analysis on the basis of economic risk

    By S. G. Gendler

    One of the ways of trauma and occupational diseases level reduction is noted to be the improvement of the labour protection measures planning. As an indicator for prospective trends determination in t

    Jan 1, 2003

  • AUSIMM
    Mineralogy and Economic Significance of the Bentonite Occurrences in the Upper Hunter Valley

    By Loughnan FC

    There are some thirteen laboratories in Australia in which coal petrological work is carried out on a consistent and routine basis. Applied coal petrological research is conducted by several instit

    Jan 1, 1989

  • SME
    Burying The Dinosaurs: Achieving Breakthrough Safety Performance Without A Safety Department

    By B. Cavender

    Safety departments have traditionally been held responsible for the safety performance of their division or company. This approach leads to a lack of ownership of safety issues by the larger organizat

    Jan 1, 2000

  • NIOSH
    OFR-25(2)-83 Monitoring And Modeling Of Shallow Ground Water Systems In The Powder River Basin - Appendices

    By Donald Koch

    The project investigated regional impacts of mining on the ground water system of the Powder River Basin by: 1) establishment of a regional ground water monitoring network. and 2)development at a set

    Jan 1, 1982

  • SME
    The Fallacy of Tunnel Formwork Removal

    By Wern-ping (Nick) Chen

    In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t

    Jan 1, 2008