Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Novel Method of Assessing Energetic Customer Baselines and Energy Savings in Mining Processes

    By Constantin D. Pitis

    Similarly to notions of constant capital/expenses in business or magnetization power for electric motors an energetic base load (E0) is always necessary to set up a mining process. Denominated as ?n

    Oct 1, 2009

  • CIM
    The Development of a Novel Zinc Collector Using Both Lab and Mil Scale Trials

    By D. E. M. Plaumann, B. S. Fee, R. D. Hansen, R. R. Klimpel

    "The steps from experimental curiosity through to commercial product can be slow and tortuous in spite of the quality of the technological advances offered by the new development. Data generation and

    Jan 1, 1990

  • CIM
    A Shaba-type Cu-Co(-Ni) Deposit at Luamata, West of the Kabompo Dome, Northwestern Zambia

    By Nicholas Macrae Steven

    Abstract - The Shaba-type Luamata Cu-Co(-Ni) deposit (11°50_S, 24°28_E) is located in a tectonic slice of Katangan Roan Supergroup (Mines Group) sedimentary rocks, surrounded by younger Kundelungu Sup

    Jan 1, 2000

  • CIM
    Experimental and Thermodynamic Modelling Study of the Effects of Al2O3, CaO and MgO Impurities on Gas/Slag/Matte/Spinel Equilibria In The “Cu2O”-“FeO”-SiO2-S-Al2O3-CaO-MgO System

    By T. Hidayat, D. Shishin, S. Sineva, M. Shevchenko

    The effects of the slagging components Al2O3, CaO and MgO on the thermodynamics and phase equilibria of the gas/slag/matte system with major elements “Cu2O”-“FeO”-SiO2-S are characterised using an int

    Jan 1, 2019

  • CIM
    Predictive Control and Real Time Optimization in the Minerals Industry

    By Quin Dennis

    Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el

    Nov 1, 2011

  • CIM
    The Brewery Creek Heap Leach Project.

    By Brad Thrall

    "Viceroy Resource Corporation of Vancouver, B.C. has recently developed the Brewery Creek Mine, an open pit heap leach gold mine 55km East of Dawson City in Yukon, Canada. Mineable reserves are 17.1 m

    Jan 1, 1997

  • CIM
    Operational Data and Maintenance Reliability

    By Justin S. Johnsen

    As OEM sensors and interfaces have grown in number, the available data from equipment in the mining environment has continued to multiply. This equates to an increased visibility of operating performa

    Nov 1, 2011

  • CIM
    Bubble Surface Area Flux: A Parameter to Characterize Flotation Cells

    By R. Filippone, Donald Leroux, Colin Hardie, G. Leichtle, Cesar Gomez, Jim A. Finch

    "Bubble surface area flux (Sb) is the surface area of bubbles per unit time per unit cross-sectional area of flotation machine. The units are: (m2 bubble surface/s)/(m2 cell) or s -1. For bubbles of m

    Jan 1, 1999

  • CIM
    Radiometric Techniques in Heavy Mineral Exploration and Exploitation (a533ff83-da77-414b-aaa6-da379b7ff5f7)

    By C. Stapel, AA Groningen, R. J. De Meijer

    "In recent years the Environmental Research Group of the KVI has been developing a number of radiometric techniques that may be employed in mineral sand exploration. These techniques involve: radiomet

    Jan 1, 1994

  • CIM
    Induration Machine Advanced Process Control (APC) at the Iron Ore Company of Canada

    By Robert J. Kuhne

    The Iron Ore Company of Canada has successfully employed advanced process control (APC) to optimize the operation of their induration machines. A significant increase in machine throughput and a redu

    May 1, 2007

  • CIM
    Using Effective Stress Theory to Characterize the Behavior of Backfill

    The importance of understanding the behaviour of cemented paste backfill (CPB) within the framework of the effective stress concept is highlighted in this paper. Only through an understanding built on

    May 1, 2007

  • CIM
    Geomechanics Strategies for Rockburst Management at Vale Inco Creighton Mine

    By F. Malek

    At Creighton Mine, magnitude events are a regular occurrence due to depth and major seismically-active structures. Over the last ten years, major advances have been made in research and development to

    May 1, 2009

  • CIM
    The Adams Mine Iron Ore to Pellets

    By G. B. Bell

    "INTRODUCTION On February 1, 1962, after five years of exploration and research, Jones & Laughlin Steel Corporation announced that they would develop the Adams Mine. Plant construction began immediate

    Jan 1, 1973

  • CIM
    Using airborne magnetic and electromagnetic data to monitor mine tailings in Copper Cliff, northern Ontario

    By J. Shang, P. Howarth, B. Morris

    Tailings from the nickel refinery in Copper Cliff, Ontario, consist of fine silicates mixed with a variable amount of conductive and magnetic minerals mainly associated with sulphides and iron oxides.

    Jan 1, 2001

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    The Union Bay Platinum Prospect, SE Alaska, a Hydrothermal PGE Deposit

    By C. J. Van Treeck

    PGE concentrations of 18 g/t occur in the pyroxene rich rocks at the Union Bay Alaskantype complex. This PGE enrichment is hosted in magnetite veins. These veins cross magmatic layering and have an ir

    May 1, 2003

  • CIM
    Development of Barrick Gold’s Bulyanhulu Mine

    By John Frostiak

    "Kahama Mining Corporation Limited, a wholly owned subsidiary of Barrick Gold Corporation, poured the first dore bar and filtered the first concentrate produced at the Bulyanhulu mine on February 28,

    Jan 1, 2003

  • CIM
    Vision for a Risk Adverse Integrated Geometallurgy Framework

    By Guillermo Turner-Saad

    "Best practice in the economic evaluation of mining projects and operations is based on the integration of geological, mining, metallurgical, environmental, marketing, economic and corporate informati

    Jan 1, 2010

  • CIM
    Scales or Scoundrels

    By Ron Board

    "Probably the only thing that can he said about conveyor belt scales without fear of contradiction is that they have been responsible for as much or more puzzlement, argument and frustration than almo

    Jan 1, 1975

  • CIM
    Mineralogical Evaluation of Au-Sb-As Mineralization from the ADMW Zones, Clarence Stream Property, New Brunswick

    By Louis J. Cabri, Donald Hoy

    "Samples with contrasting gold mineralization were studied quantitatively prior to metallurgical tests. The AD samples are coarser-grained and characterized by abundant Sb minerals (jamesonite, berthi

    Jan 1, 2007