Applying The Carbon Hierarchy To Geotechnical ContractorsBy J. E. De Waele, J. J. Lee, M. J. Mulheron, Luke R. Deamer
There is increasing demand for geotechnical contractors to commit to carbon reduction, net zero or science based targets. A lot of focus has therefore been placed on using low carbon materials and low
May 1, 2022
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative SolutionBy Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile FoundationsBy Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
A Summary of Load Test Results on Large Diameter Open-Ended Pipe Piles in MinnesotaBy Rich A. Lamb, Paul J. Axtell, Michael K. Muchard
"Since 2010, the Minnesota Department of Transportation (MnDOT) has performed eight full-scale compressive load tests on large-diameter pipe piles at four different project locations across the state.
Jan 1, 2017
-
The Potential Impacts Of Questionable Instrumenation DataBy Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Innovative Crosshole Sonic Logging Testing Drilled ShaftsBy Joshua C. Adams, Les Chernauskas, Edward L. Hajduk
"Drilled shafts are increasingly being used to support bridge and building foundations. Because these foundations usually carry very high design loads and often serve as non-redundant, single load car
Jan 1, 2009
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
Load Distribution for Underpinning System Using Inherent Rigidity of Concrete DamBy Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker
The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier
Sep 8, 2021
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Soil-Mix-Sandwich (SMS)By Ali S. Fayad
"In June 2014, Orange County Flood Control District (OCFCD) completed construction improvements of the East Garden Grove-Wintersburg Channel for a price of $42 million. Instead of the pre-existing tra
Jan 1, 2015
-
Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support ColumnsBy Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury
"The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb
Jan 1, 2016
-
Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case StudiesBy Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste
Jan 1, 2017
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, TurkeyBy Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased