Search Documents

  • ISEE
    Investigation into Monitoring of Initiator Performance

    By Charles Deacon

    The mining industry is constantly taking greater cognisance of their operating costs as a strategy to counter the effects of falling commodity prices. As a result, optimal operating efficiency is more

    Jan 1, 2000

  • NIOSH
    OFR-90-80 Factory Integration Of An Illumination System Into A Continuous Mining Machine

    By Bruce Rock

    A continuous mining machine was redesigned for the installation of an integrated illumination system. The illumination system was designed by first calculating the theoretical number of luminaires req

    Jan 1, 1979

  • NIOSH
    IC 8514 Summary Of Mining And Petroleum Laws Of The World (In Five Parts) 2. East Asia And The Pacific

    By Northcutt Ely

    This volume summarizes mining and petroleum legislation in 25 jurisdictions of East Asia and the Pacific. Within these jurisdictions, primary attention is given to requirements that must be met in eac

    Jan 1, 1971

  • AUSIMM
    Copper Refining and Production of Semi-fabricated Products at Copper Refineries Ltd

    Within CRLÆs lifetime there have been a number of products that have proceeded through their life cycles. In each case market forces and technological advances have forced the cessation of the product

    Jan 1, 1998

  • SME
    Performance Characteristics Of Geogrid When Used For Roof And Rib Surface Control

    By D. R. Dolinar

    Geogrids can be used as surface control on both the roof and rib in underground mines to prevent the fall of small pieces of rock and material from between the primary supports. The use of screen mate

    Feb 27, 2013

  • SAIMM
    Excavation simulation for information-oriented construction of large powerhouse caverns at depth

    By J. Xiao, Y. Jiang, Y. Tanabashi, Z. Song

    Modelling the effect of blasting-caused damage, anisotropy of rock masses and excavation sequence on deformational behaviour and stability of large-scale underground caverns is important in the design

    Jan 1, 2003

  • AIME
    Chuquicamata Sulphide Plant: Tailing Disposal

    By R. M. Kuralt

    CONCESSION from the Chilean government granting the company use of the Rio Salado water stipulates that a minimum of 35,000 metric tons of such salty water must be diverted from the Salado daily, and

    Jan 1, 1952

  • CIM
    The Niobec Mill

    By Michel Robert

    "In 1974, Copperfields Mining Corporation and Soquem formed a new company, Niobec Inc, to bring the niobium deposit of the St-Honore carbonatite into production.St-Honore is located in the Saguenay ar

    Jan 1, 1978

  • AUSIMM
    A Petrographic and Oxygen Isotope Study of Banded Epithermal Veins from the Martha Hill Au-Ag Mine, Waihi, New Zealand

    By G B. Arehart, J L. Mauk

    Quartz veins from the Martha Hill epithermal gold-silver deposit, Waihi, commonly exhibit crustiform banded textures. Visual differences observed between bands are primarily the result of a 1 to 1500

    Jan 1, 1995

  • DFI
    Defective Piles In Clay - Synopsis

    By S. Narasimha Rao

    Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin

    Jan 1, 1996

  • NIOSH
    An Active Proximity Warning System For Surface And Underground Mining Applications

    By W. H. Schiffbauer

    NIOSH has developed an active proximity warning system called HASARD (Hazardous Area Signaling and Ranging Device) for warning workers as they approach known dangerous areas around heavy mining equipm

  • NIOSH
    IC 8125 Mica - A Materials Survey - Introduction And Summary

    By Milford L. Skow

    MICA is a group name for a number of complex hydrous aluminum silicate minerals that have a sheet or platy structure and extremely variable and complex compositions containing various metallic ions, p

    Jan 1, 1962

  • SAIMM
    Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - Synopsis

    By J. J. Bezuidenhout

    The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp

    Jan 1, 2008

  • SAIMM
    Recent Developments In Physico-Chemical Characterization And Modelling Of Ferroalloy Slag Systems

    Recent studies on the physico-chemical properties of molten slags and oxide solid solutions of interest are reviewed. The review covers redox and phase equilibria in slags, viscosity, diffusivity, ele

    Jan 1, 2004

  • CIM
    Robotic Mapping of Underground Drift Networks

    By Unal Artan

    It is well known in the robotics community that the ability to determine the position of vehicles in real time is a key enabling technology required for automation, traffic management, and to ensure s

    Oct 1, 2009

  • SAIMM
    Solving of determinate mining—Economic models by the method of Monte Carlo

    By I. V. Lunkin, E. B. Rakishev, B. R. Rakishev

    In mining the method of statistical tests is used by solving of problems, exposing to influence of random factors. Such problems are: rational selection of equipment set; co-ordination in time of diff

    Jan 1, 2003

  • NIOSH
    OFR-70-81 Evaluation Of The Environmental Factors Involved In Metallurgical Processes To Utilize Domestic Resources For Production Of Alumina - Environmental Aspects Of Preliminary Pilot-Plant Design

    By T. Bertke

    This document assesses the environmental aspects of a preliminary design for processing kaolin clay as the domestic resource for recovery of alumina by a hydrochloric acid leach-HCl gas induced crysta

    Jan 1, 1980

  • NIOSH
    OFR-3-76 Feasibility Of Remote Control And Development Of Remote Control Devices And Sensors ? Shuttle Car Sensor System - Supplement - Automatic Steering Control For Mine Shuttle Car (Phase I)

    By Richard L. Fowler

    An automatic steering control system was designed, installed and tested on a coal mine shuttle car. The system utilizes sensors and associated signal processing electronics developed under a previous

    Jan 1, 1975

  • RMCMI
    Carbon Management

    By Michael L. Jones

    Outline ?Background ?Identify and quantify CO2 sources ?Consider options for CO2 separation and capture ?Review options for sequestration/reuse ?Determine best option for managing CO2

    Jan 1, 2008

  • CIM
    A Simple Method to Estimate Tensile Strength and Hoek-Brown Strength Parameter mi of Brittle Rocks

    By M. Cai

    A practical simple method is proposed to estimate the tensile strength (st) of strong brittle rocks from the strength ratio of R= sc/st = 8 sc/sci, where sc is the uniaxial compressive strength and sc

    May 1, 2009