Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, VictoriaBy Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan
The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an
Nov 1, 2022
-
Jet Grouting for Strength in Marine Sediments with HydrocarbonsBy Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest
Jan 1, 2019
-
Alternative Analytical Methods for Borehole Permeability Tests in Seepage Barrier WallsBy R. Lee Wooten, David R. Shields, Darren D. Clark
"Borehole permeability tests that measure flow or head changes in boreholes located within seepage barrier walls are commonly used to estimate the in situ permeabilities of those walls for quality con
Jan 1, 2016
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
A Geotechnical Data Base Development And Applying Data Mining Techniques To Extract The Common Trendes Of Offshore Geotechnical Properties Of South Pars Gas Field/ Persian Gulf IR-IranBy H. Shiri
Iran's largest natural gas field is South Pars, geologically an extension of Qatar's 900-Tcf North Field. South Pars was first identified in 1988 and originally appraised at 128 Tcf in the e
Jan 1, 2006
-
Improvement Of Bearing Capacity Of Bored Piles By Grouting MethodBy Andrzej Tejchman
A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham
Jan 1, 2002
-
Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South AmericaBy Daniel Magill, Jim Gentry
"Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
Jan 1, 2017
-
Deep Compaction Using Vibratory Pile HammersBy Dennis Nottingham
The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer
Jan 1, 2013
-
Selection And Design Of Continuous Flight Auger And Drilled Displacement PilesBy Dan Brown
This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary
Jan 1, 2005
-
Dynamic Centrifuge Model Tests on Pile-Type Deep Mixing Method Reducing Lateral Flow of Liquefied GroundBy Tsuda Wakaki, Naoki Takahashi, Natsuki Okuno, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"Deep mixing (DM) method has been increasingly employed as a countermeasure against subsoil liquefaction in recent years. Pile-type DM, however, is considered to have little effect as a liquefaction c
Jan 1, 2015
-
Fogg Museum Expansion - Support of Excavation Design and ConstructionBy James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line RepairBy Richard Brink, Eric M. Klein, Kenneth B. Andromalos
"A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid
Jan 1, 2005
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Strength and Deformations of Piles Supporting Transient Pipe Anchors in Heavy Industrial PipelinesBy Konstantin G. Ashkinadze
The paper considers performance of piles supporting transient pipe anchors in heavy industrial pipelines. Events such as pump trips or opening and closing of large valves produce short-term dynamic pu
Jan 1, 2016
-
Jet Grouted Foundation for 57-Story TowerBy Robert Alperstein, Nidal AbiSaab, Joe Pastore
"This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit
Jan 1, 2016
-
Framework for Risk-Based Electric System Deep Foundation DesignBy Steve Davidow, Ashely E. Evans, Peter M. Kandaris
"Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation
Jan 1, 2017
-
Port Said East Port Project - Deep Diaphragm Walls For The Quay Wall ConstructionBy Mamdouh Hamza
The construction of 1200 m length new quay wall located 1,300 m East of the existing Suez Canal bypass and about 1,000 m south of the Mediterranean shoreline is one of the main projects currently unde
Jan 1, 2002
-
Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce
"In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa
Jan 1, 2015
-
Drilled Pier Foundations for Mercedes-Benz StadiumBy Jean Wehbe, Daniel C. Brahana
"The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece
Jan 1, 2016