Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Underpass Support Using Secant Pile Walls And Cement Deep Soil Mix Bottom SealBy Carole L. B. Mitchell
The South 180th Street Grade Separation underpass in Tukwila and Renton, Washington, USA, permits vehicular traffic to pass beneath Burlington Northern Santa Fe and Union Pacific railroad tracks. The
Jan 1, 2004
-
Pile Load Test Results For Highway 280 Pile Uplift Test SiteBy Douglas Brittsan
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar
Jan 1, 1993
-
Design And Performance Evaluation Of Bored Piles In SandBy Ashutosh S. Dhar
Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in
Jan 1, 2006
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future. (6f8f1933-2bde-4a96-8f8f-131aa6e7971f)By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
Winter Marine Construction In Northern Alberta - Construction Of Baffle Walls Sundance Cooling Pond Expansion Sundance Generating Plant Wabamun, Alberta, Canada ? IntroductionBy Robert R. Morrison
Alberta Piling Contractors very rarely are required to perform major marine construction in the prairies, so it became as a big surprise to AGRA Foundations Limited to be invited by Transalta Utilitie
Jan 1, 1997
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
Defective Piles In Clay - SynopsisBy S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall PanelsThere are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26By E. C. Demsky
This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret
Jan 1, 1989
-
Capacity Of Slender Steel PilesBy J. Wennerstrand
Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to
Jan 1, 1989
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Deep Mixing Technologies for Lateral Support SystemsBy W. Sondermann
"AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t
Jan 1, 2014
-
Reinforcement Project For The Shopping Centre "Grand Littoral" In MarseillesBy J. -M. Rescoussier
Due to Important settlements inducing major structural damages, the western part of the Grand Littoral shopping centre has been closed in 1997. The present paper describes the project of underpinnin
Jan 1, 2002
-
Analysis Of Driving Stress Measured In The RC Long PileBy Yu Zhenquan
At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa
Jan 1, 1991
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And CommunicationBy Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution
Jan 1, 1994
-
New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)By R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2004
-
Skilled Operative Training For The Foundation Industry - SummaryBy Geoffrey Birch
A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski
Jan 1, 2000
-
Technical Aspects And Research In DowndragBy Jean-Louis Briaud
The following is a summary of a very recent report prepared at Texas A&M University for the National Cooperative Highway Research Program and entitled "Downdrag on Bitumen Coated Piles". Anytime the
Jan 1, 1989
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995