    Enhancements To The FHWA Deep Foundation Load Test Database

    By Carl D. Ealy

    Work is being done to web enable the FHWA Deep foundation Load Test Database. Originally designed to function in the client server environment via modem, access to the database both for data maintenan

    Jan 1, 2002

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
    Ultimate Uplift Capacity Of Single And Group Piles In Clay ? Synopsis

    By B. M. Das

    Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes

    Jan 1, 2010

  • DFI
    Cofferdam Failures ? Introduction

    By Richard J. Hartman

    This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p

    Jan 1, 1987

  • DFI
    High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - Summary

    By Robert C. Rabeler

    Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to

    Jan 1, 1999

  • DFI
    An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The Problem

    By M. Zanotto

    [ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole

    Jan 1, 1992

  • DFI
    Bearing Capacity And Slope Instability Solved By Novel Ground Engineering Solutions

    By T. J. Snell

    Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes

    Jan 1, 2006

  • DFI
    A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? Summary

    By Michael D. Justason

    This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola

    Jan 1, 1997

  • DFI
    Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge Abutment

    By Samer R. Rabab?ah

    As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)

    Jan 1, 2011

  • DFI
    Volume Averaging Technique for Modelling Deformations in Soft Soil Improved with Deep Mixed Columns

    By Minna Karstunen, Patrick Becker

    "Abstract The deformation behaviour of a foundation on deep mixed columns in a natural soft soil is a three-dimensional problem, which has to be considered adequately in numerical modelling. However,

    Jan 1, 2014

  • DFI
    Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, Pennsylvania

    By Brian H. Greene

    The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo

    Jan 1, 2006

  • DFI
    Challenges And Uncertainties Relating To Open Caissons

    By Fathi Abdrabbo

    Open caissons are used for many geotechnical engineering applications. Open caissons may be used as deep foundation elements bypassing weak soils to tip in firm deeper strata, and in rivers and mariti

    Jan 1, 2012

  • DFI
    Static Load Transfer Computation Of Piles

    By Pan Shisheng

    Amodified load transfer method computing the displacement, axial compression, skin resistance, toe resistance, and other static bearing behaviours of piles, is propoesd in this paper. Through deriving

    Jan 1, 1991

  • DFI
    Aspects of Standardization for Piles in Europe

    By Roger Frank

    "Abstract After noting the importance of standardization for piles, the European system is described (execution, tests and design, etc.). Some important aspects of Eurocode 7 are outlined (like the ro

    Jan 1, 2014

  • DFI
    Modulus of Elasticity in Deep Bored Piles

    By Carlos Lam, Joram M. Amir, Erez I. Amir

    "Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta

    Jan 1, 2014

  • DFI
    The Effects Of Changes In Effective Stress On A Base Grouted Pile In Sand

    By V. M. Troughton

    Large diameter bored piles with grouted bases have been adopted for the foundations of the majority of the buildings at Canary Wharf in London's Docklands, including a deep basement car park. The

    Jan 1, 1989

  • DFI
    Assessment Of The Risk Of Pile Driving To Juvenile Fish - The Problem

    By James J. Anderson

    In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th

    Jan 1, 1990

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994