Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Reagent Interactions

    By William F. Riggs

    In the fresh application of a frother, collector, or the change of any particular reagent, the interaction caused by this change is often overlooked since we attempt to solve a problem or improve a si

    Jan 1, 1994

  • SME
    Cumulative Impacts of Environmental Regulations on the U.S. Mining Industry

    By Marshall A. Koval

    The future of mining in the United States is in question. The cumulative effects of federal, state and local environmental legislation threaten its survival as the cost of compliance skyrockets. Legis

    Jan 1, 1991

  • SME
    Simulation Of Heavy Medium Cyclone Performance

    By C. J. Barbee, P. J. Bethell, C. J. Wood

    Heavy medium cyclones (HMCs) are commonly used to clean run-of-mine coal in the 50 x 0.5 mm size range. Unfortunately, field studies suggest that industrial HMC circuits are often poorly designed or i

    Jan 1, 2004

  • SME
    Optimization Of Energy Utilization And Production Costs In Mining And Ore Preparation Processes

    By G. Chi, M. C. Fuerstenau, R. C. Bradt

    Reduction of the total energy expenditure in mining and ore preparation processes was achieved by redistribution of the energy from the crushing and grinding steps to the blasting operation. Reducing

    Jan 1, 1995

  • SME
    A Practical Procedure For Underground Development And Production Scheduling, Using A Microcomputer

    By D. Farahmand

    This paper focuses on formulating a practical procedure for forming long-range production and development schedules in underground mining. A computer program developed to be run on a microcomputer is

    Jan 1, 1986

  • SME
    Optimization Of Radon Daughter Measurement Techniques

    By Anthony Busigin, Stephen Pogorski, Colin R. Phillips

    The precision of radon daughter measurement techniques is a complicated function of uncertainties arising from concentration and flowrate fluctuations during sampling, counting statistics and many oth

    Jan 1, 1981

  • SME
    Importance Of Multiple Stress Measurements In Design Balsam Meadow Hydroelectric Project

    By Gregg E. Korbin, Patrick Hamilton

    INTRODUCTION The Balsam Meadow Project, presently under construction for the Southern California Edison Company, is located approximately 55 miles northeast of Fresno, in the Sierra Nevada Mountain

    Jan 1, 1987

  • SME
    Planning And Construction Of The Tohoku Shinkansen Ueno Shield Tunnel, Diameter Of 13M

    By Hisakazu Matsushita, Yoshio Yamaguchi

    INTRODUCTION Shinkansen, operating 1,176km between Tokyo and Hakata, transports 340,000 passengers a day. Presently, the 466km Tohoku Shinkansen linking Tokyo and Morioka and the 270km Jyoetsu Shin

    Jan 1, 1981

  • SME
    Impervious Tunnel Linings in a Land of Shakes

    By Chien-Tsun “C. T. ” Chu, Drupad B. Desai, Ron E. Redd

    The 12,710-m (41,720-ft) Riverside Badlands Tunnel is located between the most active faults—San Andreas and San Jacinto—in Southern California. To accomplish the impervious final lining design and t

    Jan 1, 1997

  • SME
    Contribution And Benefit Of EU-Thematic Network NESMI To Common Agreement On Sustainable Development In The Mining Industries

    By H. Schultheis

    The European Commission has launched in April 2002 the Thematic Network NESMI with-in the FP5 under Growth. NESMI stands for ?Network on European Sustainable Mining and Processing Industries? and will

    Jan 1, 2003

  • SME
    Design And Performance Of Curved Sag Mill Pulp Lifters

    By D. Royston, D. Denlay

    Pulp lifters are used to discharge ground pulp from non-overflow grinding mills. In straight-radial channel pulp lifters, discharge is often incomplete and back-flow down the pulp lifter can occur. Le

    Jan 1, 1999

  • SME
    The Cardiff Cable Tunnel

    By A. C. Lyons

    The presentation describes the history, preliminary report, site investigation, including examination of old records, design of tunnel including choice of levels, alternative linings and working sites

    Jan 1, 1981

  • SME
    Using Flotation to Separate Carbon Material From Carlin Ore

    By Kenneth N. Han

    The authors investigate the use of froth flotation to remove carbonaceous material from Carlin gold ore. They also study the effect of type and concentration of various oils as flotation collectors an

    Jan 1, 1990

  • SME
    Airborne Radiation Warning System

    By David M. Shaw, John C. Franklin

    A 32-channel warning system for high working level, fan operation, and airlock-doors has been constructed. The working level monitors have a microcomputer for accumulating the pulses, converting to wo

    Jan 1, 1981

  • SME
    A Systems Approach For Worker Needs Analysis In Training Program Development (ABSTRACT PAGE)

    By C. J. Bise

    Safety training requirements differ from mine to mine due to changes in the demographic characteristics of the workers or changes in job and organizational characteristics. Accordingly, a microcompute

    Jan 1, 1995

  • SME
    Structure, Alteration And Mineralization On The Flanks Of The Texas Canyon Stock Cochise County, Arizona

    By Joseph A. Kantor

    Several wall rock porphyry or pyrometascmatic copper deposits occur within the metamorphosed Paleozoic formations along the northern and eastern flanks of the Little Dragoon Mountains. Rocks ranging i

    Jan 1, 1977

  • SME
    MissionZero mine: Shaping the future of sustainable mineral processing - ME Feature Article

    By Lucy England

    The following is a summary of the Robert E. Murray Innovation Lecture on “Sustainable Copper Mining Flowsheets and the MissionZero Mine” presented as part of the keynote session on Feb. 23, 2026 durin

    Mar 1, 2026

  • SME
    Treatment of Refractory Ores – A Simplified Process

    By L. Lichty

    Treatment of refractory gold ores containing arsenic has always presented a major problem in their processing to recover the contained precious metal values. The major difficulties are concerned with

    Jan 1, 1990

  • SME
    Tunnel Excavation At The Bad Creek Project

    By Thomas H. Holley

    This presentation will describe the underground excavation at the Bad Creek Pump Storage project. It consists of approximately 3,650 m of various size tunnels ranging from 4.2 m to 9.0 m finished diam

    Jan 1, 1987

  • SME
    Environmental Revolution: Stage Two

    By John E. Tilton

    Looking back on the second half of the 20th century, future historians, I believe, will be fascinated by two major political upheavals. The first is the environmental revolution in the 1960s. It erupt

    Jan 1, 1994