Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity

    By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang

    A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr

    Feb 1, 2020

  • ISEE
    Optimized Blast Design Through Drone Surveying and 3D Geological Modeling to Solve Highwall Stability Problems

    By Matt Brandon

    This case study demonstrates how integrating drone and GPS surveying with 3D modeling software creates more effective blast designs that address specific geotechnical challenges while improving safety

    Jan 26, 2026

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • ISEE
    Electronic Initiation Applications at Barrick Goldstrike's Meikle Mine

    By Ray Slavin, Remi Proulx

    The Meikle Mine is a mature underground gold mine utilizing primary and secondary longhole open stoping method with delayed backfill. Combined production with the newly developed Rodeo Mine is 4700 to

    Jan 1, 2004

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    The Utilization of 100 % Waste Oil Content on Himex70 Product at Petrosea Pit, PT Kideco Jaya Agung

    By Raden Haris Handayana, Jerri Mapanta, Eri Barlian, Milia Putri, Nasfryzal Carlo, Jihan Lubis

    Waste oil is a growing problem throughout industries where environmentally responsible disposal ways are usually costly. There are many industries have developed process to reuse of waste oil as a sou

    Feb 6, 2023

  • ISEE
    Dynamic Pressure Study to Minimize Misfires at Pueblo Viejo Mine

    By Alejandro Rosario, Ricardo Dumuihual, Guillermo Silva, be nito Danial Valde, Carlos Scherpenisse

    A monitoring campaign to record dynamic pressures generated by detonation of a single blasthole was implemented at Barrick Gold´s Pueblo Viejo Open Pit mine (PVDC), located in the Dominican Republic.

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    Integrating Rock Impedance and Blast Design: A Mode-Based Approach to Fragmentation Efficiency and Nox control

    By Francisca Tapia, Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Manriquez, Luis Martínez, Juan Navarro

    Efficient energy transmission is critical for effective rock fragmentation in open-pit blasting. However, in zones with highly fractured or soft rock, mismatches in acoustic impedance between the expl

    Jan 26, 2026

  • ISEE
    Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.

    By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye

    The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial

    Jan 21, 2025

  • ISEE
    Oversize Reduction Project at the Iron Ore Company of Canada (Full Article)

    By Rodney Pinksen, Remi Proulx

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • ISEE
    "Optimized Energy Distribution in Bench Blasting Through Measurement Techniquesand “Multi Energy” Explosives"

    By Pierre De Pasquale, Gilles Jauffret, Ricardo Chavez

    "When blasting in quarries or mines, the main source of inconsistent results is directly related to thenon-homogeneous energy distribution through the rock-mass volume. This variation has differentori

    Jan 1, 2016

  • ISEE
    Peculiarities of Drilling and Blasting in Underground Small-Scale Mines

    By Patricio González Santis, Jacopo Seccatore

    This paper documents drilling and blasting activities from gold mining in Ecuador and Chile. First, are described the outdated and often non-rational techniques employed by miners, to provide a genera

    Feb 1, 2020

  • ISEE
    Safeguarding Historic Underground World War II Structures from Surface Quarry Blasting – a Case Study

    By Shazad Hosein, William J. Birch, Robert Farnfield, David Jameson, Catherine E. Johnson

    The current and consented quarry workings at a slate quarry in North Wales {UK} intersect old long abandoned underground slate mine workings. The old underground slate mine contains the remains of Wor

    Jan 21, 2025

  • ISEE
    Vibration Effects of Coal Pit Blasts on Tower Pithead Concrete Structures

    By Mark Svinkin

    To save time for construction of coal pits, the contractor decided to combine erection of the tower pitheads with digging of skip shafts to the depth necessary for placing proper coal pit equipment. I

    Jan 1, 2004

  • ISEE
    Full Wall Control Blasting Optimization

    By John Floyd, Maria Rocha, Benjamin Cebrian

    Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,

    Jan 1, 2018

  • ISEE
    Budget Model Data of Drill and Blast Tunnelling in Brazil

    By Pedro C. Carneiro, Luiz G. I. Maciel

    "This article presents data of advance and excavation rates in tunnelling works, and how theseactivities interact with the duration and cost of a contract. These key parameters, after analysis andsynt

    Jan 1, 2016

  • ISEE
    Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well

    Feb 1, 2020

  • ISEE
    Preconditioning Modeling and Interaction with Explosives in Block Caving

    By Ismael Gottreux Vollet, Carlos A. Muñoz Lira, Alejandro Ferrada Vergara

    Currently, underground mining of deeper massive deposits with lower grades, harder rock conditions in high strength environments, entails difficulties in caving, fragmentation and seismicity of the or

    Jan 1, 2016