Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Environmentally Friendly Geothermal Piles At Keble College, Oxford, UKBy Tony P. Suckling
This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct
Jan 1, 2002
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Influence of Surface Replacement Layer on Behavior of Laterally Loaded Large Bored Piles in Soft Clay: Pile Load Tests and Numerical InvestigationBy Hayel M. El-Naggar, Mohamed Sobhi, Mamdouh M. Hamza, Marawan M. Shahien
"This paper presents the results of two lateral load tests on large bored piles in soft clay deposit for a major site in northern Egypt. The tests are carried out on 0.8 m diameter piles. One of the t
Jan 1, 2016
-
Estimating Kinematic Demands From Lateral Ground Deformations On Pile-Supported WharvesBy Arash Khosravifar Ph. D. P. E., Thomas Torkelson P. E., Milad Souri Ph. D. P. E.
Kinematic demands from lateral ground deformations can be a major cause of damage to maritime and highway transportation structures such as wharves, piers, and bridges. These kinematic demands are dif
Oct 1, 2022
-
A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Dyna Force Sensors for Monitoring of Tension/Compression Forces in Ground Anchors & PilesBy Shahid Islam, Lucian Bogdan
"The maintenance of infrastructures has been of particular concern to the engineering community. As the world’s infrastructure expands and existing infrastructure ages, monitoring and evaluation of th
Jan 1, 2017
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case HistoryBy Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet
"Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat
Jan 1, 2016
-
Optimizing Large Diameter Concrete Piles in Tidewater VirginiaBy Michael G. Batten, Brian D. Keaney
]The Virginia Department of Transportation (VDOT) and the harbors on the James River routinely use precast concrete piles founded in the Yorktown formation to support bridges and other coastal structu
Sep 8, 2021
-
The Micropile Network: Practice Precedes TheoryBy Gary M. Weinstein
Micropiles have seen increasing use for foundation support and slope stabilization applications over the past half century. Most often designed and installed in groups of vertical or battered elements
Jan 1, 2003
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008
-
Load Tests Of Bored Piles In Weathered BedrockBy James C. Scott
Compression and tension load testing were performed on bored concrete piles installed to depths of 18 to 34 meters below excavation levels for a large mixed-use development in Kuala Lumpur, Malaysia.
Jan 1, 2007
-
Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)By Frank Rausche
The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender
Jan 1, 2001
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Application of Triple-Axial CDM Method (Lemni 2/3 Method) for Stabilizing Soft SoilBy Kazuyoshi Kamimura, Masaya Kawata
"It has been 30 years since the cement deep mixing (CDM) method developed in Japan. CDM method has been applied to many structures. While various technical improvements have been implemented in the me
Jan 1, 2015
-
Brickworks Marketplace Ground Improvement, AdelaideBy Andrew Middleton, Mark Wyatt
"The Brickworks Marketplace Project is a significant shopping centre development in inner north west Adelaide constructed by Badge Constructions in 2014 and 2015. The site was a former brickworks with
Jan 1, 1900
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021