Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
OFR-115-81 Continued Research On Combined Fire/Rot Retardant Treatment For Wood Mine TimberBy William H. Holley
Thirteen additional preservative/fire retardant systems were applied to Ponderosa pine and evaluated for flammability both before and after water leaching. The more promising four systems were giv
Jan 1, 1980
-
Some Observations In Ore Search - SymposiumBy L. C. Graton
[CONTENTS PAGE INTRODUCTION AND ACKNOWLEDGMENTS. By George M. Fowler2 Question 1-Is Structural Deformation of Some Character Always Necessary for the Migration of Mineralizing Solutions, Especial
Jan 1, 1940
-
The 2,000-Ton Leaching Plant At AnacondaBy Frederick Laist
AFTER a series of experiments covering a period of about three years, ending from the spring of 19iJ.2 to the spring of 1915, a 2,000-ton leaching plant for the treatment of the accumulated copper con
Jan 8, 1916
-
High Aspect Ratio Nickel Structures Fabricated by Electrochemical Replication of Hydrofluoric Acid Etched SiliconBy Xi Zhang
A technique for fabricating free-standing, high-aspect-ratio porous and pillar-type Ni structures has been developed using wet Si processing. A wafer of (100) Si was initially etched in HF solution to
Jan 1, 2006
-
Potash Processing, an Overview with Particular Reference to the Cominco PlantBy A. F. Banks
"Potash processing has much in common in terms of unit operations and plant operating strategy with other mineral processing plants. As it is a rather large topic the processes will be broad brushed t
Jan 1, 1976
-
OFR-35-85 Productivity Of Parent Materials On Mined Prime Farmlands Using Alternative Sources Of Organic Materials Compared To Topsoil ReplacementBy J. H. Jones
The original term of grant No. 1115174 was September 1980 through December 1983. An extended progress report, covering this time period, was forwarded to the Bureau of Hines in January 1984. The p
Jan 1, 1985
-
Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall PerformanceBy Reinhard Gnilsen
Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i
Jan 1, 1988
-
IC 6608 Methods And Costs Of Quarrying, Crushing And Grinding Limestone At The Plant Of The Southwestern Portland Cement Co., El Paso, Texas ? IntroductionBy Robert T. Mann
This paper is one of a series being prepared for and published by the United States Bureau of Mines on the quarrying, crushing, and grinding of limestone for cement manufacture. These papers are desig
Jan 1, 1933
-
OFR-161(1)-81 Control Of Water Pollution From Surface Mining OperationsBy David R. Jessey
Water pollution problems associated with surface metal/nonmetal mines throughout the United States were assessed. Three major problems were identified: acid mine drainage (AMD), toxic concentrations o
Jan 1, 1981
-
Aviation - Aerial Geologizing Most Important of Applications to Mining IndustryBy Theodore Marvin
FOLLOWING the receipt of questionnaires from many parts of the world, the Aviation Committee is completing a review of the use of aviation in mining and petroleum operations. The summary of this study
Jan 1, 1937
-
Copper Solvent Extraction: Status, Operating Practices and Challenges in the African Copper BeltBy Kathryn C. Sole, Owen Tinkler
"Although the first large-scale application of copper recovery by solvent extraction (SX) took place in Zambia in the early 1970s, it is only in the last decade that this technology has become widely
Jan 1, 2015
-
Numerical Parametric Study of Floor Heave in Gate Roads Caused by Longwall-Induced Abutment LoadingFloor heave events in underground mining often happen suddenly and cause risk to workers and equipment. Reducing the risk of floor heave must be addressed in mining layout design. To improve that desi
Jan 7, 2020
-
Proposed Criteria For Subsidence Damage To Buildings (d2ee0f1e-295b-4fb1-ab17-d19f1e17df4a)By Swapan Bhattacharya
United States federal and state regulatory authorities require underground mine operators to adopt adequate measures to minimize material damage to the surface caused by nine subsidence. This paper pr
Jan 1, 1984
-
An Innovation Of Practical Underground Stope Design Optimization And Cut-Off Grade CalculationAn incremental analysis based stope design optimization method was developed at Exodus, an underground project located 30 miles north of Carlin, Nevada. Traditional underground stope design methods, b
Jan 1, 2012
-
Physical and Chemical Recycling of Placer Gold: Implications for Exploration in Central OtagoBy D Craw
Uplift of the antiformal ranges in Central Otago,
Jan 1, 1992
-
Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine ShaftBy R. Thornton
Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he
Feb 27, 2013
-
IC 6984R Mineral Wool ? Introduction And AcknowledgmentsBy J. R. Thoenen
In June 1929 the Bureau of Mines issued a 13-page information circular entitled "Mineral Wool," which was one of the first publications to present to the public Rome technical aspects of the mineral-w
Jan 1, 1939
-
Development Of An On-Line Coal Washability Analysis System Using X-Ray Computed TomographyBy G. T. Adel, J. D. Miller, C. L. Lin
Washability analysis determines the maximum separation efficiency that can be achieved in the operation of coal preparation plants. Unfortunately, there are no on-line techniques for determining this
Jan 1, 2000
-
Treatment of complex copper concentrates in the TBRC at BolidenBy Sune Eriksson, Stig Peterssonsune, Christer Fridfeldt
"Boliden Metal Corporation has developed a technique to treat complex copper concentrates containing large amounts of lead, zinc, arsenic, antimony and bismuth which cannot be treated in conventional
Jan 1, 1981
-
OFR-47-80 Interpretation Of Rock Mechanics Data (Vol. II) (A Guide To Using UTAH2)By William G. Pariseau
A brief description of a two-dimensional elastic-plastic finite element program intended for mine stability analysis is presented that includes detailed instruction for input data preparation and how
Jan 1, 1978