  • DFI
    Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey Soil

    By Murad Y. Abu-Farsakh

    This paper presents the analyses of load-transfer (t-z) behavior of twelve prestressed concrete (PSC) instrumented test piles that were driven in different locations of Louisiana. The load transfer me

    Jan 1, 2018

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • DFI
    The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power Station

    By H. F. Cowie

    Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of

    Jan 1, 1989

  • DFI
    Improved Pile Economics: High Design Stresses And Remote Pile Testing

    By Jim Frazier

    Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations

    Jan 1, 2002

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Shoring And Caissons At The Air Canada Centre/Raptors Stadium

    By Dawn C. Tattle

    [ ] Panoramic View of Completed Facade Supports The following case history describes the installation of earth retention systems, historical facade supports and structural caissons by Anchor Shor

    Jan 1, 1997

  • DFI
    Geotechnical Exploration Phase Drilled Shaft Load Testing

    By Walter E. Vanderpool

    Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and

    Jan 1, 2011

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Recycling Jet Grout Backflow: Waste Mitigation and Cost Benefits

    By Craig T. Jones, Zachary Q. Maassen

    "Jet grouting is a method of ground improvement that relies on the erosive capacity of high-speed jets to cut and mix the ground in place with a cementitious grout. A continuous return flow of cutting

    Jan 1, 2017

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft Construction

    By C. Vipulanandan

    It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas

  • DFI
    Design Of Cooper River Bridge Foundations

    By Osama Safaqah

    The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town

    Jan 1, 2005

  • DFI
    Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing Methods

    By Juan M. Antorena

    A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a

    Jan 1, 1995

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004

  • DFI
    CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement

    By Fabrice Mathieu

    The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi

    Jan 1, 2006

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup Effects

    By Mohammadreza Khanmohammadi, Kazem Fakharian

    "AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise