Increasing Capacities By Retrofitting Mist EliminatorsBy S. A. Ziebold
There is often a need to increase capacity through existing mist eliminator installations without significant tower modifications. Often there is not enough extra space outside existing vessels unless
Jan 1, 2007
-
The use of Information Technology in the Mineral Resource Management environmentBy J. van Zyl Visser
The advancement in Information Technology has resulted in a change in workflow practice in our Mineral Resource Management (MRM) offices on the mines and at our corporate office. This paper discusses
Jan 1, 2003
-
Evaluation of the LCPC test for geometallurgical applications: Sossego Mine case study, P. de A. Barbosa, M.G. Bergerman, and E. da FonsecaBy P. de A. Barbosa, M. G. Bergerman, E. da Fonseca
Located in the state of Pará, Brazil, the Sossego copper and gold mine consists of a heterogeneous geological deposit. Its complexity derives from the hydrothermal alteration, the ore-forming event, w
Jan 1, 2020
-
A review of readiness assessments for mining projectsBy H. Mulder, M. C. Bekker
The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and
Jul 2, 2022
-
An integrated and sustainable solution to ensure in-section dust compliance - SynopsisBy N. F. Mashinini
Optimization of current control systems, proper maintenance and efficient training of personnel are recommendations made to control the amount of dust that underground employees are exposed to on a da
Jan 1, 2008
-
Prediction Of Slope Failure At Letlhakane Mine With The Geomos Slope Monitoring SystemBy George Kayesa
[ ] A multiple-bench slope failure occurred at Letlhakane mine on 14th July 2005. No injuries or damage to equipment was suffered and mining production was not affected. Slope failure was precede
Jan 1, 2006
-
Integration Of A Waste Fill System Into A Longwall Gold MineBy A. S. Macfarlane
Western Deep Levels (North) is a deeplevel, longwall gold mine. Severe strata control problems and high rates of elastic closure, resulting in high rates of energy release, are associated with mining
Jan 1, 1988
-
HPGR?FAQ - SynopsisThe successful commissioning of the Cerro Verde project in Peru at the end of 2006 marked the culmination of the efforts of many in the industry over many years to have high pressure grinding roll tec
Jan 1, 2010
-
Nonlinear rock behaviour and its implications for deeper level platinum mining - SynopsisBy B. P. Watson
Uniaxial tests performed on core from instrumented sites at Amandelbult 1 shaft, Impala 10 shaft and Union Section Spud shaft showed a nonlinear elastic relationship between applied load and induced d
Jan 1, 2009
-
Friction Processing as an Alternative Joining Technology for the Nuclear IndustryBy von Wielligh. L., D. G. Hattingh, M. N. James, W. Thomas
"SynopsisThe process of joining materials by friction is based on generating the heat necessary to create a solid-state mechanical bond between two faying surfaces to be joined. In simple terms, the c
Jan 1, 2015
-
Full-waveform automatic location of small seismic events in an underground mine using synthetic strain Green’s tensorsBy S. Moolla, R. Lynch, S. Brijraj
A reliable method to locate microseismic evets is an important objective for routine mine seismic monitoring. We developed an algorithm that can automatically and reliably locate an event from a singl
Jun 10, 2024
-
Advanced process control for coal flotation: a case study of the approach and benefits of a structured digitalisation program APCOM 2021By T. Bohmer, L. Auret, N. Pillay, Z. Horn, P. Rambalee, A. Haasbroek
As part of a broader digital technology-enabled transformation programme, a major mining company is systematically implementing Advanced Process Control (APC) solutions and associated instrumentation
Sep 1, 2021
-
Proceedings April General MeetingThe April General Meeting of the Institute was held in Kelvin House, Johannesburg, on 15th April, 1970, at 4.30 p.m. Mr J. K. E. Douglas (President) was in the chair. There were also present ei
-
The progression of metallurgical testwork during heap leach designThe depletion of favourably located and higher-grade mineral deposits, combined with more favourable metal prices and higher capital costs, has stimulated research into heap leaching of lower grade or
Jan 1, 2009
-
Preconcentration Of UG2 Platinum Ore: Economic Benefits - SynopsisBy F. Smit
Mining and plant practices can benefit from preconcentration of UG2 platinum ores in a dense medium separation (DMS) plant. The main benefit of DMS is the selective discard of waste from the feed stre
Jan 1, 2013
-
A three-dimensional tessellation boundary element method for simulation of fracture zone around openingsBy K. -J. Shou
A special three-dimensional boundary element method has been developed for the simulation of the development of fracture zone in rock mass. This approach comprises a boundary element method and a thre
Jan 1, 2003
-
"Decomposition Of Metal Sulfates - A SO2 -Source For Sulfuric Acid Production" - Abstract and IntroductionThe peak in Sulphur price late 2008 caused again intensified investigation into the decomposition of sulphates and spend acid. One option is the recycling of sulphur from spend acid, which already sta
Jan 1, 2009
-
Author's Reply to DiscussionBy D. G. Krige
D. G. Krige: The stimulating contributions from Messrs Cooke, Curtis, Martus, Johnston, Van Wyk, Van Rensburg and Wroth are appreciated by the author and provide clear evidence of the importance not o
-
Keynote Address: Sampling mineral commodities?the good, the bad and the uglyA wide range of drill holes and process streams are sampled for resource estimation, grade control and contractual purposes in the minerals industry. However, despite the availability of training cour
Jan 1, 2009
-
Pragmatism in industrial modelling: An application to ladle lifetime in the steel industryBy S. T. Johansen, B. T. Løvfall, T. Rodriguez Duran, J. Zoric
A methodology for building pragmatic physics-based models is here adapted to predict the erosion of ladle linings in the steel industry, in order to support operators when deciding whether the lining
Apr 16, 2024