Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Numerical Parametric Study of Floor Heave in Gate Roads Caused by Longwall-Induced Abutment Loading

    Floor heave events in underground mining often happen suddenly and cause risk to workers and equipment. Reducing the risk of floor heave must be addressed in mining layout design. To improve that desi

    Jan 7, 2020

  • SME
    An Innovation Of Practical Underground Stope Design Optimization And Cut-Off Grade Calculation

    An incremental analysis based stope design optimization method was developed at Exodus, an underground project located 30 miles north of Carlin, Nevada. Traditional underground stope design methods, b

    Jan 1, 2012

  • SME
    Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine Shaft

    By R. Thornton

    Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he

    Feb 27, 2013

  • SME
    Development Of An On-Line Coal Washability Analysis System Using X-Ray Computed Tomography

    By G. T. Adel, J. D. Miller, C. L. Lin

    Washability analysis determines the maximum separation efficiency that can be achieved in the operation of coal preparation plants. Unfortunately, there are no on-line techniques for determining this

    Jan 1, 2000

  • SME
    The As-Built Geotechnical Report: Its Use For Design Of Support For Three Rock Stations Washington, D.C. Metro

    By Carl G. Bock

    INTRODUCTION The Washington Metropolitan Area Transit Authority (WMATA) has let a contract for the excavation of three rock stations, spaced about 3550' (1082m) apart, beneath Connecticut Aven

    Jan 1, 1976

  • SME
    The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction

    By Faruk Oksuz

    The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a

    Jan 1, 2008

  • SME
    Productivity and Flexibility of Bucketwheel Excavators and Overland Conveyor Systems

    By H. Michael Breza

    Texasgulf Inc. installed bucketwheel excavators and overland conveyor sysems at its Aurora, NC phosphate mine o increase the productivity and flexibilty of the surface mining operation. This ;ystem ha

    Jan 1, 1993

  • SME
    Using Ultrasonic Anemometers To Evaluate Factors Affecting Face Ventilation Effectiveness (14afe39b-0e42-4a8b-a40b-25465eede38e)

    By Robert J. Timko, Charles D. Taylor, Edward D. Thimons, Tom Mal

    A test system was developed for measuring airflow in the National Institute for Occupational Safety and Health (NIOSH) ventilation gallery using a three-axis ultrasonic anemometer. The gallery was us

    Jan 1, 2005

  • SME
    Earthquake Response Of Caverns: Empirical Correlations And Numerical Modeling

    Tunnel damage from explosion and earthquake excitation is correlated with strain and particle motions. Critical strains and motions are then correlated with focal distance, which is so small that perm

    Jan 1, 1985

  • SME
    Tunneling In Residual Soil And Rock

    By Lee W. Abramson, Kenneth P. Akins

    The authors have accumulated published data on residual soil and rock tunnels in the United States and have compared it to transit tunneling experience in Atlanta, Georgia, and tunnels in other soil a

    Jan 1, 1983

  • SME
    Mechanisms Involved In Reactive Flotation Of Dolomite

    By A. El-Midany

    Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom

    Jan 1, 2009

  • SME
    Characterization And Contamination Assessment Of Mine Waste Piles And Sediment Materials In Gilpin County, Colorado

    By R. Abel, T. Wildeman, N. Heflin

    A study was conducted to assess environmental effects of waste rock piles on water in the Russell Gulch area. Each pile was rated on physical characteristics of proximity to an ephemeral gulch, extens

    Jan 1, 2004

  • SME
    Seismic Design Measures for the Retrofit of the Claremont Tunnel

    By Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer

    In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b

    Jan 1, 2005

  • SME
    A New Diatomite Resource In Egypt

    By M. I. Al-Wakeel

    Nile sediment was collected as a waste from one of the water treatment plants in Cairo, and subjected to petrographical investigation and granulometric, chemical, and mineralogical analyses. It was ex

    Jan 1, 2008

  • SME
    Siemens Controllers Aid Processing at the Madero Project

    By Rolando Gonzalez

    Mexico’s role in the world economic community continues to grow. And it is important that the country makes use of its natural wealth, including its large underground deposits of minerals and metals.

    Jan 1, 2003

  • SME
    Imaging Of Minerals, Ores And Related Products To Determine Mineral Characteristics (62b10345-9d28-4191-957f-3c363fe80798)

    By W. Petruk

    Imaging is a fundamental requirement when characterizing minerals, ores and related products. Images are used for presentation, texture analysis, characterization, image analysis, identification, etc

    Jan 1, 2001

  • SME
    Dust Control for Coal Handling : Design Considerations and Solutions

    By Henning E. Soderberg, Robert Brien, O&apos

    Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d

    Jan 10, 1981

  • SME
    Tonnage Factor – A Matter of Some Gravity

    By I. S. Parrish

    One of the most common errors uncovered while performing a reserve, or resource, audit is not in the geological modeling or grade problems due to poor sampling, prepartion or assaying. The error most

    Jan 1, 1993

  • SME
    Estimating Excavator Teeth Consumption Rates - Preprint 09-021

    By C. J. Roos

    Ground engaging tools are used to prevent damage to the main components of earth-moving equipment. These tools consist of everything from shovel teeth to replaceable drill bits to dozer wear plates. T

    Jan 1, 2009

  • SME
    Technical Innovations And Advances Make Wirtgen Surface Miner A Viable Alternative To Traditional Drill And Blast / Ripping Operations

    By R. Bauer

    Adaptations and redesign of the existing already very successful and proven road milling machine concept and technical innovations such as an optimized, specifically for mining application developed c

    Jan 1, 2007