Search Documents

  • SAIMM
    A Model For Direct Dragline Casting In A Dipping Coal-Seam

    By B. Erdem

    This article introduces a computer model, which emphasizes panel design for draglines deployed in direct side-casting mode. The study covers flat and inclined coal-seam conditions with the dragline op

    Jan 1, 2004

  • SME
    MINExpo International 2000 and World Mining Congress Will Meet in Las Vegas

    The more than 40,000 mining industry professionals that are expected to attend the National Mining Association’s(NMA) MINExpo International2000 trade show and conference will be treated to the exhibit

    Jan 1, 2000

  • AUSIMM
    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    Sep 13, 2010

  • IOM3
    Discount rates and risk assessment in mineral project evaluations; Risk assessment in reserve estimation and open-pit planning; Inclusion of risk assessment in open-pit design and scheduling: contributed remarks

    By H. K. Taylor, B. Denby, L. D. Smith

    Contributions by H.K. Taylor and G.A. Davis discuss the three papers published in Transactions IMM A, vols. 103 and 104, with responses by Smith and Dowd

    Dec 1, 1995

  • AIME
  • AUSIMM
    Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)

    By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes

    Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p

    May 9, 2016

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • SME
    Thermal Fragmentation as a Possible, Viable, Alternative Mining Method in Narrow Vein Mining? Mining, Metallurgy and Exploration (bd487436-b3d1-4763-8a02-8d7c396a0d79)

    By Larissa Koroznikova, Steve Durkin, Patrick Bouwmeester, Michael Tuck

    In currently used mining methods, blasting techniques often causes dilution of valuable ore and results in costly processing requirements. In the context of narrow vein mining of thin and highly conce

  • NIOSH
    IC 8295 Coal Resources Of The Fabius-Flat Rock Area, Jackson County, Ala. (9b6f4437-fb1c-4e22-b378-d35c35869374)

    By Reynold Q. Shotts

    A study was made of the coal resources of an area in Jackson County, Ala., forming a part of the Flat Rock, Henegar, and Stevenson quadrangles. The area studied is a portion of the Plateau coalfield o

    Jan 1, 1966

  • AUSIMM
    A Statistical and Geological Review of the Zeehan Silver-Lead Mines, West Tasmania

    The Zeehan field has yielded over 190 000 tons of lead and 26,000,000 oz of silver. Moh of the production took place between the initial discovery of silver-lead ore in 1882 and 1920, and the greatest

    Jan 1, 1968

  • IOM3
    Horizontal drilling techniques in British coal mines

    By P. P. Jenkins, T. G. Ball

    Paper presented at the Drillex '90 conference held in London, 5 April 1990. Two drilling techniques are employed - guided longhole drilling and reverse circulation coring - for underground longhole ex

    Jan 1, 1991

  • SAIMM
    Geological Interpretations From The PGE Distribution In The Bushveld Merensky And UG2 Chromitite Reefs

    By R. G. Cawthorn

    The vertical distribution of platinum-group elements (PGE) in the Merensky and UG2 chromitite Reefs is highly variable, but does follow certain general patterns that allow the testing of geological mo

    Jan 1, 2011

  • SME
    An Evaluation Of The Strength Of Slender Pillars

    Pillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho

    Jan 1, 2006

  • SME
    IntelliMine - Innovative technologies and concepts for the sustainable and intelligent Deep Mine of the future

    By H. Hejny

    "The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only

    Jan 1, 2011

  • AUSIMM
    The Effect of Sulphide and Lead on the Rate of Cold Cyanidation

    By Tumilty JA, Schmidt CG

    Sulphide ion is a powerful poison in gold cyanidation, however, the detrimental effect is less severe in plant practice. This is thought to be due to the presence of depassivating elements in the o

    Jan 1, 1989

  • SME
    Concreting the Queens Tunnel, New York City Water Tunnel No.3

    By Edward M. Dowey

    The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring

    Jan 1, 2001

  • SME
    Current Ground Support Membrane Applications In North American Underground Mines

    By L. Lacerda

    Spray-on ground support membranes (GSM) or thin support liners hold today perhaps as much potential to impact underground (u/g) ground support operations as dry and later wet-mix shotcrete when introd

    Jan 1, 2002

  • NIOSH
    IC 8197 Methods And Costs Of Exploration And Pilot Plant Testing Of Ilmenite-Bearing Sands, Lakehurst Mine, The Glidden Co., Ocean County, N. J.

    By Richard Quirk

    This report describes methods and techniques employed by The Glidden Co. of Cleveland, Ohio, in explorating an ilmenite-bearing sand deposit in Ocean County, New Jersey, during 1960 to determine ore r

    Jan 1, 1963

  • SME
    Operation of large underground fans at Kidd Mine ? progressing through the challenges

    Kidd Mine in Northern Ontario is now producing from Stage 1 of the Mine D expansion project ? mining between 2100 m and 2700 m below surface. Planning for Stage 2 of the Mine D project is already well

    Jan 1, 2009

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015