Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load TestsBy Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Getting Paid In Hard Times - I. Formation Of The ContractBy Dennis J. Riley
A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter
Jan 1, 1991
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
Press-In Piling Technology For Sustainable ConstructionBy Philip Dubbeling
Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes
Jan 1, 2006
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USABy P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
World Financial Center Foundations, New YorkBy G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?By G. G. Goble
Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese
Jan 1, 1993
-
Instrumentation And Interpretation ? IntroductionBy H. Mori
The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content
Jan 1, 1991
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 BroadwayBy Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000
-
I-470 Mine RemediationBy Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
Evaluation Of Design Methods For Tieback Retaining Walls In Seattle - IntroductionBy John P. Turner
The behavior of tieback retaining walls depends on many factors, including soil properties, groundwater conditions, construction sequence, spacing and stiffness of tiebacks and soldier piles, tieback
Jan 1, 1990
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
-
Experiences With Heavy Drop Hammer Testing Of Rock-Socketed ShaftsBy Frank Rausche
Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust
Jan 1, 2006
-
Case Histories Of Geo-Column? Foundations - SynopsisBy Osamu Taki
This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl
Jan 1, 2000
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone GroundBy Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Characteristics And Application Of Soil Reinforcement By Jet Grouting ? SynopsisBy J. W. Wang
This article first explains the mechanism of forming strength in the Jet grouting reinforced foundation, and points out the function of cement hydrates and clay minerals in clayey soil, the reinforced
Jan 1, 2010
-
Creative Shoring Solutions For A Tight Urban SiteBy David G. Winter
The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s
Jan 1, 2009
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999