Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Investigation of the Classification Operation in a Coal Pulverising Vertical Spindle MillInvestigation of the Classification Operation in a Coal Pulverising Vertical Spindle Mill Coal pulverisation in power plants is a major electrical energy consumer. In 2006 more than 41 per cent of wo
Sep 13, 2010
-
Using Dynamic Anisotropy To Improve Resource EstimationBy K. Zabrusky
Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami
Feb 27, 2013
-
Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?By J. A. Hayes
For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d
Jan 1, 2003
-
A Geotechnical Investigation of Opal Mining Practices at Lightning RidgeBy J M. Galvin, B J. McKinnon
Lightning Ridge, Australia, is the largest opal producing area in the world. Most opal is mined from shallow underground mines by individuals or small partnerships with the industry having been protec
Jan 1, 2002
-
Human Resources and Exploration Economics in a Developing Pacific RimA vital ingredient in ensuring that metals exploration companies, working in the developing countries of thePacific Rim, support the development of national geologists is making such a learning progra
Jan 1, 1995
-
Abrasive Materials (MATERIALS MINERALS YEARBOOK-1980)By G. David Baskin
Changes in the 1978 quantity and value of the sales of various natural abrasives, compared with the data for 1977, were of a mixed nature. Output of tripoli-type materials and garnet increased in both
Jan 1, 1980
-
Cut-off grade determination for the maximum value of a small Wits-type gold mining operationWork undertaken in the field of cut-off grade optimization has not advanced much beyond the work undertaken by Lane in 1988. His definitive work is based on the calculus of the Net Present Value crite
Jan 1, 2003
-
The Recovery Of Chrome And Manganese Alloy Fines From SlagBy J. H. Van Reenen, H. Thiele, C. Bergman
For some time spirals have been the process equipment chosen to recover metal in the size range 0.15 to 3mm from ferrochrome and silico/ferro manganese slags. Recoveries of metal obtained using spiral
Jan 1, 2004
-
Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, ChileBy Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson
"Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr
Jan 1, 2008
-
OFR-77(2)-75 Extinguishing Coal Mine Fires By Remote Sealing - Volume II - SummaryBy D. Randolph Berry
The objective of this program was to develop a system to extinguish coal mine fires by remote sealing of the underground passageways. The system developed had to be versatile enough to function under
Jan 1, 1973
-
Numerical Modeling of Standard Rock Mechanics Laboratory Tests using a Finite/Discrete Element ApproachBy S. Stefanizzi
In the present paper, numerical simulations based on a finite/discrete element approach are used to study deformation and failure process during standard rock mechanics. FEM/DEM modeling has been used
May 1, 2009
-
Rail Haulage TransportationOn a worldwide basis trackbound transportation is on the decline. As mining operations progress from open cast operations to underground operations, most utilise mechanised equipment. However, in Sout
Jan 1, 2005
-
Coal and Gas Outburst in a Coal Mine Shaft Development: A Case StudyBy Mingju Liu
China has been suffering from coal and gas outbursts since 1950s. Nowadays, the situation has become worse than ever with the need to mine deeper coal deposits at higher production rates in a more com
Jan 1, 2007
-
CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra LeoneBy Peter Dunn
London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for
May 1, 2011
-
RI 4490 Zinc-Lead Ore Reserves Of The Tri-State District Missouri-Kansas-OklahomaBy Otto Ruhl
The zinc-lead ore reserves of the Tri-State district of Kansas, Missouri, and Oklahoma, as of December 31, 1947, are estimated at a total of 66,100,000 tons of crude ore containing 2.18 percent metall
Jan 1, 1949
-
Installation Of A State-Of-The-Art Ventilation Shaft At A New Mexico Coal MineBy A. Zeni, S. L. Bessinger, T. A. Palm
San Juan Coal Company (SJCC) operates an underground coal mine near Farmington, New Mexico. Continuous miners and a longwall produce 7-8 million tons per year. The coal seam at SJCC has tested to
Jan 1, 2006
-
Pressure Leaching of Enargite-Pyrite ConcentratesBy María Cristina Ruiz
Enargite rich copper concentrates can not be treated by conventional smelting/converting technology and thus nonconventional methods such as leaching must be used. Since enargite (Cu3AsS4) is a hard t
Jan 1, 2010
-
Failure Mechanics Of Multiple Seam Mining InteractionsBy R. Karl Zipf
Multiple seam mining interactions caused by full extraction mining, whether due to undermining or overmining, frequently involve tensile failure of the affected mine roof. The adverse ground control
-
Magnetic Field Application In Cationic Silica Flotation Of Magnetic Taconite Concentrates (e19dde4c-abfd-4256-888b-d05febe2f23a)By S. Ersayin, I. Iwasaki
Application of a magnetic field was shown to be effective in controlling iron losses in pilot-scale cationic silica flotation in the processing of magnetic taconite concentrates. The design of a magne
Jan 1, 2002
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008