Search Documents

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • NIOSH
    OFR-143-80 Determination Of In Situ Horizontal Rock Stress On Both A Mine-Wide And District-Wide Basis

    By Jose P. T. Agapito

    Several underground coal mines currently operating in the Beckley District of West Virginia are experiencing serious roof and floor problems. A significant portion of the estimated two billion tons of

    Jan 1, 1980

  • CIM
    The Onça Puma Nickel Project

    By Ruy L. Rodrigues

    Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t

    May 1, 2010

  • NIOSH
    RI 9576 - Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead, SD (In Three Parts)

    By M. E. Poad, M. M. McDonald, J. C. Johnson, W. G. Pariseau

    A U.S. Bureau of Mines case study of pillar recovery in high-grade ore near the Ross shaft at the Homestake Mine, Lead, SD, has demonstrated the usefulness of the finite-element method for evaluating

    Jan 1, 1995

  • NIOSH
    The Mineral Industry Of Other Central African Countries - Cameroon (47b88b5e-b0a8-4d39-b316-6b9d57479727)

    By George A. Morgan

    The successful expansion of crude oil production begun in late 1977, led to promising development of the nonfuel minerals sector. Although actual production of nonfuel minerals was limited both in var

    Jan 1, 1982

  • DFI
    Bearing Capacity And Slope Instability Solved By Novel Ground Engineering Solutions

    By T. J. Snell

    Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes

    Jan 1, 2006

  • ISEE
    Explosive Detection Recovery and Disposal

    By Robert McClure

    The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc

    Jan 1, 2015

  • NIOSH
    IC 8761 Preliminary Economics Of Mining A Thick Coal Seam By Dragline, Shovel-Truck, And Scraper Mining Systems

    By Michael J. Bertoldi

    The purpose of this Bureau of Mines report is to describe the methods and establish the basic economics for dragline, shovel-truck, and scraper mining systems. An overall view of the techniques of pre

    Jan 1, 1977

  • SME
    Geologic Investigation Of The Muskeg River Mine, Ft. McMurray, Alberta

    By M. Fustic, A. H. Paul

    The geology of the Muskeg River Oil Sands Mine is described to demonstrate how geologic modeling aided in resource evaluation and material characterization during the feasibility and construction stag

    Jan 1, 2002

  • NIOSH
    IC 8107 Platinum Expansion Values For Thermal Calibration Of High-Temperature X-Ray Diffraction Cameras And Diffractometers

    By William J. Campbell

    Expansion measurements of platinum, added as an internal standard, are used for thermal calibration of X-ray cameras and diffractometers. Accuracy of the temperatures derived by this technique depends

    Jan 1, 1962

  • AUSIMM
    Structural Controls on Mineralisation at the Broken Hills Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland, S Rabone

    Most epithermal Au-Ag deposits in the Hauraki Goldfield are hosted in late Miocene andesites. Broken Hills is an exception, being one of the few economic deposits hosted in rhyolite. Investigation of

    Jan 1, 2003

  • DFI
    A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? Summary

    By Michael D. Justason

    This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola

    Jan 1, 1997

  • SAIMM
    Size Dependent Gold Deportment In The Products Of Copper Flotation And Methods To Increase Gold Recovery

    Plant survey data has shown that gold recovery through a specific copper concentrator was significantly lower than copper recovery. Size-by-size analysis revealed that this was due to poor recovery of

    Jan 1, 2003

  • SAIMM
    Rheological Characterisation Of Mineral Slurries Using Balanced Beam Tube Viscometry

    By P. T. Slatter

    The efficient and accurate design of pipe and pumping plant for non-Newtonian mineral slurries remains a problem. The objective of this paper is to present the development of the Balanced Beam Tube Vi

    Jan 1, 1998

  • AIME
    Addresses Given at Banquet

    By Lawrence Addicks

    T HIS has been a most momentous year in the annals of the Institute. We have been in the midst of a situation which, were it not for the convulsions of social unrest with which life is surrounded on e

    Jan 1, 1920

  • AIME
    Industrial Minerals - Eastern Washington-Idaho Clay Basin

    By E. C. Stephens

    The eastern Washington— Idaho clay region stretches along the northeast margin of the Columbia basin for 150 mil es. The three better known and developed clay areas are Clayton, Wash., (2 miles north

    Jan 1, 1961

  • AIME
    Rock Mechanics Studies In A Mechanized Longwall Coal Mine

    By Paul H. Lu

    Methods and results of measuring three basic parameters for ground stability control, ground pressure, strata movement, and geomechanical properties of mine rock are presented in this paper. It is fou

    Jan 1, 1984

  • IOM3
    Comprehensive belt conveyor network design: a superior method to simulation

    By Qing Wang, H. Sevim

    Belt network simulators are the most widely used models in the design of belt networks. The simulators developed in the past two decades are reviewed and their limitations are discussed. To overcome t

    Sep 1, 1991

  • AUSIMM
    The Post-Mining Water Balance

    By A Watson

    We tend to overestimate the volume of water used to process ore and the evaporation from tailings and heap leach stockpiles. During mine operation, a significant portion of the water collected from on

    Jan 1, 2009

  • ISEE
    Advanced Technology for Blast Design, Execution & Assessment

    AQUILA Mining Systems Ltd., designs, develops and delivers systems for measurement, analysis, simulation, control and automation to the mining, construction and petroleum industries. The objective of

    Jan 1, 1994