Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)

    By J. R. Goode

    "The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S

    Jan 1, 2004

  • CIM
    Developments and Trends in Mining in the Slovak Republic

    By P. Cicmanec

    Mining activities in the territory of Slovakia have a long history. Mining techniques have developed rapidly in the last centuries. This paper deals not only with mining history, but also with undergr

    Aug 1, 2013

  • CIM
    Techniques for Coarse-Particle Beneficiation of Some Gold Ores and Methods of Determining Potential for Sorting Any Gold Ore Deposit."

    By Steve Wilkinson

    """Techniques for coarse-particle beneficiation of some gold ores and methods for determining potential for sorting any gold ore deposit.""With the advent of high speed computers, laser technology end

    Jan 1, 1985

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Alkaline Pressure Oxidation Barrick Mercur Experience

    By P. T. O'Kane

    "INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me

    Jan 1, 1989

  • CIM
    The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central America

    By Paul Hosford, Tim Haldane

    "The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate

    Jan 1, 2002

  • CIM
    Advancements in Coarse and Fine Particle Flotation

    By M. Fan, M. Mankosa, G. Luttrell

    "Column and other non-conventional flotation approaches continue to provide benefits where conventional flotation processes have exhibited limited success. This is particularly evident with respect to

    Jan 1, 2010

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • CIM
    Flotation Performance Improvement at Placer Dome Kanowna Belle Gold Mine

    By S. Schwartz, T. Bilney

    "Over recent years a number of techniques have been developed as part of the AMIRA1 P9 project to represent mathematically or measure directly sub-processes occurring in flotation cells. These include

    Jan 1, 2005

  • CIM
    “Over the Hills and Far Away” Long Distance Slurry Pipelines in Mountainous Regions

    By Donald J. Hallbom

    "While pipeline hydrotransport is often the most economical way to transport large volumes of mineral concentrate, tailings, or fine ore slurry over long distances, it is in mountainous terrain that p

    Jan 1, 2006

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    New Mill Design for Large Grinding Mills

    By Kjell Winther

    "Hydralift Scanmec introduced early in the eighties a new and different mill design for very large grinding mills. The design described has actually no size limitation upwards and is so far suggested

    Jan 1, 1995

  • CIM
    Knelson-Deswik Milling Technology: Bridging the Gap between Low and High Speed Stirred Mills

    By David Rahal, Des Erasmus, Ken Major

    "Over the past twenty years there has been an increased emphasis on fine grinding in the minerals industry. This spurred the development of a range of new fine grinding equipment in the 1990s. At that

    Jan 1, 2011

  • CIM
    Cluff Lake Mill - Phase 2 Expansion

    By H. A. Schnell

    "The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m

    Jan 1, 1985

  • CIM
    Integrated Computer Aided Open Pit Design and Planning ?A Case Study?

    By Oyku Selimoglu

    The key to successful mine production plan and subsequent operation is efficient mine layout design and optimization. Pit layout design and optimization allow the delineation and extraction of mineab

    May 1, 2007

  • CIM
    Operating Practices at Peñoles Concentrators – Mexico

    By Rodolfo Espinosa

    "Industrias Peñoles, S.A. de C.V. in Mexico, has nine mining operations, six managed by Peñoles (base metal mines) and three managed by Fresnillo plc (precious metal mines). Seven of the operations us

    Jan 1, 2011