Geotechnical Monitoring Of Deep Shoring Adjacent To Train InfrastructureBy Jakub Szary
Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel
Sep 1, 2022
-
Blast Densification Of Fine TailingsBy Brian W. Wilson
A case study is presented that describes the design and implementation of a combined blast densification and deep dynamic compaction program which was undertaken to improve the foundation soils for a
Jan 1, 2010
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022
-
Founded on Creativity North Dakota’s Four Bears BridgeBy Terrence R. Udland, Russell D. Call
"Honored with a DFI 2006 Special Recognition Award, the Four Bears Bridge was constructed across Lake Sakakawea and opened to traffi c in September 2005. The very large lake size and severe winter con
Jan 1, 2007
-
A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile DrivingBy H. R. Masoumi
This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative
Jan 1, 2006
-
Alignment Control Of Drilling Rods For Jet Grouting By Integrated MicrochipsBy Mousaab Majar, Nikolaus Schneider
The technical challenges for accurate drilling positions increase with deep underground structures in inner city areas. Designed for jet grouting, specific sensors have been developed to record the al
May 1, 2022
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead SeaBy Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat
The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan
May 1, 2022
-
Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, MissouriBy Adrian M. Keller
Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer
Jan 1, 2010
-
Micropiles Take Off at Dulles AirportBy Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data CollectorsBy Donald T. Robertson
This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
Numerical Analysis Of The Osterberg Cell Loading TestBy Brunella Recinto
Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large
Jan 1, 2003
-
Axial Pile Response Evaluation By Geophysical Piezocone TestsBy Paul W. Mayne
The axial load-displacement-capacity and load-transfer response of deep foundations can be conveniently assessed by geophysical piezocone tests that provide four independent readings with depth, inclu
Jan 1, 2002
-
The Miniaturization Of Diaphragm Wall Technique – The Cube SystemBy Leonhard Weixler, Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep ground-water barriers, named Cut-Off
Oct 1, 2022
-
Hammer-Grout Piles At The Bronx-Whitestone BridgeBy Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
Engineering Practice Of Ground Improvement ? IntroductionBy H. R. Taber
The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North
Jan 1, 2010
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t