Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Impacts of Longwall Mining on Groundwater SystemsBy Xinzhi (Thomas) Du
"A longwall mining method is a productive mining method of coal extraction that involves the complete removal of large, rectangular panels of coal. Since this method causes deformations through the ov
Jan 1, 2019
-
Analysis and Design of Faceroad Roof Support (ADFRS)By Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a longwall installation roadway (faceroad) design methodology that could be utilized
-
Collection and Classification of Hydrogeological Data for Planning and Conducting Grouting OperationsBy Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams
The effectiveness of the grouting of saturated, fractured rock in the vicinity of underground workings depends to a great extent on the correct interpretation of the specific hydrogeological condition
Jan 1, 1993
-
Preparation Of Oklahoma Metallurgical Coal Howe Mine Pilot PlantBy James Yancik
The Howe Coal Company located in Leflore County, Oklahoma is mining the Oklahoma Lower Hartshorne Coal bed which ranges in thickness from 38" to 42" and dips approximately 7 degrees to the Northeast.
Jan 1, 1969
-
Ergonomic Selection of Stemming Plugs for Quarry Blasting OperationBy M. Z. Emad, M. U. Khan, A. ur Rehman
Stemming plugs are used as an accessory in drilling and blasting industry. They supplement conventional stemming material (i.e. drill cutting) with retention of gases in the drill hole that result in
Jan 1, 2019
-
Meikle Mine Backfill System -A Case HistoryBy Lauren M. Roberts, Ralph R. Sacrison
The Meikle Mine uses long-hole open stoping and cut-and-fill methods with backfill as the primary ground support technique. The mine operates at 2,858 tonnes per day (3,150 tpd) and has sustained oper
Jan 1, 2001
-
Optimal Conditions for Treating Acid Mine Drainage by Bentonite-Steel Slag CompositesBy Wei Bin, Liu Zhe, Liping Xiao, Jichi Bai
The Acid Mine Drainage has characteristics of low pH, high concentrations of heavy metal ions, such as Fe2+, Mn2+, Cu2+ and Zn2+. In this paper, the composite particles that consisted of bentonite and
Jan 1, 2017
-
Options And Costs For C02 Reductions At Coal-Burning UtilitiesBy E. W. Hawk
he power generation industry may be required to reduce carbon dioxide (C02) emissions if regulations related to global climate change are enacted. Coal-fired generation emits more than 80% of the powe
Jan 1, 1999
-
Using passive treatment systems tor mine closure - a good approach or a risky alternative?By J. Wagner, P. Eger, G. Melchert
In 1991, LTV Steel Mining decided to close an open-pit taconite mine in northeastern Minnesota using a passive-treatment approach consisting of limiting infiltration into the stockpiles and wetland tr
Jan 1, 2000
-
Phosphate And Florida's EnvironmentBy R. S. Hearon
The image of the open-pit miner in the eyes or the Environmentalist has never been very outstanding. The phosphate industry, whose history in Florida reaches back to the late 1800's, can-not be c
Jan 1, 1978
-
Industrial Minerals 1989In 1989, United States mine production of barite decreased 13% while world mine production decreased by 8.6%, according to the US Bureau of Mines. Consumption, sold or used by grinding plants, decreas
Jan 1, 1990
-
In Situ Stress and Natural Fracture Distribution at Depth in the Piceance Basin, Colorado: Implications to Stimulation and Production of Low Permeability Gas Reservoirs.By Lawrence W. Teufel
Knowledge of in situ stress and natural fracture distribution at depth improves our ability to stimulate and produce low permeability reservoirs. The focus of this study is three closely spaced, 2.5 k
Jan 1, 1986
-
Blue Mining – Today’s Mine Planning for Future MinesBy Angela Binder, Oliver Langefeld
"The future of mining will be characterized not only by the application of modern technology, but also by the harmonization of economic, environmental and social issues. These areas set major future c
Jan 1, 2017
-
Mooranbah North - Striving for ImprovementBy Edmond O’Donovan
Mooranbah North is a new greenfield project in Australia's Bowen Basin that is projected to produce 4 mtpa of hard coking coal from a single longwall. Located in Central Queensland in Australia&a
Jan 1, 1998
-
Investment Opportunities In Industrial Minerals For Small- To Medium-Scale Operations In ChileBy Anibal Gajardo
Because of the Chilean Ministry of Mining's interest in the development of industrial minerals, the Chilean Geological and Mining Service (Servicio Nacional de Geología y Minería, SERNAGEOMIN) ha
Jan 1, 1999
-
Geological Evaluation Of Yatagan- Yenikoy (Mugla-Turkey) Marbles As Industrial CalciteBy Gürkan Bacak
Study area is located on the NorthWestern of Yatagan-Yenikoy and placed in the units of the crystaline Menderes massif of Eagen, Turkey. Stratigraphically gneissic, migmatitic and metagranitic rocks a
Jan 1, 2005
-
Application of Sustainability to CERCLA Remedy SelectionBy L. K. Holder
"The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), commonly known as Superfund, mandates evaluation of remediation alternative using nine criteria: (1) overall protec
Jan 1, 2015
-
Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur MineBy C. W. Nelson, A. G. Moody
This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110
Jan 1, 1994
-
Raise Borers Applied HorizontallyBy William T. Folwell
INTRODUCTION - CURRENT RAISE BORING PRACTICES Raise boring is a comparatively new tool to the underground mining and construction industries. Underground raise boring, in this country, had its begi
Jan 1, 1997
-
Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote
On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun
Jun 23, 2024