Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Iron Sulfide Minerals in Thiosulfate-Gold Leaching: Some Problems and Solutions

    The negative effects of pyrite and pyrrhotite on thiosulfate gold leaching have been investigated. Possible remedies to reduce some problems are discussed. In a gold bearing pure silicate ore, 92% of

    Jan 1, 2005

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • CIM
    Pilot Plant Development Studies on Mount Laurier, Canada, Graphite Deposit

    By V. Lakshmanan, Dan Mackie, J. Melnbardis

    "Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid

    Jan 1, 1984

  • CIM
    Gravity Recoverable Gold and the Mineral Liberation Analyser

    By Philip J. Guerney, S. O’ Leary, André R. Laplante

    "Concentration of dense mineral phases (s.g. greater than 7) for characterisation of individual particles and mineral grains by electron microscopy is a well established technique for the detection an

    Jan 1, 2003

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Alkalic intrusion hosted copper-gold mineralization at the Lorraine deposit, north-central British Columbia

    By T. S. Heah, S. T. Bishop

    "The Lorraine property is located in the northern Intermontane Belt, north-central British Columbia. The property is underlain by intrusive rocks of the Duckling Creek Syenite Complex, an Early Jurass

    Jan 1, 1995

  • CIM
    Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processing

    By M. J. Michaud, M. J. Lavigne

    "A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o

    Jan 1, 2003

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001

  • CIM
    Drum Hoists ? Case Study

    By Gordon F. Scott

    This paper considers a recently completed hoist project for IAMGOLD. Called the Westwood project, this mine utilises some of the largest drum hoists supplied to the North American Market in recent tim

    May 1, 2011

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Heap Leaching in Ontario - An Example

    By W. J. Witte, M. K. Witte

    "The purpose of this report is to present a generalized preliminary design and cost estimates for a typical heap leach operation such as might be undertaken in Northern Ontario. This report should be

    Jan 1, 1985

  • CIM
    The Cobalt Mining District: Silver Sources, Transport and Deposition

    By Dan Marshall, David H. Watkinson

    Abstract - Cobalt, Ontario, is renowned for the 12.6 billion grams (445 million ounces) of silver produced from the area since discovery in 1903 by workers of the Timiskaming and Northern Ontario Rail

    Jan 1, 2000

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should Know

    By Tony Lipiec, Greg Gosson

    "When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun

    Jan 1, 2010

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Evolution of SAG Mill Process Control at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Erik Bartsch, Guy Comeau

    "The Xstrata Nickel Raglan Concentrator, located at the northern limit of Quebec’s Nunavik region has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high grade

    Jan 1, 2008