Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Soil Displacement Caused By Pile Driving In ClayBy K. Rainer Massarsch
The effects of soil displacement caused by pile driving on adjacent piles and structures are discussed. A method is proposed to estimate the point of force equilibrium which makes it possible to calcu
Jan 1, 1989
-
Pile Integrity Testing In The NetherlandsBy Peter Middendorp
Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int
Jan 1, 2006
-
Drilling And Dewatering In An Urban Environmentprivate - Project Description And LocationBy Joel Moskowitz
In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M
Jan 1, 1996
-
Technical Note - Simplified Settlement Model For A Shallow Foundation On Composite Ground With Rigid PilesBy Timothy C. Siegel
A piled raft refers to a shallow foundation that is structurally connected to the piles, while composite ground refers to a soil-pile matrix where the piles are not structurally connected. The design
Jan 1, 2011
-
Application Of CFA Piles For Foundation Of A Shopping Centre On Long-Standing Dumping GroundBy Joanna Bzówka
Nowadays, there are some new requirements for the supermarket floors. The floors are loaded by high point- and moving-loads. In spite of this fact, it is necessary to ensure the stiffness of the floor
Jan 1, 2006
-
A Review Of Diaphragm Wall Construction-White Swan Hotel ? SynopsisBy Q. M. Huang
In 1979 our company undertook the project of infra-structural work of White Swan Lake Hotel, (International class ) Guangzhou. Visit to the site showed that it was situated at the riverside, covering
Jan 1, 2010
-
Real Time Validation of Driven Cast In-Situ PilesBy Derek Egan
"Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid
Jan 1, 2014
-
Apportioning Risks On An Urban Deep Foundation ProjectBy Michael P. Balducci
Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr
Jan 1, 2008
-
Wave Equation Technique For Estimating Driven Pile CapacityBy Luo Yang
A one-dimensional wave equation based algorithm for estimation of shaft and toe resistance of driven piles using High Strain Testing (HST) data is presented. The pile is represented by a uniform elast
Jan 1, 2006
-
Design Of Deep Foundations Over Shallow Mine WorkingsBy Tianfei Liao
Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they
Jan 1, 2009
-
Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded ShaftsBy Cheng Lin
The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a
Jan 1, 2009
-
Improving Very Compressible Soils By Stone Columns And Stiffening Concrete Columns ? SynopsisBy I. Stanculescu
The consolidation of thick and very compressible soil deposits by stone columns associated with cast-in-place plain concrete columns, has been performed for shallow foundations of some heavy industria
Jan 1, 2010
-
Response Of A Pile In Soft Clay Under One-Way Cyclic Lateral LoadingBy Padmavathi V. Sagi
In this paper, effect of cyclic loading on the behavior of a long, flexible, unrestrained vertical pile loaded laterally in soft clay is examined. For cyclic loading, the analysis is carried out usin
Jan 1, 2006
-
Horizontal Resistance Behavior Of Pile With Wings In SandBy Wen Songlin
This paper presents an experimental program to investigate the behavior of a pile with wings under horizontal loads in sand at laboratory. The work focused on evaluating the lateral resistance behavio
Jan 1, 2007
-
Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.By Peter O. Wilkinson
Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a
Jan 1, 2006
-
Load Test Analysis On Augered Pressure Grouted Displacement PilesBy Wei Zheng
A pulverized coal fired power plant is being built in Osceola, Arkansas, along the Mississippi River. The subsurface soil conditions consist of a certain amount of very soft clayey silt and clay under
Jan 1, 2007
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid (cdc8479e-b761-4427-8d26-4088be3d5ab5)By Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998By David A. Jack
The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa
Jan 1, 1998
-
Ground Improvement Design and Construction for Seattle’s Elliott Bay Seawall Replacement and RetrofitBy Andrew Malinak, William Perkins
Seattle’s Elliott Bay Seawall protects the 1½ miles of downtown waterfront between South Washington and Broad streets. The seawall supports the urban waterfront and infrastructure, including the Alask
Jan 1, 2018
-
Collaborative Alliances – A Sustainable Way Forward For Construction?By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014